CURRICULUM VITAE
GODWIN POMADEY
Mechanical Technician / Engineering
P.O.BOX 213 SEKONDI PRISONS
Passport number: G1584147
Email: adg9e4@r.postjobfree.com
PROFILE
Skilled In Maintaining And Developing Professional Relations With Clients.
Good Planning And Organizing Skills
God Fearing And Smart Working Guy
Good Team Player And Ability To Handle Multiple Tasks
PERSONAL INFORMATION
Date of Birth : 8th March 1985
Nationality : Ghanaian
City : Sekondi / Takoradi
Sex : Male
Marital Status : Married
Religion : Christian
PERSONAL ATTRIBUTE
A highly experienced Mechanical Technician, with a track record of successfully using to repair & maintain machinery and mechanical equipment. Overall I have worked in this field for more than 19years, and comfortable working in a highly critical, fast paced environment which has shifting priorities.as a true all-rounder, I have experience of pipe fitting, centrifugal pipe repair, industrial hydraulic power system, bearings and industrial lubrication. I have worked on dispensing equipment, enthusiasm and energy needed to ensure that machine continue to run smoothly, and operate efficiently. At this precise moment in time I would like to join a company that has a work environment which foster contribution by all employees.
EDUCATION BACKGROUND
YEAR INSTITUTION
2013 G.P.H.A Training Services As Fire Fighting Safety
2011 Lloyds British Training Services As Rigger
2010 Nautical College (Bold Certificate)
2009 Lloyds British Training Services Oil And Gas
2006 N.V.T.I Mechanical Filter
2002 Kumasi Technical Institute
1999 Ketan Anglican J.H.S
WORKING EXPERIENCE
COMPANY Anglo Gold Ashanti / Jodi Construction
YEAR 2019 Up To Date
POSITION Mechanical Technician
DUTIES Maintenance in Gold Plants, Which Involves;
Booster Pump Removal, Old Gland Packing And Replacing With New, Wall Man Pumps, Milams Adjacent Pumps, Diaphragm Pumps, Slurry Pump, Valves, Ball Butterfly, Knife, Gates, Changing Of Pluck Valve New Floatation Plant And Crusher.
Maintenance Of Thickener Tanks: Removing The Old Gear Box And Replacing With New Gear Box,, Replacement Of New Crushers, Servicing Of New Gear Box In Bios Plants, utilize power and hand tools as needed while maintaining safety standards, Grid mesh and existing structural and install new vibrating feeder, vibrating feed bin, reinstall CV2 head chute, Reinstall new structural steel work, vibrating discharge chute at the sulphide plante circuit at obuasi-Ghana.
COMPANY Wise Design Africa/ Africa Power Solution (Rutile Mining, Sierra Leone)
YEAR 2018
POSITION Mechanical Fitter Supervisor
COMPANY Nangou Iron Mines- Burkina Faso (
YEAR January, 2015-June,2015
POSITION Mechanical Fitter Supervisor
DUTIES safely operated equipment and tools to complete projects,
Removed and repaired various equipment and components,
performed
Removed and repaired various equipment and components
Conducted diagnostic test on all milling equipment as well
Pipe Fabricator
DUTIES Maintenance In Dredge Plants, Which Involves The Following;
Booster Pump Removal, Old Gland Packing And Replace With New. War man pump, Milam’s Adjacent pumps,Diaphragm pumps, Slurry pump. Valves, Ball Butterfly, Knife, Gates. Crusher, Gyroratory-Mp1000,Pebble(Cone) Mp800, 500 Jaw Crusher, MMD Seizer for Oxide C.I.L; Carbon Advance pumps, Inter Tank Screens, agitators, Elution,Heather,Boilers Gas Regeneration Kiln Falcos, Gravity, Knelson Concentration Intensive cyanidation reactor General Pipe works.
Retightening Loose Scrubber Underflow Pump Gland Seal With Packing Bolt.
Removing Damaged Spider Coupling And Replacing With New Spider. Realignment Gear Box With Motor.
Cover Up Leakages On Short Spool Scrubber Underflow Pump.
Hydraulic Lube Pack Removal, Clogged Filter Clean And Fixed.
Maintenance In Centrifugal Pump Which Also Includes
Parts Assembly Inside The Stuffing Box Pump Discharge, Stuffing Box, Shatt Gland Flungen Or End Flange, Drive Shaft And Coupling Bearing Housing.
COMPANY Wise Design/ Africa Minerals, Sierra Leone
POSITION Mechanical Fitter Supervisor, Rigger
YEAR 2014 (Three Month (3) Project Tonkolili Sierra Leone)
DUTIES Installation Of Mechanical Equipment.
