CURRICULAM VITAE
J.SURESHKUMAR
SINDHULAKSHMI HOMES,
MUTHU VELAR STREET,
New Perugalathur
Chennai
Tamil Nadu
PH: +91 – 995-***-****
E. mail: *****************@*****.***
OBJECTIVES
Main objectives is to be an ideal employee placed in any post and also to be an ideal/jovial human & make help others too and to be the same. But firstly, procure a job that helps an individual to build up a good for carrier. My resumes defines my skills in Engineer with unique guidelines & regulations both aspects of my experience which can definitely benefit your company. Qualities that may not be readily apparent from my resumes include me being a person who embraces the background & abilities.
STRENGHT
A Positive attitude & total belief in my capabilities
Result Oriented
Capabilities to work in team & individually & casually adaptable. WORK EXPERIENCE
Working as a Project Engineer in TRIGGO TECH ENGINEERING from the Month of May 2016 to Still
Working as a Project Engineer in QBG contracting from the Month of March 2015 to Feb 2016
Working as a Sr. Engineer in TVS & SONS LTD (Infrastructure Planning and Management) From the Month of 01th July 2011 to March 2015
Worked as a Project Engineer in ETA ENGINEERING PVT LTD, CHENNAI from the month of APRIL 2006 to 30th JUNE 2011.
Worked as Site Engineer & Maintenance Supervisor in SP APPARELLS,COIMBATORE from the month of AUGUST 2004 to MARCH 2006 Job Profile:
TRIGGO TECH ENGINEERING – 20 May 2016 TO TILL DATE
I was worked as a project engineer for the AISON -TADA,YAMAHA- SRIPERUMPUDUR,SIGMA FORGING-SRIPERUMPUDUR,HIROTEC- COIMBATORE COSMA International, Unipress india, Diamler Heavy vehicles India, Indospace projects- Oragadam, Asahi glass India,Eta Techno park-Navalur –Chennai responsible for the project site activities, Material procurement, system installation commissioning, testing, training, certifications and handovering QBG Contracting – 20 March 2015 to 25 Feb to 2016
Select material and standards procedure for commissioning of electrical equipment and coordinate approvals of drawing from consultant.
Prepare electrical procedures for installation, testing and commissioning.
Negotiate on the techno-commercial aspects with customer, consultant, vendors and sub-contractor
Maintain a keen focus on the project, site requirement; track and monitor changes in work schedule;
Perform verification of compliance and ensure basic safety norms are followed.
Studying the detail electrical specification and relevant portion of each project.
Prepare the scope, objective, and budgets for the project apart from downloading the product to all concerned through documentation and presentations.
Handle the task providing assistance to the senior engineer in quality control to ensure contract compliance
Obtain safety for the electrical installations, while that electrical installation practices are followed in erection of electrical equipment.
Responsible for handling bills and invoices of the sub-contractors, auditing them for correctness and expediting timely payments.
TVS & SONS LTD (Infrastructure Planning and Management) - 01th July 2011 to March 2015
Preparing Project Initiation document.
Studying the Tender drawing preparing the bill of quantities and estimation of electrical projects.
Go through the civil drawing, entire electrical designing (lighting, Air condition, Airline, fire extinguisher DG, Load calculation for getting Permanent power/Additional power)
Identifying, costing and processing any contract variations, tracking activities against the detailed project plans.
Monitoring actual expenditure figures against project budgets.
Ensuring Projects and Vendors are executed using agreed standards & processes.
Co- ordination of activities and works related to the Project and project team and vendors.
Preparation of weekly and monthly report highlighting key mile stones involved in projects and the preference sequence.
Co- ordination of vendors and sub-contractors, certification of vendors and sub- contractor bills.
Co- ordination of Internal finance account team for the proper payment of certified bills.
ETA ENGINEERING PRIVATE LIMITED – APRIL 2006 to JUNE 2011
Erection of Transformers,Power panels
Erection of HT,LT Circuit Breakers
Erection of Bus duct and rising main systems
Erection of DG and Bus duct and simony
Liaising with Project Manager on matters related to project quality error prevention.
