Post Job Free

Resume

Sign in

Electrical Engineer Power Plant

Location:
New Delhi, Delhi, India
Posted:
September 30, 2020

Contact this candidate

Resume:

Profile Summary

Offering over **.* years of rich experience in Electrical Design Engineering and Project Planning & Execution; presently associated with Samsung Engineering India Pvt. Ltd., Noida, as Senior Electrical Engineer.

Proficient in executing and planning designing projects with a flair for adopting modern methodologies in compliance with quality standards

Possess comprehensive knowledge about National and International Electrical Standards like IS, IEC, IEEE, Electrical Calculations, E-tap Study Reports, SLDs, Area Classification, Electrical Layouts, and Low Energy Systems Extensive experience in general administrative activities, man management, policy implementation and facilities management across assignments

Anchored on-site erection & commissioning activities and ensured completion of projects within the time & cost parameters and effective resource utilization to maximize the output Excellent relationship management, analytical and negotiation skills with expertise in swiftly ramping projects Core Competencies

Academic Details

B.Tech. in Electrical from Maulana Azad National Institute of Technology, Bhopal, MP with GGPA 7.13 in 2007

12th from Siddhartha Shishu Sadan, Biratnagar, Nepal 2001, 67.20% 10th from Siddhartha Shishu Sadan, Biratnagar, Nepal 1999, 75.57% Trainings

Protective Relay Coordination, ELC Mumbai in 2010

Operational Training for Generator, Fire Alarm System, PAGA System

& UPS System in 2015

Short-circuit calculation by IEC 60909 & Harmonic control in Electrical Power System in June 2020

Study of Power system protection in May 2020

Step & Touch Potential Calculation through IEEE:80 in Apr 2020 Restricted Earth Fault Protection for Transformers in Apr 2020 15 days industrial training at Satpura Thermal Power Plant, Sarni, Madhya Pradesh in 2006

IT Skills

Electrical Package: e-tap 12.0, AutoCAD, Lighting

Software - PhotoLux

Operating System: DOS, Windows & Windows XP

Professional

Application Software: Advance MS Office, Outlook, SAP & MARIAN System

Programming Languages: GW-BASIC, C++ & MATLAB

Procurement Software: SAP & Marian

Extracurricular Activities

Selected as a member of Indian Society for Technical Education

(ISTE) from 2003 to 2007

Participated in robotic events like ‘COGNIZANCE 2005’ at IIT- Roorkee and ‘GRIP 2005’ at TECNOSEARCH 2005 at MANIT Skill Set

Bijay Kumar Das

Electrical Design Engineering

Enterprising leader & planner with a strong record of contributions in streamlining operations, invigorating businesses, heightening productivity, systems & procedures, targeting senior level assignments in Project Planning/Electrical Design Engineering with an organization of high repute.

adgi3z@r.postjobfree.com Location Preference: Delhi NCR/Mumbai +91-858******* Project Management

Engineering & Development

Electrical Designing

Quality Assurance

Planning & Execution

Techno-Commercial Operations

Resource Management

Tender Drawing / Specifications

Manpower Planning

Change Agent

Collaborator

Communicator

Motivator

Career Timeline

Organisational Experience

Since Mar’20 with Samsung Engineering India Pvt. Ltd., Noida as Senior Electrical Engineer

Feb’19-Mar’20 with Mcdermott India Pvt. Ltd., Gurgaon as Senior Electrical Engineer

Jan’18 – Nov 18 with Thermon India Pvt. Ltd., Mumbai as Engineering Manager

Jul’16-Jan 18 with Indus Towers Ltd., Pune as

Electrical Planning Manager

Aug’14-Jul’16 with CH2M, Noida as Electrical Engineer Dec’11-Jul’14 with Cinda Engineering & Construction Pvt. Ltd., Noida as Electrical Engineer

Nov’07-Dec’11 with ESSAR Engineering Services Ltd., Mumbai as Deputy Manager

Growth Path:

Nov’07-Mar’08: GET

Apr’08-Apr’10: Assistant Manager

May’10-Dec’11: Deputy Manager

Key Result Areas: At Mcdermott India Pvt. Ltd.

Engineering procurement and construction assistance for Electrical system for LUKOIL-Nizhegorodnefteorgsintez" Petroleum Residue Processing Complex Stage I of the construction. Delayed coking unit. Kstovo, Russia. Developing project baselines; monitoring and controlling projects with respect to cost, resource deployment, time overruns and quality compliance to ensure satisfactory execution of projects

Formulating operating budgets and managing overall operations for executing the designing projects within cost & time norms; supervising the preparation of bills of various turnkey projects

Interacting with clientele to ascertain needs and developing graphic directions, concepts and specifications for assigned projects Preparing drawings through extensive study of technical documents on detailed engineering; resolving site queries to meet execution requirements; understanding the technical & functional specifications Key Result Areas: At Thermon India Pvt. Ltd.

