Resume

Sign in

Engineer Manager

Location:
Riyadh, Saudi Arabia
Salary:
35000
Posted:
October 01, 2020

Contact this candidate

Resume:

HANY MOHAMED MAHMOUD

SAUDI ARABIA # +966*********)

E-mail : adgjte@r.postjobfree.com

Track Works specialist (Track installation, Turnouts, Embedded Tracks, etc.)

OBJECTIVE: To have the honor of joining your establishment, looking for better prospects.

PERSONAL DATA:

Date and place of birth: December 12th 1980 – Cairo

Marital status : Married (Have two children)

Nationality: Egyptian

ACADEMIC DEGREE:

Main course of study: BSc. Civil Engineering.

Institution: Faculty of Engineering, BENHA University,

General grade: "GOOD"

Graduation project: Soil and Foundation “EXCELLENT"

SKILLS:

1-Membership of Egyptian Engineers Syndicate.

2-Membership of Saudi Engineers Syndicate.

3-PC literate (Microsoft office, Windows, Internet Navigation& AutoCAD 2012.

4-Good communication and organizational skills.

5-Working with different cultures and tongues.

6-Team working with superiors and inferiors.

7-Ability of working under tension.

Computer skills:

1-Microsoft WINDOWS

2-MS OFFICE group.

3-AUTOCAD 2D.

4-Knowledge of BROKON soil design program.

5-Knowledge of SAP 2000 V.11.

6-Knowledge of PLAXIS V8.2 2D

7-Knowledge of ARMACAD V. 9

LANGUAGES:

Arabic: (Native Language).

English: Excellent written & reading and very good spoken.

Spanish: Beginner Writing & Beginner Spoken

WORK EXPERIENCE:

1- SALCEF S.P.A Italy, Saudi Arabia

Acting as a Sub-contractor for Track works.

Period time : June 2016 to present

. Position : Senior QA/QC engineer

. Project Assignment : Riyadh Metro project- LINE 3.

. Contractor : ANM (AR Riyadh New Mobility.

. Client : ADA (AR Riyadh Development Authority)

. Consultant : RMTC (Riyadh Metro Transit Consultants)

Nature of work:-

1. Organize, implement, conduct and manage the QA/QC Programs as per the Company's Quality Policy.

2. Coordinate the document controls of technical submittals, drawings, etc with the Project Team and to ensure that the QA/QC validation has been done, to ensure their issue, amendments and recall of controlled documents.

3. Submit the Required Method statement of the work procedure as well the ITPs.

4. Carry out the required inspection of Track installation process for the Turnouts, and special Tracks.

5. Carry out the required inspection of Track installation process, like Embedded Track systems, Cradle Track System, For Depots and Track over plinth System for the Mainline.

6. Coordinate all inspections, monitor the required tests for the Rail Welding Process like Slow Bend Test, NDT, etc..

7. Coordinate with the Client to close any related NCRs and to do the required actions.

8. Carry out the required inspection of the Approved Material Which Delivered to the site before using it with the Engineer.

9. Assist QA/QC Manager in conducting internal quality audits of the Consortium.

10. Attend Monthly Project Review Meetings (PRM) and alert the project team of any potential problems.

2-OBRASCON HUARTE LAIN (OHL) ARABIA “SPANISH CO.” Saudi Arabia.

Period time : April 2013 to May 2016

. Position : Senior QA/QC engineer

. Project Assignment: Haramain High Speed Rail (HHR) phase 2

. Project Value 12Milliar Saudi Riyal.

. Contractor : Al Shoula Alliance (OHL Arabia is one member)

. Client : Saudi Railways Organization

. Consultant : DBI. Dutch Bahn- consultants

Nature of work:-

1. Organize, implement, conduct and manage the QA/QC Programs as per the Company's Quality Policy.

2. Coordinate the document controls of technical submittals, drawings, etc with the Project Team and to ensure that the QA/QC validation has been done, to ensure their issue, amendments and recall of controlled documents.

3. Coordinate all inspections, monitor the required tests and record inspections and tests made pas the Contract Plan and Contract Specifications.

4. Liaise with the Client's representatives for the conduct of day-to-day quality related project activities.

5. Coordinate with the Project Manager regarding work performance and hold authority to stop work in any area where discrepancies remain uncorrected and/or cancel the stop work order upon satisfactory correction of noted deficiencies.

6. 4. Carry out the required inspection of Track installation process for the Turnouts, and special Tracks.

7. Carry out the required inspection of Track installation process, like Embedded Track systems, Cradle Track System, For Depots and Track over plinth System for the Mainline.

8. Coordinate all inspections, monitor the required tests for the Rail Welding Process like Slow Bend Test, NDT, etc.

9. Provide technical support to the Project Manager and guidance to site staff in submission of materials for approval, request for inspection, shop drawings, As-built drawings, O & M manual.

