Present & Permanent Address:
***/* ******** ***** ***** Road (S),
Ramakrishna Puram Housing Complex,
Flat-A202, North 24 Parganas,
Kolkata-700036
Email: adgm3w@r.postjobfree.com
Ph No: +91-905******* (Kolkata)
+91-704******* (Kolkata)
CAREER OBJECTIVE
To achieve an excellence in the field of Mechanical and build up a long successful career in the industry, seeking an environment where my knowledge can be shared & enriched.
PERSONAL DETAIL
Father’s Name – Gokul Chandra Achari
Date of Birth – 2nd December 1987
Sex & Material status – Male, Single
Nationality – Indian
Passport No. – K7619520
(Date of Issue –18/04/2013 & Date of Expiry 17/04/2023) Language Known – English & Bengali (Read, Write, Speak) Hindi (Read & Speak) Hobbies – Event Organizing
EDUCATION DETAIL
\
2005-2008 Diploma in Mechanical Engineering West Bengal State Council of Technical
Education.
2003-2005 Higher Secondary West Bengal Council
For Higher Secondary
Education.
2001-2003 Secondary West Bengal Council
For Secondary
Education.
COMPUTER SKILLS
• Microsoft Office (Word, Excel, Power Point)
• AutoCAD 2017
• Ship Constructor 2012,2013,2014 & 2018
• Nupass 6.1
• Cadmetic
• Aveva Marine 12.1
ARINDAM ACHARI Page 2 Of 6
WORKING EXPERIENCE
1. Tata Motors Ltd.
2. ESAB India Ltd.
4. Axsys Technology Ltd.
5. Cyber Marine Production Engineering Pvt. Ltd.
6. Ashmi Engineering & Advisory Services Pvt. Ltd. 7. SS Engineering Consultancy Pvt. Ltd. (continuing)
• Total Experience– 10 Year & 5 Month
S.S ENGINEERING & CONSULTANCY PVT. LTD.
ASHMI ENGINEERING & ADVISORY SERVICES PVT. LTD.
AXSYS TECHNOLOGIES LTD.
CYBER MARINE PRODUCTION ENGINEERING PVT. LTD.
Sr. no Duration Area Work Responsibility
1
1 Month &
Continuing
Project Work
Shallow Water
Corvate
Working as a Senior Designer
1. Detail Design(Modeling)
2. Preparation of Production Deliverable.
3. Generation of Production Information
4. Project Management.
Sr. no Duration Area Work Responsibility
1
1 Yr.
Project Work
1.27M CREW
BOAT
Working as a Senior Designer
1. Detail Design(Modeling)
2. Preparation of Production Drawing.
3. Generation of Production Information
4. Project Management, Project follow-
up.
Sr. no Duration Area Work Responsibility
1
1 Yr. & 4
Month
Project Work
1. P17 Alpha
2. Cable Laying
Vessel,
3. JW Turret
Working as a Senior Designer
1. Detail Design(Modeling)
2. Preparation of Production Drawing.
3. Generation of Production Information
4. Project Management, Project follow
up.
Sr. no Duration Area Work Responsibility
1
2 Yr. 6
Month
Project
Work(Coast
Guard
Training
Ship)
Working as a Designer
1. Detail Design(Modeling)
2. Preparation of Production Drawing.
3. Generation of Production
Information(Profile sketch, Work Break
Down Sketches, Bending Template,
Bending Information).
ARINDAM ACHARI Page 3 Of 6
AXSYS TECHNOLOGIES LIMITED
ESAB INDIA LTD.
Sr. no Area Scope of Work
1 Production Supervising in SAW, MIG Production & Electrode Rod Production By Extrusion Process; Batching Plant.
2
Production
& Process
Improvement
Welding performance Test, Quality Control During
Production, Process Development (Finding Route Cause of less Quality, Find Out Possible Area of Control, Testing Before Implement, Implementation)
TATA MOTORS LTD.
Sr. no Duration Area Scope of Work
1 3 month Assembly
Shop(SINGUR)
Working as a Jr. Supervisor of Under Body
Line & Mechanical line
2
3 month
Training Shop &
Capital
Equipment
Manufacturing
(JAMSEDPUR)
Acquire hand on experience on fitting,
milling, lathe, grinding, MMV, welding.
3
3 month
Central Planning
Engineering
Department
(SINGUR)
Working in Duct fabrication, Installing,
Detail study of drawing, Making Single Line
Diagram. Register making for maintaining
accountability of various items & machines.
Follow up the total process of Dismantling,
Damage prevention, Packing, Loading,
Dispatching, Receiving & further Installing.
4
3month
Human
Development &
Training
(GUJARAT)
Planning, Organize & execution of
Recruitment (ITI campus interview), Data
Processing, Hard copy maintaining &
creating individual file for man power hiring
until completion of joining process of
operator level recruitment.
Sr. no Duration Area Work Responsibility
1
4years
Project Work
1) (PSV-I,
2) AHTS,
3) 200
Passenger
Ship,
4) PSV-II)
Working as a Junior Designer
5. Detail Design(Modeling)
6. Preparation of Production Drawing.
7. Generation of Production
Information(Profile sketch, Work Break
Down Sketches, Bending Template,
Bending Information)
8. Nesting.
ARINDAM ACHARI Page 4 Of 6
PROJECTS:
1. Platform Supply vessel-I
2. Anchor Handling Tug
3. 200 Passenger Ship
4. Platform Supply vessel-II
5. Oil Distribution Platform
6. Coast Guard Training Ship.
7. Crab Catcher.
8. Frigate.
9. Cable laying Vessel.
10. JW Turret
11. 27M Crew Boat.
