SAZRUL ASWAD BIN SALLEH
Kuala Lumpur,Malaysia
Mob.: +60-146******
*************@*****.***
CONSTRUCTION PROJECT MANAGEMENT
** ***** ** *********** ************ experience in Brownfield & Greenfield Power Plants, Refinery, Petrochemical Plant, Gas Terminal, Factory & Maintenance Building, Infrastructure and Industrial construction works. Participated in key functional areas in Construction management and methodology, resources and risk management, planning and execution, Test/lab technical analysis, problem-solver and can manage a multi-cultural team. Review documents Work pack, JMS, JHA, HAZID, SIMOPS, RFI, S.I, Technical Query & methodology of construction which in line with HSE standards. Familiar with Petronas & Shell technical specs and safety procedure.
Construction work knowledge and accomplishments
• Accomplished in Civil and Structural works from Formation level to Handing Over - Deep foundation bored piles, earthworks, shoring (secant piles, sheet piles), shallow foundations (raft, spread footings, isolated and strip footings), steel reinforced concrete, structural steel works, post tensioned beam and slab, hollow core slab, precast concrete, table forms, different waterproofing system.
• Petronas Refinery Utilities and Offsite Includes Steam Generation Unit, Air Systems, Water Systems, Cooling Water Unit, EICS & ICSS, HV Substations, Interconnecting Pipe Rack, Wastewater Treating, and a large size campus area with Administration Building, Training Center, Laboratory, Central Control Room, and dozens of refinery support buildings for security, operations and maintenance.
• Infrastructure & Undergrounds – HDPE water intake cooling system, Monsoon drain and other common facilities. Spun pile piling works, excavation, backfilling, earthworks for Chemical Resin Plant. Road Asphalt and Concrete paving, Flood control, Underground Utility services and Storm water drainage.
• Architectural Finishes – curtain wall, aluminum and glazing works, glass reinforced concrete (GRC), stone wall cladding, dry wall cladding and false ceiling works, ceramic and marble tiling, terrazzo tiling, clay roof tiles, block works, joinery works, interior and exterior paint system, epoxy paint system, interlock paving works, swimming pool works, automated roll up doors, Elevator works.
• Oil Terminal Plant- Installation of Shell bottom loading skid for tanker lorry fueling, Tank farm pipe sleepers, Maximize loading/unloading fuel oil, Modification of Ron 95 shelter & foundation, Rerouting underground to above ground oil piping, Steel structure erection.
• Steel structure erection - Pipe rack foundation, steel platform, witness welding joint, torque checking, fillet welding visual inspection, modification to suit site. Health, Safety and Environmental Management
• Ensure HSE plans are in-placed, authorized and management responsibilities are clearly defined.
• Manage Project team to ensure HSE objectives and targets are achieved or exceeded
• Compliance with Project safety standards rules, PTW authority, LOTO.
• Conduct Daily safety toolbox briefing to vendors, subcontractors. EXECUTIVE CREDENTIALS
PROFESSIONAL EXPERIENCE
Employment History
July 2020 – Aug 2020 Bureau Veritas Pvt Ltd (India) – Civil Inspector Adani Yangon International Terminal Company Ltd – ICP Spun Pile Lumut Factory, Perak
• ICP Spun pile inspection process for 1000mm dia.
• Bending test inspection witness check and report.
• Pile joint welding inspection, testing and procedure.
• QAQC inspection report, test result, engineering data, certificate and others dossier required.
• Review SQP inspection and testing plan for material in process ‘spun piles’ class C. June 2019 – December 2019 Fujita Corporation – Senior Construction Engineer TOWAM - Construction production warehouse, 2 storey office and 2 storey M&E room
• Interpreted drawings, design, resolve discrepancies, carrying inspection of works.
• Performing quality control task on budget, schedules, plans and project performance.
• Collaborating with consultant and subcon to create efficient method.
• Prepare monthly report to client and presentation.
• Assisting site manager on claims, cost, schedule as well safety and health.
• Taking part in client meeting, consultants and follow up local authorities. Jan 2019 – May 2019 Exyte Malaysia Berhad (M+W Malaysia) – Senior CSA Supervisor Maintenance BBraun Medical Industries
• Oversee and manage execution of maintenance & repairing civil works required by client.
• Monitor, reports, open permit for daily maintenance work.
• Arrange meeting with client & plan work ahead with subcontractors.
• Perform repairing works, materials, manpower, schedule & machinery involved. June 2018 – Jan 2019
Novugen pharmaceutical 3 storey factory & 2 storey warehouse.
• Lead civil structure site team. Assist construction manager/project manager.
• Underground waste water process construction method as per drawings & specifications.
• Monitor pre-cast installation on site column, beam, slab, intermediate beam and in-situ.
• Monitoring works, manpower, vendor, including operator machinery backhoe, excavator, lifting crane etc. to perform infra work at site.
• Responsible overall building CSA progress.
• GMP Compliance due to clean room.
Dec 2016 – May 2018 Amec Foster Wheeler – Senior Construction Supervisor Shell Terminal & Truck Exit Project, Brownfield/shut down/retrofit
• Responsible for the successful initiation, planning, execution, monitoring, controlling and closure of Shell Terminal by accomplishing time.
• Completion VSD electrical building, including renovation works.
• Completed demolish & construct a new pump house for U-95 & Ago with steel structure shelter, Pipe rack footing for new gantry area, new inspection shelter.
• Monitoring progress and perform QAQC inspection activity.
