AURELIO FAVELA JR.
**** ***** **, *****, ** ***11
Ph: 979-***-**** *********@*****.***
Professional Summary
I have been working in the field of chemical, refinery and new construction since 2004. I have worked my way up from a pipefitter helper to a pipefitter foreman with various companies. I have knowledge in HDPE installation and various metals.
Work History
Pipefitter Foreman. Jan 2020-July 2020
S&B ENGINEERS & CONSTRUCTORS
Sweeny, TX
Phillip 66
● I directed a 10 man crew in the fabrication and installation of pipe spools and supports.
● Planned pipe system layout, installation or repair, according to specifications.
● Inspect, examine, or test installed systems using pressure gauges and hydrostatic and pneumatic testing, observation or other methods.
● Keep up with daily progress and daily time sheets.
Pipefitter Foreman Jan 2016 - Aug 2019
ZACHRY INDUSTRIAL INC - Freeport, TX
Freeport LNG
I directed a 12 man crew in the fabrication and installation of pipe spools and supports.
Plan pipe system layout, installation, or repair, according to specifications.
Inspect, examine, or test installed systems or pipe lines, using pressure gauge, hydrostatic testing, observation, or other methods.
Keep up with a daily progress for numerous systems.
Pipefitter Aug 2012 - Jan 2016
HTC Industrial - San Angelo
HTC INdustrial
Check slopes for conformance to requirements, using levels or lasers.
Connect pipe pieces and seal joints, using welding equipment, cement, or glue.
Cut pipes to required lengths.
Lay out pipe routes, following written instructions or blueprints and coordinating layouts with supervisors.
Measure, cut, thread and assemble new pipe, placing the assembled pipe in hangers or other supports.
Pipefitter Mar 2008 - Aug 2012
Zachry Industrial - Freeport
Dow Chemicals
Cover pipes with earth or other materials.
Connect pipe pieces and seal joints, using welding equipment, cement, or glue.
Cut pipes to required lengths.
Align and position pipes to prepare them for welding or sealing.
Measure, cut, thread and assemble new pipe, placing the assembled pipe in hangers or other supports.
Layout, assembly, and installation of piping for air, ammonia, gas, and water systems.
Measure and sketch new and existing lines.
Fit or assist in fitting valves, couplings, or assemblies to tanks, pumps, or systems, using hand tools.
Pipefitter May 2004 - Mar 2008
Ifinity Group - Freeport, Tx
Dow Chemical
Check slopes for conformance to requirements, using levels or lasers.
Cover pipes with earth or other materials.
Connect pipe pieces and seal joints, using welding equipment, cement, or glue.
Cut pipes to required lengths.
Lay out pipe routes, following written instructions or blueprints and coordinating layouts with supervisors.
Measure, cut, thread and assemble new pipe, placing the assembled pipe in hangers or other supports.
Layout, assembly, and installation of piping for air, ammonia, gas, and water systems.
Fit or assist in fitting valves, couplings, or assemblies to tanks, pumps, or systems, using hand tools.
Education
High School Diploma Jun 1997
Wharton High School - Wharton, TX References
Jose Rodriguez
General Foreman
Zachry Industrial
Co-Worker
Scott Wilkerson
Foreman
Zachry Industrial
Co-Worker
James Clark
Superintendent
McDermott
Co-Worker