Post Job Free
Sign in

Engineer Power Plant

Location:
Al Dafna, Qatar
Posted:
October 03, 2020

Contact this candidate

Resume:

*

With over ** years built up on my MEP Construction experience, Diversified between all Construction fields, Started from the Design as a Designer of Mechanical systems & HVAC various systems, then On Site as a Project Engineer, furtherly extended on the Construction supervision & Quality control, as a Senior MEP Site supervision engineer, and Continuing on Construction as a MEP Construction Manager, And currently as a MEP Project Manager, I am utilizing my built-up experiences and knowledge to build, enrich, cooperate & delegate new teams on each new job, that empower me to handle the full MEP scope of works on a number of Mega scale projects (Al Thumama FIFA WC Stadium, Light Rail Stations, Strategic Food Storage Facility, District cooling Plants & etc.) Building, Managing & handling all the Site/Construction responsibilities in addition to managing the Technical & Design teams in a Professional, Healthy and Efficient relation attitude, harvesting & sharing the success with my team & colleagues.

Proud of that diversity on my experience which gave me the solid background on my field, And always doing my best to develop, enhance & strengthen my Managerial, Planning, Communication, Technical, Team Motivation, Stress Management capabilities.

Hardworking, disciplined and can interact productively with people from different backgrounds. NATIONALITY

Egyptian

DATE OF BIRTH

9/9/1984

LANGUAGES

Language Skills:

- Arabic: Mother Tongue.

- English: Fluent both spoken & written.

- French: Good.

EDUCATION AND PROFESSIONAL QUALIFICATIONS

- B.Sc. Mechanical Engineering, Suez Canal University, Egypt, 2006.

- Member of the Egyptian Syndicate of Engineers.

Ahmed Majdi Jamal Labib Zakaria MEP Manager

Current address: Doha, Qatar

Home address: Nasr city, Cairo - Egypt

Tel. 009**-******** – 002 010********

***.**********@*****.***

2

EXPERIENCE

• June 2014-Date, in Doha, Qatar

In AL-Jaber Engineering & contracting (JEC);

Currently MEP Manager

2014- 2017 MEP Technical Manager

On an extremely aggressive and fast track professional environment, we were always committed to deliver and achieve very complicated and extensive targets, I have always kept my commitment to do my best to contribute my part on the success of my firm.

Handling & Managing the MEP commitments & responsibilities, for several mega projects types throughout its different stages.

• Building and managing strong relations with all project’s internal & external parties (Client’s team(s), Consultants), Securing a robust understanding throughout the design & engineering deliverables production.

• Study, evaluate and identify all tasks and risks from bidding to project undertaking, implementation and up to the final completion of the project.

• Initiate site activity investigations and assessments.

• Reviewing the received projects budget and Preparing cost estimates, cost analysis and budgets for my project with projected forecasts.

• Prepare an accurate/precise mobilization plan, that shall achieve the best adherence to the project construction program.

• Prepare a list of potential vendors and subcontractors, with all of the required documents and relevant assessments.

• Building a reliable strong team to handle all of the project responsibilities, ensuring the efficient robust organization.

• Evaluate and assess all the required equipment for the project, to ensure securing the same without affecting the planned construction activities.

• Design, develop and initiate a site-specific strict safety plan including an accident-free safe work environment.

• Following up with the Technical team, the Project’s Design development, Shop drawings along with all the Technical deliverable to ensure the accuracy, timely manner and adherence to the project program, And to secure all the professional qualified resources to undertake the same on the best professional way.

• Following up with the procurement & logistics team all the required materials procurement, deliveries, storage & handling, ensuring the close coordination, accurate pricing & full technical compliance.

• Initiate and implement best practices, procedures and standards in compliance with Company’s QHSE plans.

• Full coordination with the commercial team assuring the proper understanding of our Scope of works, invoicing, claims, variations and to understanding & resolving any commercial/contractual correspondences and issues.

• Supporting our planning team while building and finalizing the project baseline program, to ensure the accuracy of the proposed program.

• Analyze, evaluate and initiate potential energy conservation measures while executing a project.

• Lead, direct, assist and support construction teams to ensure deliverable processes on time and within the budget.

• On site management & proper activities follow up targeting best construction techniques and quality of delivered works.