• Installation of 180k ton of steel structure platform for petrol, Kerosene & diesel pipe line.
• Construction 26 types of concrete pipe sleepers including steel pipe support at tank farm area.
• Approved & review PTW,JHA,MS
Feb 2016 – Dec 2016 Technip Geoproduction (OUIJV) – Construction Field Supervisor Petronas Rapid Project (Offsite Utilities Infrastructure)
• Daily civil supervision, coordination, and successful completion of the project to meet time and cost objectives with respect to contracting, scheduling.
• Utilities Substation, Generator buildings, Storage Tanks, Heavy equipment & Pipe rack foundations, Asphalt roads, Utilities Concrete paving & Sewer drainage lines – Offsite/Logistic complex.
• Steam generation plant, Cooling tower, Fuel gas, Demi system, Air system – Processing complex.
• 33kv Substation and Process Interface buildings – Civil Structural steel works.
• Monitoring progress and perform QAQC inspection activity. Sept 2015 – Feb 2016 Jacobs Engineering – CSA Supervisor Chemical Resin Plant (EASTMAN), Greenfield/Extension
• Chemical process plant, Chilled water system, Dryer slurry plant, Control buildings 2 story, Liquor & dryer slurry plant, WWTP, Butcho & methanol storage unloading buildings, Pipe rack foundations – Civil & Structural works.
• Asphalt roads, Utilities Concrete paving & Sewer drainage lines – Infrastructure works.
• FDT Test, Tensile test, backfilling/compaction – Civil works.
• Monitoring progress and perform QAQC inspection activity.
• Soil improvement monitoring.
• To supervise the works as executed by the various teams, ensuring compliance with all HSE, QA/QC and productivity related targets.
Feb 2013 – Sept 2015 Samsung Engineering – Site Engineer 1071MW CCGT Power Plant, Brownfield/Upgrade
• Handling water intake onshore works, deep excavation, sheet pile, piling works, soil improvement.
• Installation HDPE pipe intake incoming from sea.
• Assist with supervision, coordination, and successful completion of the project to meet time and cost objectives with respect to contracting, scheduling, estimation, bidding and contract administration functions.
• Work closely with surveyor to counter check pile location.
• Monitoring pile record & test.
• Assist superintendent for installation earth retaining structure. Waller & Struts.
• Supervised installation of bracing system (Waller & struts) in correct sequence to avoid failure of soil condition as well as critical safety precautions.
• In-charge for GRP pipe installation including, sheet pile (welding work, cutting, lapping, driving), excavation 18m deep.
Feb 2011 – Jan 2013 WCT Berhad – Project Coordinator Architect Tuaran Hospital (76beds), (East Malaysia)
• Assisting Technical manager in drawings, document, review detail drawings, authority submission.
• Coordination work between civil & M&E activity on site, check discrepancies drawing.
• Manage architecture activity – Tiling, Epoxy, stainless steel counter top & Built in Furniture.
• Liaise with architect consultant for approval design furniture.
• Work closely with Resident Architect for defect works.
• Control the quality and time for subcontractor fabrication & installation architecture work on site.
• Comply with Ministry of Health, Public work department on standards, codes & regulation of proper Hospital requirement.
Dec 2009 – Feb 2011 Idaman Solution Sdn Bhd – Site Supervisor ASNB Bank Renovation (East Malaysia)
• Assign to work independently to supervise bank renovation & architecture (Built in furniture)
• Involved in renovation works, housing projects and tower. `Handlings materials, workers, QC, safety, meeting client and make sure all projects is on time.
• Renovation ASNB (Amanah Saham Nasional Berhad) at Miri, sarawak : completed March. 2010
• Renovation ASNB (Amanah Saham Nasional Berhad) at Sibu, Sarawak : completed June 2010
• Renovation ASNB (Amanah Saham Nasional Berhad) at Tawau, Sabah : completed Ogos 2010 Bachelor’s Degree in Civil Engineering, Dec 2009 - University of Technology Mara Diploma in Buildings, March 2007 - University of Technology Mara IWF by M+W (Incident Work Free) STA Training (Safety Task Assessment) PTW Authority Training (Permit to work) Environmental Quality Act (EQA 1974) Zeto Rules-Petronas ISO training on green building 3 Golden Rules-Shell 12 Life Saving Rules-Shell
9 Life Saving Rules-Jacobs
Health & safety – NIOSH managing safety & Environmental Certified Inspector of work - Registered with Board Engineering Malaysia (BEM) Certified Building Technologist - Registered with Board Engineering Malaysia (BEM) DOSH CIDB Green Card – ID W91030420060101
Oil and Gas Safety Passport – Niosh Malaysia
Contract and dispute resolution – Essential Construction Law by CIOB Certified Rigging & Signalman – Recognized for CEP JKKP IS 127/438/KLT1-2018/0084 MS Office
Microsoft Project
Sketch up pro
SAP software
CAD 2010
PDMS Software
Name Email Company Tittle Contact
Azim Baharan ****.*******@*****.*** OUIJV Technip Civil Superintendent 013******* Selvaraju
Ramasamy
selvaraju.ramasamy@amec
fw.com
Amec Foster
Wheeler
Construction Manager 012*******
Thiagu
Govinda
Thiagu.Govindasamy@exyt
e.net
Exyte Group
Malaysia
Construction Manager 017*******
JC Tan *****@******.***.** Fujita Malaysia Senior Manager 019******* ACADEMIC EDUCATION
IT Skill
SAFETY TRAINING ATTEND
ENGINEERING CERTIFICATE
REFERRENCES