Post Job Free

Resume

Sign in

Engineer Civil

Location:
Qibla, Kuwait City, Kuwait
Salary:
1700 KD
Posted:
October 03, 2020

Contact this candidate

Resume:

Curriculum Vitae

Marwan HOBEIKA

Salmiya

Kuwait

Tel: 00965 – 51006016

Email: -adgl3e@r.postjobfree.com

PERSONAL DATA

Name Hobeika

First Name Marwan

Birth date 02.01.1991

Nationality Lebanese

Marital status Married

Languages: English: Spoken, understood and written excellent.

French: Spoken, understood and written

excellent.

Arabic: Spoken, understood and written

excellent (Native speaker).

EDUCATIONAL BACKGROUND

2019-2020 Swiss Business School(SBS)

Pursued a one-year Master Degree of business

Administration (MBA) in project management.

2009-2013 Lebanese University Faculty of Engineering II Pursued a five years bachelor’s degree in Civil

Engineering, Roumieh.

2001-2008 College St. Pierre (Baskinta / Lebanon)

Complementary and Secondary School (GS

Graduate).

1995-2001 College St. Pierre (Baskinta / Lebanon)

Primary School.

Certificates

2020 AUTODESK Certificate in Revit® For Architecture. References:

Recommendation letters are available upon request. Professional Summary

Skilled civil engineer with 8 years of experience in a variety of engineering aspects, four of which were in refinery project (Oil & Gas sector). Professional presence with ability to work independently with very little supervision. Motivated individual who is committed to delivering the highest quality service in challenging environments, following the safety rules and regulation. Skills

• Excellent critical thinking skills to identify alternative approaches and solutions to complex problems.

• Strong ability to manage material resources in order to determine appropriate use of facilities and equipment.

• Skilled in coordinating projects and keeping all parties on the same path in order to stay on schedule.

• Good negotiation skills when coordinating between clients and management.

• Good management skills in order to reach the projects goals.

• Strong ability to communicate by listening and asking the right questions as well as writing effective reports.

• Experience with analytical and scientific software, such as Revit, Robot, Etabs, and sap for structural calculation; AutoCAD for architectural drawings; Excel, word and Microsoft access for report and planning.

• Ability to identify system performance indicators and the appropriate actions necessary to correct performance in order to keep project goals on track. EXPERIENCE

Al Ghanim International, Kuwait

Project: Al Ghanim Palace Project/ Wafra Road Project Job Designation: Acting as Project Manager January 2020-Present Managing and directing all project activities in Al Ghanim Palace project as well as all civil work in Wafra road project.

Al Ghanim Palace Project

Al Ghanim Palace Project is a historical building located in Dasman and it is composed of 3 Floor (600 m each). The aim of the project is to renovate the existing part and rebuild the demolished part.

The work consists of planning, managing, directing, executing and delivering all the activities of Al Ghanim Palace Project:

o Strengthening of existing wall foundation.

o Strengthening of Sea stone and mud brick wall.

o Construction of new sea stone and mud brick wall. o Renovation of old ceiling (Composed of Chandal Wood and Bamboo Sheet). o Installation of new superstructure ceiling with FRP profiles. o Installation of terrazzo and Ajor tiles.

o Installation and renovation of door and windows. o Installation of internal and external render lime based. o Installation of VRF system floor mounted units.

o Installation of electrical, CCTV, Fire Fighting, Fire Alarm and lighting system.

Wafra road project.

Al Wafra Road Project is composed of existing road, intersections and bridges. The aim of the project is to rehabilitate the existing roads and construction of new roads.

The work consists of planning, managing, directing, executing and delivering the civil activities in Al Wafra road project:

o Box culvert.

o Slab on grade.

o Duct Banks.

o Concrete pavement.

o Retaining wall.

o Bridge columns.

Al Ghanim International, Kuwait

Project: Al Zor New Refinery Project

Job Designation: Project Engineer April 2016-January 2020 Project Engineer responsible of planning, supervising and delivering the Administration Building and the temporary facilities for the level 1 building according to all HSE and quality rules and regulation inside the New Refinery Project in Mina Al Zor. Level 1 Building is composed of 9 Buildings (Administration Building, Mosque, Cafeteria, Laboratory, CCR/OTS, Fire Station, Admin Carpark and Employee Carpark).

