Post Job Free
Sign in

Architect

Location:
Abu Dhabi, United Arab Emirates
Posted:
September 24, 2020

Contact this candidate

Resume:

*

Reem Awni

Architect

Years of experience

+* Years

Qualifications

Bachelor of Arts and Architecture

University of Amman Al-ahliyyeh

(AAU) –Amman/Jordan (2015)

Nationality

Palestinian

Mobile

+971*********

Certifications

ILTES -Acadimec -Score:6

Fist Aid quilified (ADU-

Certification)

E-mail

****.*****@*****.***

Date of birth

10 May 1992

Language skills

English / Arabic

Website

https://www.linkedin.com/in/reem-

awni/

A professional, creative, and responsible architect with 5 years of experience, I have a methodical customer-focused approach to work and a strong drive to see through due to my engaging with several different projects in both consultancy and construction fields.

Professional history / Selected work samples:

CGCH/ Architect

MAR 2020 / Present

Abu Dhabi /UAE

// THE BRIDGES PHASES 2 / SHAMS ABUDHABI, AECOM, ALDAR. Value: 754 Billion AED.

Project Scope:

The Bridges Project Consists of Six Residential Towers (Phase 1 & 2) Developed by ALDAR Properties and Located in Shams Abu Dhabi, Al Reem Island.

Each Phase Consists of Construction of Three Residential Towers (2 Basement + Ground Floor + 26 Floor + MEP Rooms + Roof)

Each Phase has a Total of 612 Units and The Amenities for Both Phases 1 & 2 Include Outdoor Swimming Pool, Gym, and Park Area Tying Retail to Canal, Playground and Kids Play Area. Responsibility:

− Revise the materials and shop drawings related to the interior design.

− Revise & submit shop drawing and As-built drawings upon consultant supervision.

− Knowledge of the project’s contract documents, detailed drawings and specifications

− Full coordination with sub-contractor and supplier. MEPS Electrical & Mechanical Engineering / Architectural BIM leader JUL 2018 / FEB 2020

Abu Dhabi / UAE

// THE BRIDGES PHASES 1 / SHAMS ABUDHABI, AECOM, ALDAR. The Bridges Project Consists of Six Residential Towers (Phase 1 & 2) Developed by ALDAR Properties and Located in Shams Abu Dhabi, Al Reem Island.

Each Phase Consists of Construction of Three Residential Towers (2 Basement + Ground Floor + 26 Floor + MEP Rooms + Roof)

Each Phase has a Total of 612 Units and The Amenities for Both Phases 1 & 2 Include Outdoor Swimming Pool, Gym, and Park Area Tying Retail to Canal, Playground and Kids Play Area. Reem Awni

2

Responsibility:

− Responsible for the checking of BIM/CAD works done and review it as a shop drawing.

− To understand and implement consultant IFC procedures and advise Engineers/Technicians

− To coordinate with other design disciplines as required on a day-to-day basis or as set out by the project requirements

− Checking the shop drawings to be matched with mechanical, electrical, structural plans of IFC and suppliers’ standard.

− Ensure the contractor/s compliance with the standards and specifications. Arc Tech Consultancy Engineering LLC / Architect

NOV 2016 / JAN 2018

Responsibility: Al Ain/ UAE

− Developing design concepts in consultation with the client and establishing final briefs

− preparation of drawings for construction and submission to local authorities

− Responsible of technical and detailed drawings.

− Preparing detailed working drawings, designs, plans, models, and schemes, often using computer- aided design (CAD) & (3D max) software.

Projects:

// Residential private villa / Matar Khalfan AlNoaimi / UAE.2017/2018 Value: 2.1 Million AED. Area: 625 Square meters

Project scope: The project consists a villa of 7 bedrooms 5 bathrooms 2 majlis/living room, kitchen & pantry. A front yard with 4 parking lots and landscape area around the villa including a 120 square meter swimming pool.

// Mixed-use Building / Khalifa Hamad Al Masnsouri / UAE.2016/2017 Value: 4.7 Million AED. Area: 812 Square meters

Project scope: The project consists 1 basement (Parking), Ground Floor (Shops & markets) + 15 Floors

(Residential/ each floor contains 5 Apartments).

Al Ain Consulting Engineers LLC / Junior Architect JUL 2015 / OCT 2016 Al Ain/ UAE

Responsibility:

− Responsible of architectural conceptual & detailed Design

− Responsible of technical drawings.

− Prepare 2D architectural drawing and 3D visualization according to the client’s request.

− Preparation of drawings for construction and submission to local authorities. Projects:

// Residential private villa / Naser Salim AlDere’e / UAE.2015/2016 Value: 1.7 Million AED. Area: 578 Square meters

Project scope: The project consists a villa of 5 bedrooms 3 bathrooms 2 majlis/living room, kitchen & pantry. A front yard with 2 parking lots and landscape area around the villa.

//Renovation of Bin Ham office / khalid Bin Tahnoun Alshamsi / UAE.2015. Value: 375.000 AED. Area:187.9 Square meters

Project scope: Re-tilling floors and re-new materials, re-designing different workspace layouts (open space), Choosing fixed & mobile furniture according to the client’s requirements. Reem Awni

3

Trainings

// Professor's teaching assistant at AAU (Amman Al ahliyyeh University). Summer semester 2014

Responsibility: Jordan

- Meet with supervisors to discuss students' grades or to complete required grade-related paperwork

- Inform students of the procedures for completing and submitting class work, such as lab reports.

- Assist faculty members or staff with student conferences.

// Undergraduate Architect trainee At LEGEND Consulting Engineers. Summer 2013

Responsibility: Al Ain/UAE

− Preparing technical drawings under supervision.

− Prepare 2D architectural drawing and 3D visualization according to the supervisor’s request.

− Knowledge of drawings for construction and submission to local authorities. Design Tools

− Lumion 3D & Animation Render.

− Sketch Up.

− Autodesk 3D MAX.

− V-RAY.

− Autodesk AutoCAD.

− Autodesk Revit Architecture.

− Adobe Photoshop Cs6.



Contact this candidate