Design of Electrical heat tracing for BPCL Kochin Refinery and BPCL Mahul Refinery. Cairn Aishwariya Oil field Project Barmer. & Reliance Industries. Collecting data for design and coordinating the entire operation including requirement analysis, finalizing specifications and designing; dealing directly with client for technical queries & giving best possible solution Managing the bidding process from floating of bids to awarding of contracts; coordinating with bidders with regard to negotiations Coordinating with external agencies for techno-commercial negotiations, preparation of tender / contract documents, cost estimates, including billing, variation / deviation proposals, claims, and so on Interpreting contractual obligations & rights and evaluation of technical / financial problems for management reporting

Leading, mentoring & monitoring the performance of team members to ensure efficiency in process operations and meeting of project targets Spearheading Transformer sizing, cable sizing, single line diagram for switchgear, connection diagrams, site layouts,

Creating and sustaining a dynamic environment that fosters development opportunities and motivates high performance amongst team members Reviewing the engineering/design changes & resolving quality related problems associated with design

Jul’16-Jan’ 18

Indus Towers Ltd., Pune

Electrical Planning Manager

Kalium, Dubai

as Logistics &

Supply Chain

Consultant

Dec’11-Jul’14

Cinda Engineering & Const.

Pvt. Ltd., Noida

Electrical Engineer

Aug’14-Jul’16

CH2M,Noida

Electrical Engineer

Nov’07-Dec’11

ESSAR Engineering

Services Ltd., Mumbai

Deputy Manager

(Electrical)

Jan ’18-Nov ‘18

Thermon India Pvt. Ltd.,

Mumbai

Engineering Manager

Mar’2020-Present

Samsung Engineering India Pvt.

Ltd., Noida

Senior Electrical Engineer,

Senior Electrical Engineer,

Feb’19-Mar’20

Mcdermott India Pvt. Ltd.,

Gurgaon

Senior Electrical Engineer,

Highlights:

At Indus Towers Ltd.

Streamlined Planning, Design and infrastructure upgrade for about 4500 sites for R Jio, Vodafone and Airtel BSC sites.

Elimination of third party survey and adoption of LBG based data for site upgrade and material planning, thus saving survey cost and time. Received green card appreciation from Vodafone Project manager for efficiently swapping of Vodafone BSC.

At CH2M

Facilitated technical supervision for AIS/GIS - substations for 220/132kV and 33kV voltages

Prepared Load List, SLDs and TBEs along with conducting Short Circuit Study and Load Flow Analysis

Streamlined vendor communication and approval of vendor drawings for various electrical equipment for following projects: o Madina Water Transmission System, Yanbu KSA

o 150MW Early Power Plant Rumaila Oil Field, Iraq

o Replacement of Pumps, Motors & Diesel Engines, GASCO Ruwais-UAE At ESSAR Engineering Services Ltd.

Prepared Basic and Detail Engineering Designs for 220/33kV, 33/11kV, 11/0.415kV substations

Effectively worked for the electrical requirement for various process units like DHDT, Crude Oil Tank (COT), Product Intermediate Tank (PIT), Oil Loading/ Unloading Gantry, Sea water Supply, and Water Treatment Plant of EOL Jamnagar

Sketched basic & detail designs for 33/11kV substation for ESSAR Oil Limited, Jamnagar Gujarat, which included selection of transformers cable sizing, APFC sizing, LV & MV panels, preparation of hazardous area classification drawing, cable schedule & interconnection diagram, electrical layouts & specifications and so on.

Technical Purview

220/33/11/6.6/0.415kV Substation Engineering: Experienced at 220kV GIS Substation and related AIS Equipment, preparation of protective SLDs and their interlocking with SCADA for Substation Automation System, Equipment Layout, Floor Cut-out Layout, Cable Tray Layout, Lighting Layout, Earthing & Lightning Protection Layout, FA /PA Layout Sizing/Calculations: Transformer sizing, Cable Sizing, APFC sizing, Earthing Calculations, Bus Bar Sizing, Lighting Calculations, DG Sizing, UPS Sizing, Battery Sizing, NGR Sizing

Preparation of Load List, Hazardous Area Classification, Area Earthing, Area Lighting, Cable & Power Layout

Cable schedule preparation, SS SB Interconnection, defining the I/O list for different Electrical Control Schemes, FA System and Fire Suppression System Layouts

Review of Vendor Drawings: Guaranteed Technical Particulars, Datasheet & GA Drawings, Manufacturing Quality Plans (MQP) of Equipment like Transformer, Motor, Switchgears, Junction Box, Local Control Station, Glands, Cable, Bus Ducts

Preparation of Factory Inspection Report with routine and functionality testing for - 11 kV, 6.6kV & 0.415 kV Switchboards, Capacitors, APFC Panel, LV / MV Cable, Bus Duct and Cable Tray

Fire Alarm System – Preparation of Specification for Fire Alarm (FA) System, Creation of Material Requisition, Evaluation of Technical Offers, Answering / Raising Technical Queries, Preparation of FA Layout for Substations, Satellite Buildings, Warehouse and Workshops Public Addressing System – Preparation of Specification for Public Addressing System, Creation of Material Requisition, Evaluation of Technical Offers, Answering / Raising TQ, Preparation of PA Layout for Substations, Satellite Buildings & Plant area.