The work included:

Mobilization of temporary Site offices for level 1 Building:

• Installation of temporary access road: Consisted of planning and execution of temporary road. The objective of the installation of temporary road was to connect all the 9 buildings together with the site offices to the main Gate of the refinery.

• Installation of temporary Site offices: Consisted of designing, planning, installing and delivering the temporary site offices.

Administration Building:

The Administration Building consists of 6 floors (1800 m each), one basement (3000 m ) and an auditorium (400 m ).

• Geotechnical Work (for all admin building):

The work consists of planning, supervising and executing of piling works (using the CFA, bored pile method), dewatering works, excavation, compaction/ installation of blinding for pile cap, and installing of waterproofing membrane for all pile cap.

• Structural Work (for all admin building):

The work consists of planning and supervising the following works:

Fabrication and Installation of steel reinforcement and shuttering for raft foundation (3.5 m Depth), Column (rectangular and circular column), Retaining wall, Shaft, Slab & beams, staircase.

o The Cycle for each floor was 18 days:

a-1 day for all column.

b-4 days for all shafts & wall.

c-12 days for the slab.

d-1 day for inspection and casting the slab.

Installation of steel structure for auditorium roof.

• Finishing and architectural work:

Assigned for the finishing work of the basement, Level 2 and auditorium. The work consists of planning, following up and coordination between the MEP and Civil work. The work includes:

o All finishing type (floor, wall, ceiling, toilet, kitchen, bank reception, library and auditorium.

o All type of electrical, fire-fighting system, HVAC and IT works. o All type of aluminum partition, glass (Spider system), internal partition, circular door entrance, link bridge and atrium.

• Landscaping work (for all admin building):

Assigned for landscaping work around the basement of the Administration building. The work consists of planning, coordination, communication with other contractors to install their underground facilities in order to proceed for landscaping works. The work includes; o All waterproofing works.

o All type of waterproofing around the sleeves.

o Block wall.

o Backfilling works.

o Construction of walkways.

o Pavement works (Asphalt and concrete pavement).

Al Mabani General Contractors, Saudi Arabia

Project: Abha International Airport

Job Description: Pavement Engineer July 2015-April 2016 Pavement Engineer responsible of planning, executing and delivering all taxi way, run way and according to all HSE and quality rules and regulation. The work includes:

o Asphalt plant foundation (Preparing and concreting the foundations) o Construction of an asphalt apron (asphalt apron about sixty-two thousand five hundred square meter composite of four layers asphalt started from the natural ground level) o Earth work (Subgrade, Sub-base and base coarse for the new turning pad and the new apron)

o Milling and Resurfacing of the existing runway (Installation of glass grid on the areas showing cracks)

o Pavement (Asphalt work for the resurfacing areas, turning pad and the new apron) o Box culvert (Shuttering, laying concrete)

Project: Taif Airport

Job Description: Site Engineer September 2013- June 2015 Site Engineer responsible of planning, executing and delivering all taxi way, run way and sun shelter according to all HSE and quality rules and regulation. The work includes:

o Earth work (Subgrade, Sub-base, Base course, Graded area, Installing and Concreting of the ducts)

o Pavement work (Asphalt Pavement for multiple taxiways and runways. Concrete work for the apron and the Sun Shelter)

o Cat Eyes (Installation of the cat eyes)

o Signage, Rumble Strips and Bollards (Foundation and installation of all signage and bollards)

o Paint work (Painting for taxiways, runways and concrete apron) K-Abboud General Contractors, Lebanon February-August 2013 Assigned as Site Engineer for the structural and finishing work in Ouyoun El Siman. Associated Consulting Engineer (ACE), Lebanon July-September 2012 Trainee in the Structural Department located in Verdun. Performed design work for the extension of the existing quay wall for the Naval base in Jeddah KSA.

PAG Contracting S.A.L., Lebanon July - October 2011 Supervisor for the structural and finishing work in Faqra Club. PAG Contracting S.A.L, Lebanon August-September 2010 Supervisor for the finishing work for the two villas located in Faqra Club.