Such As Pumps Conveyors, Pipe Rack, CIL Tanks Thickness Rustler And Tunnel
Greasing Of Mechanical Equipment, Alignment Of Conveyors, Working On Crusher Changing Of Scrippers Sand Changing Of Shoot
COMPANY African Minerals Limited Sierra Leone
POSITION Rigger and Mechanical fitter Supervisor
YEAR 2014 (Seven Month (7) Maintenance Project)
DUTIES Expatriates at Pepel site which includes rail,
Port And Marine, Execution Of Shutdowns On Shipping Loading I E.
Dismantling Of Epicycle Bull Gears Box And Installing Of New Ones.
Replacing Of New Conveyor Belts Using A Tag Or Batch Crane
Dismantling And Installations Of Chutes On Various Transfer Towers,
General Lifting On Traction Workshop Ie Lifting And Shifting Of Wagons.
General Lifting And Maintenance On Reclaimer Ie Stackers’ Reclaimer And Butterflies Reclaimer.
Stripping And Installation Of Gearbox, Bull Gears.
Lifting And Shifting Of 25 Ton Hopper Reclaimer.
COMPANY London Mining
YEAR 2013 Forge Group OF Africa (Project Sierra Leone)
DUTIES Rigger/ Mechanical Fitter
Fixing Of High Processing Grind Rolls, Conveyors And Crusher At South Crusher Project.
Lifting And Assembling Of Structure And Mechanical Material.
Maintenances Of Crusher And Scrubber Changing Of Rollers, Replacement Of Liners, Fixing Of Scrapper In The Scrubber, Rigging Process.
COMPANY Seaweld
YEAR 2013 Seaweld Engineering offshore
DUTIES Mechanical Fitter
Perform All Paper Work Before And After Operation According To Company Policy.
Operate All Plant Equipment Take Reading From Charts, Meters And Gauges.
Participate In The Repair And Maintenance On All LMP Pumps, Brine Filters, Compressors And Replacement Of Faulty Valves.
Participate In Mud And Mixing
Circulation Of Mud And Transfer To Storage Tank.
Check Mud Weight After Mixing Using Offite Scale.
Pump Mud, Brine And Base Oil To Supply Boat Going To The Rig Site
Receive Backload From Boat And Store In Silos/Tanks
Filtration Of Brine When Contaminated.
Centrifuge Of Mud.
COMPANY Africa Minerals Tonkolili iron project
YEAR 2013
DUTIES Belt Splicering
Aliment Of Belt
Belt Skills In All Aspects Of Steel Structure. Changing Of Belt At CV03
Maintenance Of Rubber Lining And Scrubber.
YEAR 2012- Hess project in Ghana
COMPANY Hess
DUTIES Rigger on Board
Pipe Yield Arranging Pipes, Containers, Chemicals, Key Side
Arranging Pipes On Board
Offload Contains On Board
YEAR 2012
COMPANY Fuel Trade Limited
DUTIES Perform all paper work before and after operation according to company Policy.
Control Plant Equipment; Take Readings From Charts, Meters And Gauges.
Receive Backload From Supply Boat And Store In Silos /Tanks
Dispatch LPG Truck From Car Park To Loading Terminal
Adhere To All Safety Rules And Regulation For LPG Loading From Tanker Ship In A Safer Manner.
Monitor The Flow Of LPG Gauge
And Record The Amount Of LPG Discharged.
Participate In Housekeeping Activities After LPG Discharge.
YEAR 2009 (Project)
COMPANY Group five (5)
DUTIES Mechanical Fitter
Installation Of Mechanical Equipment Such As Pumps Filters, Pipe Rack, CIL Tanks, Thickness, Rustler And Tunnel
Greasing Of Mechanical Equipment, Alignment Of Conveyors, Working On Crusher Changing Of Scrappers And Changing Of Scrappers And Changing Of Shoot.
REFERENCES
Head Office Johannesburg
Unit B. stroneridge office park
8 Greenstone Place, Greenstone
Johnannesburg
Email. adg9e4@r.postjobfree.com
African Minerals Project Tonkolili Sierra Leone)
Bara Cisse
Site Manger
Cisalbar @yahoo.com
Tel: +221*********
Forge Group OF Africa (Project Sierra Leone)
Francis Agbeko Seaneful
Tel: 024*******
African Power Soluion(Sierra Leone)
Head Office Johannesburg
adg9e4@r.postjobfree.com