MUHAMMAD JUNAID QURESHI
Professional Civil Engineer with 25 Years of Experience in Construction of RESIDENTIAL, INDUSTRIAL & COMMERCIAL BUILDINGS.
SUMMARY
Profile: Male, 49, Married
Nationality: Pakistan
Permanent Residence Status Pakistan
Current Location: Pakistan (Karachi)
Contact: 009***********, adgkn9@r.postjobfree.com
Last position: Project Manager / Construction Manager
Building Construction
Last Company: Manazel Construction Company, Riyadh, KSA.
Reporting to: Director Projects
Member of Engineering council Pakistan and Kingdom of Saudi Arabia
as Consultant Engineer
KEY SKILLS
Fully capable of independently managing all type of civil / structural projects.
Excellent understanding of design coordination & construction management of Residential, Commercial, industrial and hospitals buildings.
Specialize in sub-structure elements such as piling, breast walls, retaining walls and deep excavated building.
Managing teams / groups, able to motivate, innovate and meet deadlines.
Fully capable of handling, buildings that involve high quality finish.
Ability to manage large foot print area projects of piping, drainage and communication.
Excellent understanding and handling of environment control buildings.
Experience of large façade buildings and classic elevations.
Sufficient experience of, BMS buildings with all latest safety assurance devices.
Good understanding and ability to prepare & interpret the lump sum or measurement based construction & services contracts.
Leading a project management team or working as a senior member of it.
WORK EXPERIENCE (23 YEARS) +
Aug. 2018 till present Soneri Builders & Developers Karachi, Pakistan
Project Manager – Building Construction at Omega Mall Airport, Karachi
It is a 1,500,000 sft. Commercial Building with all high-ends equipment’s. Following international standards of construction.
Nov. 2017 to June 2018 Lakhani Builders Karachi, Pakistan
Project Manager – Building Construction at Lakhani Presidency Karachi.
A residential Complex with 4 numbers of 18 story Towers, including Landscaping, Recreation Area and Luxury Pent Houses with roof top Swimming Pools
Sep. 2014 to July 2016 Manazel Construction Riyadh, Saudi Arabia
Project Manager – Building Construction @ Cardiac Imaging & Expansion of Paediatric and Adult ICU, KING ABDULAZIZ MEDICAL CITY – MINISTRY OF NATIONAL GUARD HEALTH AFFAIRS, CR
It is a BMS building with sub-control Unit, Pneumatic dispatch Tube system, Radiation repellent Lead lining structure, Medical Gas system, FM 200 Fire fighting system, Water cooled HVAC system and all most modern Essentials.
Construction Manager – Building Construction @ Boys & Girls School Complex in Al-Imam University Campus
Working on school complex project that includes 3 boy’s and 3 girl’s school buildings, It includes, site development, structural & architectural works, MEP and HVAC for each school.
Responsibilities include construction planning and management at site, coordination with consultant and client, quality control and technical management.
Prepared Extension of Time claim for the project and revised BOQ.
Managing technical submittals, shop drawings approval, material approvals and procurement of all construction materials.
Managing preparation and approvals of variation orders.
Managing progress monitoring and reporting system of the consultant including monthly progress reports, daily site activities reports, resource status, monthly quality control reports, monthly safety reports, etc.
2011 –2014 Rabi Builders Islamabad / Lahore Pakistan
Project Manager – Building Construction @ Rabi centre Islamabad & Lahore
Two A class shopping & residential Building with 600000 sft and 250000 sft construction area.
As a project manager involved in leading the construction and design team.
Procuring and installing of first ice skating rink in south Asia.
Suspended Glass floor procuring and installation.
Underground 4 basements parking area.
More than 1000 shear piles casting in place for retaining of loose strata.
Supervision of all on-going activities at site like civil works, Huge structural steel roof, Façade, fire fighting system, HVAC, MEP, and finishes works.
Amana Group of Industries Lahore, Pakistan
Project Manager – Building Construction @ Amana Mall Lahore.
600 retaining piles with 3 anchoring systems was the first responsibility.
Design coordination with all Consultants involved in the process.
Negotiation with different contractors regarding contract price, contract duration & other issues.
Supervision of all on-going activities at site, like civil works store building, structural steel roof, etc.