Electrical Control System - Review and approval of Engineering Design Manual for Substation Monitoring & Load Shedding System. Personal Details

Date of Birth: 20th July 1983

Languages Known: English and Hindi

Address : 135B - SF, Krishna Colony., Abhay Khand–I, Ghaziabad – 201014, Uttar Pradesh

(Refer Annexure for Project Details)

ANNEXURE

Organisational Projects

For CH2M

Title: Replacement of Pumps, Motors & Diesel Engines, GASCO Ruwais, UAE Period: Oct’15-Jul’16

Description: 61 pumps and Motors were identified as part of replacement project and majority of existing pumps were as per API-610 and fitted with single mechanical seals. As the application of these pumps are HC, due to seal leaks hazardous vapor release to ambient condition increased. GASCO decided to replace the old pump with new pump and motor package with double mechanical seals, with latest international standards requirement Title: 150MW Early Power Plant Rumaila Oil Field, Iraq Period: Feb’15-Sep’15

Description: The Rumaila oil field is one of the largest oil fields in the world. It is located near Basra and about 20 miles from the Kuwaiti border in southern Iraq. The field was discovered by British Petroleum (BP) in 1953. Production began in 1972. The field contains oil at about 2,400m below the surface. More than 200 production wells are operating in the field. CPECC has entered into a contract with BP Iraq N.V. to undertake the engineering, procurement, construction, commissioning and two years operation of the 150 MW Early Power Plant Project.

Title: Madina Water Transmission System, Yanbu KSA Period: Aug’14-May’15

Description: This system was designed to transmit desalinated water from the Yanbu industrial area to Yanbu city, Rayyis and Madina with a capacity of 363,000 m /day. The project consists of four different groups of work: pipeline, stations, and reservoirs.

For Cinda Engineering & Construction Pvt. Ltd.

Title: CSCI Dahej Project

Period: Aug’13-Jul’14

Description: CSCI Project aimed to produce non-oriented silicon steel (CRNO) from grades 50C1000 to 35C360. Its annual production capacity is 200,000 metric tons. It provides motor rotors as small as penholders, motors for car windows, skylights, and shutters, oil-controlled motors for acceleration, large industrial motors, small- and medium-sized transformers, etc. Responsibilities:

Supervised technical bid evaluation process

Prepared SLD, Short Circuit Study, Load Flow Analysis Report, Relay Coordination Study, and FAT for 11 kV, 6.6kV & 0.415 kV switchboards & cables

Title: Petronet LNG Terminal Project, Dahej

Period: Apr’13-Jul’13

Description: Petronet LNG Terminal Project, located at Dahej in the state of Gujarat on the west coast, is to be expanded from its current receiving capacity of 10 mtpa to 15 mtpa.

Responsibility:

Performed detailed study of bidding documents and prepared MTO of the same Title: Petronet LNG Terminal Project Kochi

Period: Jul’12-Mar’13

Description: Petronet LNG Terminal Project is a Greenfield LNG Regasification terminal to be set at Puthuvypeen Special Economic Zone (SEZ) at Kochi, Kerala. The Project involved setting up of 2 LNG Storage Tanks, each of 160,000 m3 storage capacity of full containment type for storing LNG and allied equipment for boil-off gas recovery, gas vaporization, transmission & unloading of LNG and Send out and Regasification Facilities suitable for handling 2.5 MMTPA of LNG along with the associated facilities; Offshore facilities including the jetty, berthing of LNG Tankers and other associated facilities required for all weather operations of LNG ships of nominal capacities ranging from 65,000 to 216,000 m3.

Responsibility:

Conducted routine and functionality testing for 11 kV, 6.6 kV & 0.415 kV Switchboards, UPS, APFC Panel, LV / MV Cable, Bus Duct and Cable Tray Title: China Steel Corporation India (CSCI) Project, Dahej, Gujarat Period: Dec’11-Jun’12

Description: CSCI Project aims to produce non-oriented silicon steel (CRNO) from grades 50C1000 to 35C360. Its annual production capacity is 200,000 metric tons. It provides motor rotors as small as penholders, motors for car windows, skylights, and shutters, oil-controlled motors for acceleration, large industrial motors, small- and medium-sized transformers, etc. Responsibility:

Prepared basic and detail engineering design for substations Performed detailed study of bidding documents and prepared MTO of the same



Contact this candidate