• Review, analyze and approve expenditures for ongoing projects on a timely and periodic basis.

• Prepare detailed, accurate timely project reports (Daily, weekly & Monthly) including work schedules, implementations, deviations, change in subcontractors, customer issues and other related problems.

• Update and document all project schedules including implementation phases in a project and the management aspects.

3

Projects implemented,

• J-383 The Strategic food storage facility (SFSF).

• J-381 Al Thumama FIFA World Cup 2022 Stadium & Precinct.

• J-379 Lusail’s Light Rail Tram (LRT) 3 stations Marina-03, Marina 04 & Qatar Entertainment City 01

• J-376M UM EL HOUL POWER GENERTION PLANT- Full MEP scope of works.

• J-360M West bay Qatar Cool’s DCP-3, A District Cooling Plant serving the heart of Doha-West bay with a total capacity of 35000 TR in addition to a TES tank of 5000 TR.

• J-355 Water front commercial switching substation MEP services.

• J-345 Upgrading Messaied pump station & associated pipeline.

• CEO’s 3 Villas MEP works.

• DCEO Villa MEP works.

• VVIP floor on JEC’s HQs MEP works.

• VVIP SPA on JEC’s HQ MEP works.

• Cyclone fitness center MEP works.

• Tendering of the QEZ.01 Project with Manateq.

• Tendering of 3 Metro stations fit out packages with Al-Rail.

• Tending for AL Lusail FIFA World Cup 2022 Stadium & Precinct.

• Tending for Ras Abou Aboud FIFA World Cup 2022 Stadium & Precinct.

• April 2013-May 2014, in Kuwait

October 2012-April 2013, in Egypt

In AL-Kharafi National for Mechanical & Electrical works; as a Lead Mechanical Technical Engineer;

Contributing on the success of one of the largest Contractor’s on the region, with a wider level of exposure to industrial, power generation, water treatment, wastewater treatment To the Oil & gas projects. Responsible for the in-house Mechanical Design activities, for a number of projects through all stages starting from estimation, tendering, reaching the detailed design and construction. Also, Performed as a CFT leader (Cross functioning team leader) for projects tendering for large scale targeted projects combining all involved disciplines, studying accurately of all tender documents, specifications & Client’s requirements, producing fully engineered inputs for the Estimation teams to price and bid accordingly. Projects implemented:

• RO Main transfer pipeline from DMC to Kuwait university – (Kuwait)

• West Damietta power plant services buildings. (Egypt)

• KOC treated prine water pumping station. (Kuwait)

• EL Sulaibiya waste water extension treatment plant. (Kuwait)

• West Qurna rehabilitation of oil sites. (Iraq)

• REPLACEMENT OF SEPARATOR LEVEL CONTROL VALVES IN SOUTH AND EAST KUWAIT GCS. (Kuwait)

• EL Aweer waste water extension treatment plant. (Tendering) (Kuwait)

• Camp Al rifjan (US Army Facilities). (Kuwait)

• Sheikh Jaber substations 7,8,9,10 (Kuwait)

4

• July 2010-October 2012, in Egypt

In ECG Engineering Consultants Group S.A., Cairo;

as a Senior Mechanical Site Supervision Engineer

Under one of the most reputable consultancy firms on the middle east, my responsibilities were as following, Implement specific MEP (HVAC, Firefighting & plumbing) works in accordance with the work program of a project.

Prepare and assist with the preparation of technical reports, progress reports, schemes and bills of quantities. Super vision and hand over of MEP materials and equipment as per approved submittals and project specifications.

Inspection of all completed activities on site.

Super vision and hand over of executed MEP works as per approved shop drawings. Responding to any raised RFIs, ensuring to solve any on site works problems with contractor’s execution engineers.

Preparation of site instruction reports and non-conformance reports. Holding weekly meetings with the Contractors to ensure the quality measures and preparing quality reports. Coordinating with the Contactors the inspection test plan for all construction activities, snagging, testing and commissioning till the final handover to the Client for the following project:

• Madinaty project, Egypt. The project comprised the construction of the residential part (Over 600 building), 18-hole golf course, Utilities buildings, British school, Open air mall, North district services center, South district services center, medical center and the sporting club (which include over 20 separate building).

