Jerry K Hunt
Borger, TX – C 806-***-**** – adg5li@r.postjobfree.com
Summary
A Design Draftsman with a broad range of experience in mechanical design, including 2D/3D modeling, AutoCAD, SolidWorks, Weldments, Sheetmetal and Assemblies.
Quality focused Documentation control facilitator who is thorough and efficient, takes initiative, prioritizes, multiple tasks and manages workload to meet deadlines.
Communicates effectively with people of all levels and backgrounds
Team player with a positive attitude
Education
Diploma - Borger High School, Borger, TX
Diploma - Certification in Drafting and Design, Elkins Institute Dallas, Texas - June 1995
Pipeline Safety Update Seminars, DOT
Software
SolidWorks
AutoCAD 13 /14
CADWORX
E CAD
Microsoft Office Suit
ASC Contract for XCEL Energy
July 2019 to July 2020 Project Coordinator Capital Projects Substations
Basin Design Midland TX
Aug 2018 to July 2019 Mechanical Designer
Field Verification and As-Builts
Pipe and Civil Design (3D and 2D AUTOCAD W/BDM)
P66 Refinery - Air Swift Houston, TX
Jan 2013 to Aug 2018 Pipe Designer/Safety
3D Modeling and detailing of manufacturing equipment using SolidWorks and AutoCAD
Update existing details in AutoCAD to meet present specifications
Project piping design and related concerns in the petroleum refining, chemical and machinery
My primary duties consisted of assisting the Engineers/Designers in the drafting and editing of Process & Instrumentation Diagrams and Electrical Control Schematics, Isometrics, Single Line Diagrams, Interconnections
Project at the Phillip’s refinery and NGL center.
Laid these pipelines simultaneously at a combined cost of 5MM dollars.
Responsible for the construction of these pipelines.
Duties were electronically update all discipline engineering packages to an “as built” condition, reverse engineering, hands-on field design/problem.
Conner Industries Borger, TX
Nov 2007 to Nov 2011 Draftsman, Safety Supervisor, Estimator
I did the design and drafting for projects fabrication both shop and field
I developed the safety program, and I helped with estimating and purchasing.
Track Masters Mansfield, TX
Mar 2003 to Nov 2007 Construction Superintendent
Responsible for the crews, equipment, supplies, contractors, and total construction site, to complete the job.
I did cost estimates and cost control on the projects.
We worked on sports fields and running tracks.
Diamond Shamrock Sunray, TX
Jul 2001 to Jul 2002 Mechanical Designer
Design piping and structural for projects in refinery and R&D for asphalt plant.
BECHTEL CO. Borger, TX
Jan 1999 to Aug 2000 Phillips Alliance
Responsible for coordination of numerous projects running simultaneously.
Y1-Y2 separation project; an 8.5MM dollar project to reconfigure existing process equipment.
Responsible for the design at an office site contract engineering firm, cost scheduling and the construction of the project.
Lead in a constructability plan that did document cost savings of $750,000 to this project.
38-Column restart project; a 3.35MM dollar project to reconfigure existing process equipment that had been out of service for 5-6 years.
Responsible for the design at an offsite contract engineering firm, cost, schedule and construction of the project.
Lead in a constructability plan that did document cost savings of $735,000 to this project.
Ten inches and 24-inch pipelines to feed the Cogen.
Pantex debottleneck project; 3.1MM dollar project to upgrade 1920’s technology to 1999 technology and upgrade the piping to accommodate the process conditions.
Responsible for the coordination of engineering, cost, schedule, coordination of the vendor doing the compressor upgrades to the compressors and construction of the project.
Safety representative for Bechtel at the Borger refinery and NGL Center.
Wrote safety manuals for the Borger site for Bechtel.
Phillips Petroleum Company Borger, TX
Dec 1989 to Jan 1999 Mechanical Designer/I&E Designer
Piping and mechanical design
Responsible for piping and mechanical design in the Borger Texas
Responsible for Instrument and Electrical design in the Borger Texas
Piping and mechanical design
Responsible for coordination of numerous projects running simultaneously.
Electric City Project - a 25MM dollar project to purchase land and houses on Phillips pipeline right of way and close to operating units.
Responsible for the AFE to be written and to give presentations to the Phillips refinery and NGL center plant manager and staff to obtain approval later to the CEO of Phillips and his staff.
Helped the Phillips land attorney to negotiate with the landowners for the property, negotiate the sale of the dwellings to be moved.
JTF pipeline project; a 4.1MM dollar project to lay three pipelines from the refinery NGL center to Johnson tank farm.
Other Experience
Rural Metro Ambulance Service
Aug 1995 to Jun 2004 Borger Ambulance Service
As a Paramedic on a 911 service part time but with 40 to 60 per week.
Worked nights and weekends.
The ambulance service changed owners and I stayed with them under the same Supervisors
Total Valve Systems, Inc. Borger, TX
Jul 2002 to Mar 2003 General Manager
Responsible for the operations of the day to day operations of the Valve
Shop including, cost estimates, quality control, scheduling of field crews and in shop work.
Responsible for sales and customer relations.