10. Assist QA/QC Manager in conducting internal quality audits.

11. Ensure that Non-Conformance Report (NCR) are raised once the activities deviated from the Contract Specifications or normal construction industry practices.

12. Coordinate with the project staff to compile and maintain pertinent records of inspection and testing until end of the contract and all pertinent records for retention on completion of the project.

13. Attend Monthly Project Review Meetings (PRM) and alert the project team of any potential problems.

3-Mohammed A.AL SWAILEM Company (MASCO) Medina, Saudi Arabia.

. Period time : July 2009 to Oct 2012

. Position : senior site engineer

. Project Assignment: Haramain High Speed Rail (HHR)

. Project Value : 12Milliar Saudi Riyal.

. Contractor : AL RAJHI Alliance (MASCO is membership of alliance)

. Client : Saudi Railways Organization

. Consultant : Dar AL-Handasah (Shair and Partners)

Nature of work:-

1.Review the shop drawing of earthwork and culvert related to the site condition.

2.Prepare, review all the contract for any subcontractor related to the work (earthwork, culvert….etc) and make comparison for all the subcontractors to choose the best from Qualification and price.

3.Review and supervisor the camps mobilization related to the project.

4.Review and supervisor anything related to the sector and connects with the site staff to solve it.

5.Prepare daily and weekly report to Managing director and client about the work progress.

6.Release land acquisition with client which obstruct alignment of the project.

7.Coordinate with any department in the ministry to have authorized letter for the work (electric,

Drainage, telecommunication …etc) .

4-From July 2007 to Sep, 2009: VINCI CONSTRUCTION

Grand Project Company (Cairo, Egypt).

. Period time : 2 years and 3 months

. Position : BAB El SHARIA station site engineer

. Project Assignment: CAIRO METRO LINE 3 PHASE 1 “ FROM ABBASIA TO ATTABA

. Project Value : 2.7 Millar dollars

. Contractor : Vinci Construction Grand Project ”Egyptian-French Joint Venture”

. Client : Egyptian counsel of tunnels

. Consultant : MOHARAM- BAKHOUM consultant & BOUYGUES” France”

Nature of work:-

1.Review the shop drawing of the construction and manage our teams to do the work correctly according it.

2.Prepare, review all the schedule to the work of sites with staff regarding to the priority to construct the station regarding to the schedule by the required quality

3.Review and supervisor the camp mobilization related to the project.

4.Review and supervisor anything related to the station and connects with the site staff to solve it.

5.Prepare daily and weekly report to Managing director and client about the work progress.

6.Release land acquisition with client which obstruct the station position..

7.Coordinate with the design office and the technical office to solve any problem in the drawing or site

5-From June 2006 to July 2007: A-CONSULT CONSULTANT OFFICE (Cairo, Egypt).

. Period time : 1 year and 1 month

. Position : GEOTECHNICAL SITE ENGINEER and geotechnical office engineer “soil investigations”

. Project Assignment: CAIRO METRO LINE 3 PHASE 1 “FROM ABBASIA TO ATTABA

. Project Value : 2.7 Millar dollars

. Contractor : Vinci Construction Grand Project “Egyptian-French Joint Venture”

. Client : Egyptian counsel of tunnels

. Consultant : MOHARAM- BAKHOUM consultant & BOUYGUES “France consultant office”

Nature of work:-

1.Review the shop drawing of the construction and manage our teams to do the work correctly according it.

2.Prepare, review all the schedule to the work of sites with staff regarding to the priority to construct the station regarding to the schedule by the required quality

3.Review and supervisor the camp mobilization related to the project.

4.Review and supervisor anything related to the station and connects with the site staff to solve it.

5.Prepare daily and weekly report to Managing director and client about the work progress.

6.Release land acquisition with client which obstruct the station position..

7.Coordinate with the design office and the technical office to solve any problem in the drawing or site

TRAINING

1-TRACKWORKS (Structuralia Spain)

Technical English using for Track works Oct 2015

Construction of Infrastructures Module 6; specific aspects of the project and construction of High Speed Railway Infrastructures. Oct 2015

Climate change Awareness. Oct 2015

2-Civil Works

BENHA walking steel bridge, Benha, Egypt

Training on the piles installation in the River Nile Aug 2001

IMBABA Water Planet, Cairo, Egypt

Training on special concrete works and studying of water treatment processes Aug 2002

Nile general co. for Irrigation and water Constructions

Training in the SITE INVESTIGATIONS in the main lab. Aug 2003

ARAB CONTRACTORS in “GOHRET ELHARAS EL GOMHORY” great project

Training of special concrete works and studying Aug 2006

Thank you



Contact this candidate