Equipment installation is in accordance with approved drawings.
Follow all other details necessary to identify the performance of the installed Electrical Power equipment.
Execution of all required inspections and recording the results of inspections.
Check all Electrical items are in accordance with the approved design drawings specification where upper cable the manufacturers instruction
Ensure correct installation procedures are being followed
Investigate and prepare customer complaint report and satisfactions.
Testing of Transformers, Switch Gears, LT boards, UPS, Battery charger and Relays.
Installation of Transformer in 1000, 1250 & 1600 KVA,2500KVA
Installations of switchgears in 400/630A to 4000A ACBs.
Installations of equipment’s such as Current Transformers, Battery Charger and LT Boards.
Testing and commissioning of High Voltage equipment’s (Meger test, insulation resistance test, ratio test etc.)
Maintaining all safety procedures and norms efficiently, Implementing safety measures & effective strategies to reduce risks and thereby ensuring safety of all persons during work.
Maintain Test and calibration records.
Conceptualize project control schedule after through discussion with clients and establish time span of project execution as per client specifications.
Monitor the project status during the course of periodic project review meetings.
Coordinate with the client and project manager for changes in same.
Obtain safety certificate from CEIG and CEA for the electrical installations, while that electrical installation practices are followed in erection of electrical equipment.
I was worked as a project engineer for the Jabil circuits, Nokia PhaseII Nokia Logistics, Laird India limited in Sriperumbudur Nokia Campus, Ford India limited for Industrial Factory in Chennai and High rise building of RK investment in Chennai,Hotel DODLA in Trivandrum, SUN Network Ltd Chennai and Tidal park Coimbatore, responsible for the project site activities, system installation commissioning, testing, training, certifications and handovering.
SP APPARELS - MAY 2004 to APRIL 2006
Erection of Transformers
Erection of Circuit Breakers
Liaising with Project Manager on matters related to project quality error prevention.
Equipment installation is in accordance with approved drawings.
Follow all other details necessary to identify the performance of the installed Electrical Power equipment.
Execution of all required inspections and recording the results of inspections.
Check all Electrical items are in accordance with the approved design drawings specification where upper cable the manufacturers instruction
Ensure correct installation procedures are being followings
HT, LT panel wiring and installation.
HT, LT cable laying works.
Estimation of new installations.
LDB, MCB, ELCB installations.
LT motor and Starters maintenance (DOL and Star/Delta Starter).
Transformer maintenance up to 800 KVA
Assign tasks to site workers / technicians.
Prepare and submit quality and safety statistics to the management.
Maintain Test and calibration records.
Summary:
I have worked closely with Estimation of Electrical Installations for High-rise buildings, Commercial complexes, Star category hotels, Substations, Factories, Switch Yard, etc. Analyzing designs, carrying out value engineering and purchase of various equipment’s are some of the skills that I have acquired during my tenure. Apart from this, I do have experience in contracts and execution of electrical installations. EDUCATIONAL QUALIFICATION
Completed Diploma of Engineering in Electrical & Electronics from Alagappa polytechnic College
SKILLS
Operating systems: windows 98, windows XP,2000,vista and Windows 07
Working knowledge of Ms. Office
Practical Knowledge of Internet & E-mail
Good communication skills
PERSONAL PROFILE
NAME : J.SURESHKUMAR
FATHER NAME : JEYARAMAN.P
DATE OF BIRTH : 07TH APR 1986
NATIONALITY : INDIAN
RELIGION : HINDU
LANGUAGES KNOWN : ENGLISH, TAMIL
PASSPORT NUMBER : N7081964
MARITAL STATUS : MARRIED
SEX : MALE
The above said Bio data furnished to you is true to the best of my ability & Knowledge. Thanking you for taking time in the midst of your demanding Schedule to review my resume.
Thanking you
Date: yours faithfully
(J.SURESHKUMAR)