• January 2010- July 2010, in Egypt

In Masr Cool for HVAC contracting, Egypt;

as an HVAC Project Engineer.

Ensuring the accurate understanding of my contractual scope of work in addition to the project’s specifications, design packages & the project program. Proper understanding of the project’s baseline program and proceeding accordingly. Ensuring the quality of the received shop drawings, checking the quantity surveying teams raised material take offs, and pushing for the procurement of it, reviewing all the relevant technical & material submittals, raising any site inquiries & RFIs.

Planning and deployment of the manpower with clear assignments and continuous assessment tracking the overall team performance, and its production quality to maintain the required safety measures & project’s standards & requirements.

Close coordination with the quality control teams with all the project’s requirements, method of statements, IRMs & etc.

Close coordination with the technical team avoiding any mistakes or extra unnecessary works. Supervising the stores, with accurate coordination to receive the material on site. Handing over the completed works through inspections, preparing the weekly & monthly progress reports. Preparation of the invoices with the quantity surveyors amended with all the required IRs & documentation. Preparation of the red line drawings packages as site inputs for the As built packages. Conducting all the snagging, till the final testing & commissioning and hand over to the Client/Client representative.

For the following prestigious project:

• The Embassy of the Sultanate of Oman.

5

• 2008-2010, in Egypt

In The Electro-Mechanical office at the Egyptian Army Engineering Corps as an HVAC design Engineer

Designing High Performance HVAC systems that are fully integrated with all other systems & disciplines with in the project.

Efficient team member who learned & participated his input on the Design production process, Starting from the development of the design criteria(s), to conceptual designs, value engineering, Design Detailing toward optimum design, Performing field inspections to ensure best solutions & practices application. Ensuring all the time the detailed coordination with all disciplines, construction management teams & the Client’s team, during the design process

Providing all the required HVAC design deliverables throughout the Design stages, from the Design criteria, Conceptual layouts, Specifications, Detailed design layouts including all the required Load calculations, System sizing, System selection, Air distribution and Systems layouts & Systems controls. Projects implemented:

• International Youth Hostel Theater in ‘Luxor’

• GOE cement factory in ‘El Arish’ administrating building.

• Luxor cultural palace.

• El Oyoun Hospital in ‘Kobri El Koba’.

• Restructuring of ‘Al Geish’ stadium.

• Suzan Mubarak Children museum administrating building.

• El Nozha military airport rehabilitation.

• Giza Water Company.

• Cairo Water Company.

• Banque de Caire (Tala’t Harb branch).

• Banque de caire (Adly branch).

• Banque de caire (Yousef abbas branch).

• Orlando resort (El Ein El Sokhna).

• A residential & trading center New Cairo (Building 226).

• Lina administrating building (New Cairo).

• Masr bank sporting club in New Cairo.

• CAF building (participated in load estimation and design).

• Porto Ghalib marine life theater (participated in load estimation and design).

• Porto Ghalib Slide tower (participated in load estimation and design).

• Porto Ghalib rain forest (participated in load estimation and design). 6

• January 2007- December 2007, in Egypt

In M.E.G. (Middle East for Glass Manufacturing), Egypt As a Maintenance Shift Engineer for the Hot End Section & Blow Room. Supervising the whole section productivity, Continuous assessment of the production teams & Equipment performance, Preparation & conducting all the required preventive maintenance for all the molds and production lines equipment, daily inspection over spare parts stocks & requirements and daily reporting of this section.

ATTENDED COURSES

• IMC & NFPA92 Ventilation & Smoke (With a certification of Achievement from Building safety institute) - 2015.

• NFPA20 fire pump seminar (With a certification of Achievement from Building safety institute) -2015.

• Management & successful Leadership Skills-2014

• Team leading & communication skills-2014

• Value engineering-2010

• Six sigma- Green belt course-2008

COMPUTER SKILLS

Continuous learner, always ready to learn and develop my knowledge.

• Revit MEP 2014 (With a certification of completion from Autodesk).

• Navisworks Manage 2014 (With a certification of completion from Autodesk).

• Auto Cad all versions.

• Carrier Hourly Analysis Program HVAC design software.

• Windows & Microsoft Office

7

8



Contact this candidate