12. Shallow Water Corvate.
PROJECT DETAIL:
Platform Supply Vessel-I (L&T Ship Bulding/Chennai):-
• Project Duration -6 Month
• Software Used – Nupass, Nestrix
• Work Responsibility-
a) Detail Design (Modeling), Thruster Block, Bulwark of Whole Project.
b) Preparing WBD Sequence
c) Preparation of Production Drawing.
d) Generation Of Production Information(Profile sketch, Work Break Down Sketches, Bending Template, Bending Information) e) Nesting
Anchor Handling Tug (L&T Ship Building/Chennai):-
• Project Duration -9 Month
• Software Used – Nupass, Nestrix
• Work Responsibility-
a) Detail Design (Modeling), Accommodation, Bulwark of Whole Project.
b) Preparing WBD Sequence
c) Preparation Of Production Drawing
d) Generation Of Production Information (Profile sketch, Work Break Down Sketches, Bending Template, Bending Information. 200 Passenger Ship (Colombo Dock Yard LTD/ Sri Lanka):-
• Project Duration -2Month
• Software Used – Ship constructor
• Work Responsibility-
a) To find out discrepancy into model as per class drawing. b) Modification of model as per Class Comments.
c) Preparation of production drawing
d) Preparing WBD sequence
e) Generation of Production Information(Profile sketches) ARINDAM ACHARI Page 5 Of 6
Platform Supply Vessel-II (L&T Ship Building/Chennai):-
• Project Duration -3 Month
• Software Used – Nupass
• Work Responsibility-
a) To find out discrepancy into model as per class drawing. b) Detail Design(Modeling/All Accommodation Blocks,Chain Locker room, Crain post Foundation, Emergency DG Seating) c) Preparing WBD Sequence
d) Preparation of Production Drawing.
e) Generation of Production Information (Profile sketch, Work Break down Sketches, Bending Template, Bending Information. Platform (Rashid-C/Dubai Dry Dock World) :-
• Project Duration - 1yr.
• Software Used – Ship Constructor
• Work Responsibility-
a) To find out discrepancy into model as per class drawing. b) Detail Design(Modeling of platform, Jacket area detail, Boat Landing, Stair, Ladder, Handrail, Valve vent access platform, Riser Clamp)
c) Preparing Product Hierarchy.
d) Preparation of Assembly Drawing.
e) Generation of Production Information (Profile sketch, Assay Drawing. Partial, modification Drawing, Part list, Nesting) Coast Guard Training Ship, Cargo Ship, Crab Catcher (Reliance Defense/Gujarat):-
• Project Duration - 2 Yr. 6 Month.
• Software Used – Aveva Marine, Auto CAD.
• Work Responsibility-
a) Detail Design (Modeling)
b) Preparation Of Production drawing
c) Preparing Product Hierarchy.
d) Preparation of Assembly Drawing.
e) Generation of Production Information (Profile sketch, Assay Drawing, Part list)
f) Composite arrangement drawing of Outfit.
Frigate (P17 Alpha) (Garden Reach Ship Building/Kolkata):-
• Project Duration – 8 Month.
• Software Used – Aveva Marine, Auto CAD.( P17 Alpha)
• Work Responsibility-
a) Detail Design (Modeling)
b) Preparation Of Production drawing
c) Preparing Product Hierarchy.
d) Preparation of Assembly Drawing.
e) Project Management, Project follow up
ARINDAM ACHARI Page 6 Of 6
Cable Laying Vessel (Colombo Dock Yeard PLC/Sri Lanka)
• Project Duration – 3 Month.
• Software Used – Aveva Marine,
• Work Responsibility-
a) Detail Design (Modeling)
b) Preparation Of Production drawing
c) Software training given to client side employee. e) Project Management, Project follow up.
JW Turret (Dubai Dry Dock World/Dubai)
• Project Duration – 3 Months
• Software Used – Ship Constructor
• Work Responsibility-
a) Detail Design (Modeling)
b) Preparation Of Production drawing
c) Preparing Product Hierarchy.
d) Preparation of Assembly Drawing.
e) Generation of Production Information (Profile sketch, Assay Drawing, Part list)
f) Follow up Production system, Document Control, Procurement status.
g) Daily follow up all query related matter for entire project with yard and client.
27M Crew Boat
• Project Duration – 1 Year
• Software Used – Auto Cad & Aveva Marine
• Work Responsibility-
a) Basic Design.
b) Preparation Of Structural drawing For IRS approval c) Preparing Product Hierarchy.
f) Follow up Production system, Document Control, Approval follow up
g) Daily follow up all query related matter for entire project. SW Corvate (GRSE)
• Project Duration – 1 Month & Continuing
• Software Used – Aveva Marine
• Work Responsibility-
a) Detail Design (Modeling)
b) Preparation Of Production drawing
c) Preparing Product Hierarchy.
d) Preparation of Assembly Drawing.
e) Generation of Production Information (Profile sketch, Assay Drawing, Part list)
DECLARATION
I hereby declare that the above mentioned information are correct up to my knowledge and I bear the responsibility for the correctness of the above mentioned particulars.
Date – 23.07.2020 Signature – Arindam Achari
Place – Kolkata (West Bengal)