Dynamic and Static Load Testing
2009 - 2010 Lal Zada Construction company Muzaffarabad, Pakistan
Construction Manager – Building Construction @ Basic Health Unit NAkdar,
@Basic Health Unit Karan,
@Seed nursery Chakkar,
@DFO offices and parking Tandali.
These are the reconstructed area in Kashmir Pakistan after 2005 earthquake.
Involve in specialized building of seismic design.
Preparation of daily progress reports and invoicing.
Making RFI’s, PO’s and Submittals.
Preparation of initial work schedules and subsequent monitoring and updating of it.
Making interim payment certificates and supporting documents.
Preparation of technical and shop drawings for various items of work.
2001 - 2009 Lahore Projects Lahore, Pakistan
Project Manager & Consultant. In these span of years, I was involved in the following projects;
Mega Tower ( Haier Group of Industries)
Madina Tower (Paradise Group of Industries)
Madina Heights (Paradise Group of Industries)
Moon Centre (JB Builders)
Gulf Centre (Rabi Builders)
Mubarak Centre ( Kabul, Afghanistan )
S.V.A Ruba Tech ( Haier Group of Industries)
Moon heights ( JB Builders)
& Many luxury villas
MEGA TOWER
468000 sft of Shopping floors & offices. The shopping centre is well known for its beautiful elevation in the city. HVAC, MEP, Car Lift, Roof Top Parking and Glass cleaning Lift, are the main features of the Building.
MADINA TOWER
325000 sft area of Shopping centre and residential units. Main Features of this building is its vast and Beautiful Atrium with several Escalators and Elevators.
MADINA HEIGHTS
68000 sft covered area Shopping Mall and residential floors. First time in city introducing pent houses and Natural Grass on Roof Top & a External LCD display.
MOON CENTRE
Relatively small Mall, but with all luxurious features, typical Parking lift. It was built in a very congested area of the city.
GULF CENTRE
216070 sft of Display centres.
MUBARAK CENTRE
400000 sft. Shopping Mall in the centre of Kabul city. It is famous for its shopping
Environment.
S.V.A RUBA TECH
432500 sft of Factory area. Total Architectural Planning & Designing.
MOON HEIGHTS
200000 sft Shopping Mall. . Architectural planning and Top Supervision.
2000-2001 New Era Constructors pvt ltd. Islamabad, Pakistan
Project manager – Building Construction @ Special Education Centre Mardan (Ministry Of Education Pakistan)
As a Project Manager I was involved in coordination with Ministry of Women Development & Social Welfare.
Leading the Site, Commencing meeting with the Site Engineers and Authority Representatives to insure project Safety & in time completion with decided working capital.
1998 – 2000 Rabi Builders Rawalpindi, Pakistan
Project manager - Building Construction @ Rabi Centre Rawalpindi
It is a shopping Mall of 250000 sft built area and was constructed to give the city the first modern shopping site. As the Project Manager I was involved in project feasibility report, initial proposal drawings, making of biding documents, involved in commencing meeting with building authority, contractors, architects etc. provide working schedule & making progress reports and managing construction activities.
1994–1998 Noor construction company Pvt. Ltd. Karachi, Pakistan
Site Engineer @ water supply schemes, storage facility, O.H.W.T and pumping station.
The projects were of Sind Gov., Rural Development Site .I was directly involved in the site management, route mapping, inspection of conduits laying, O.H.W.T, Reservoirs and perforation and Pressure testing.
1992 – 1993 Nobel Pakistan Ltd. Karachi, Pakistan
Project Engineer @ Extension Building of Pakistan Telecommunication Ltd, Telephone exchange, Lee Market Karachi.
It was a government Owned Project. The main activates of this project were primary and secondary fibre optic laying. Precast manholes and handholds with Cabinet Boxes.
EDUCATION
1992 N.E.D. UNIVERSITY OF ENGINEERING AND TECHNOLOGY, KARACHI, PAKISTAN Post-graduation courses
1987-1992 N.E.D. UNIVERSITY OF ENGINEERING AND TECHNOLOGY, KARACHI, PAKISTAN
BE – Civil Engineering
I.T. SKILLS
Windows & Office tools
MS Office Expert
AutoCAD Expert
LANGUAGES
Urdu Native
English Fluent (medium of study)