Post Job Free
Sign in

Surveyor Project

Location:
Al Dafna, Qatar
Salary:
8000+house alouncce
Posted:
September 23, 2020

Contact this candidate

Resume:

GSM: 009**-********

E-mail: *****************@*****.***

ABBUL KHAIR KHAN

CAREER OBJECTIVE

Seeking opportunity with a high growth-oriented organization. To put in the best endeavor to translate innovative ideas into feasible projects by implementation of my technical skills, which helps improving the existing scenario.

PERSONAL INFORMATION

Birth date: 10th jun, 1978

Religion: Islam

Marital status: Married

Passport no: K8764921

EDUCATIONAL QUALIFICATION

Technical: National Institute of engineering & Technology Laxmangarh sikar

Universityc:BSC Mathematics-Deen Dayal Upadhaya Gorakhpur Up India

COMPUTER SKILLS

Computer Skills: AutoCAD+civil3d

PROFESSIONAL EXPERIENCE

Organization: JH Constration state of Qatar (Dec2018-till date)

Designation: surveyor

Project: C-646 Road Improvement in Al Furousiya Street

Organization: Al Jabar and Makhlauf state of Qatar (jun2018-Dec2018)

Designation: surveyor

Project: New Orbital Highway and Truck Route Mesaieed to Salwa Road

Organization: Al Jaber and Makhlauf state of Qatar (2016-2018)

Designation: surveyor

Project: C-471 ISF Camp

Organization:Al Jaber and Makhlauf State of Qatar (2014-2016)

Designation: surveyor

Project :. Areas of Greter Doha C-454

Organization:Binladin Contracting Dubai (2012-2013)

Designation: Surveyor

Project: liwan Sewerage Network

Organization: Binladin Contrating Dubai (2012-2011)

Designation: Surveyor

Projects:. Al Qudhara Oasiss Sewerage Network

Organization: Binladin Contrating Dubai (

Organization: Binladin Contrating Dubai (2011-2009)

Designation: Surveyor

Projects: Ummul Quiwan Marina Development phase-1

Organization: Binladin Contrating Dubai (2009-2007)

Designation: Surveyor

Projects: Paving Various parking in Dubai.

SKILLS:

Road Works: Such as Traverse for Horizontal & Vertical Control, Setting out of Roads Centre Line, taking natural Ground Levels, formation of embankment and cutting preparation of sub-grade, sub-base, Future Ducts, Krebs lines in straight & Curves, Traffic Sign board and Road Marking. Joint checking of all these activities with consultant surveyor. Layout of bridges, box culverts, pipe culverts marking the blinding levels, invert levels, top levels, column footing, cross head bearing pads launching of grader and deck slabs.

Sewerage: setting out of centerline for sewerage line taking natural ground levels looking after the bed levels checking the pipe level according to design and drawing taking approval from consultant surveyor

Water pipeline: Setting out the route of pipeline, N.S.L mentain the bed levels, marking and layout of all attributes such as tees, bends butterfly, air valve, washout chambers. Taking joint as-built survey with client surveyor and own for final approval.

Building works, Such as setting out & checking of building line, Formwork, Plumb of Footing, Ground beams, Columns, Roof beams, Roof Levels, Staircase and Ramp,

Shop Drawing Preparation and checking, As-built preparation and checking, Topographical survey for new projects Design etc.

GENERIC RESPONSIBILITY

To do reconnaissance, to locate suitable positions for traverse stations alongside the corridor selected for proposed road alignment.

To connect these traverse stations by a traverse line to provide the horizontal control for the proposed road by observing angels and distance between the leg of traverse.

Computation of traverse stations coordinates from observed angels and distance between the legs of traverse.

Computation of bearing and distance from horizontal control stations coordinates of central line of proposed road.

Setting out of roads Centerline to record Original Ground levels..

To operate GPS for initial base line & topographical survey.

To do triangulation.

As-built Drawings preparation and checking.

Building Line Setting out and checking as per design drawing.

Formwork, plumb checking of footing, ground beams, columns, Elevator shaft, Roof beams, Roof slab, Staircase and Ramp.

INSTRUMENT USED:

GPS Trimble R8GNSS/R6/5800, GPS Leica R1200, Total station Leica TC 1203 R

TC1500L, Topcon GTS710, Total station leica TC 1101M plus .Nikon DTM 352

All kinds of level instruments.

LANGUAGEPROFICIENCY

Can speak fluently & Arabic, English & Urdu



Contact this candidate