Post Job Free
Sign in

Project Design

Location:
Abu Dhabi, United Arab Emirates
Posted:
October 20, 2020

Contact this candidate

Resume:

Arch. MARIO G. ABRIS u.a.p CV Page *

MARIO G. ABRIS ᅵ ARCHITECT

Mobile: +971*********

Email: ***********@*****.***

Address: Abu Dhabi, UAE

CERTIFIED PROFESSIONAL ARCHITECT

Dynamic result oriented, qualified Professional Architect with 17 years of progressive experience in the field of Design, Technical Coordination, detailing and immensely exposed to Construction Industry. Strongly motivated who possess strong commitment and capacity to drive efficiency and mentorship on leadership together with the professional skill such as analytical, problem solving, coordination, management, organizational and communication skills. CORE SKILLS:

● AutoCAD 2018 ● Adobe Photoshop ● MS project and MS office

● 3D modeling ● Revit Architecture 2018 ● Navisworks

● Sketch-up ● Primavera 3&6

EDUCATION

Certified Professional Architect 2006 June

PRC License no: 0021047

Philippines Regulation Commission

United Architect of the Philippines 2006 June – 2022 May Member

Bachelor of Science in Architecture 2003 March

Eastern Visayas State University - Graduated

CAREER PROGRESSION

Senior CAD/Revit Technician (Architectural & Interior) 2013 Sept. – 2020 June AECOM MIDDLE EAST LIMITED ABU DHABI – International Tower, Abu Dhabi, UAE BIM Modeler (Architectural & Interior) 2011 Sept. – 2013 July iTECH HOLDING COMPANY - Al Mafraq Hospital, Abu Dhabi, UAE Senior Technical Coordinator (Architectural) 2007 May - 2010 Oct. IJM-SUNWAY-ZELAN-LFE CONSORTIUM - Al Reem Island, Abu Dhabi, UAE

(Project Information)

Al Reem Island - Plot 1, Zone C + E1

Tamouh Investments LLC awarded this contract to the IJM, Sunway, Zelan, LFE Consortium - for Al Reem Island Development Phase 1, Plot 1, Zone C in Abu Dhabi. This includes the design, execution, and completion of five towers CT1,CT2,CT3,CT4 and CT5 together with an associated podium and seven villas with a total Gross Floor Area of 292,937 square meters. Also included are 107,174 square meters of car park and built up areas including open deck, terraces, open grand staircases, ramps, pedestrian mall and roof. Design/CAD Draftsman 2006 Aug. – 2007 April

ROMAGO INCORPORATED – Metro Manila, Philippines

Project Architect 2005 Nov. – 2006 May

PRIVATE PRACTICE – Guiuan E. Samar, Philippines

Project In charge 2005 Feb. – 2005 Oct.

ARCH. BART B. VISTA – PRIVATE PRACTICE - Metro Manila, Philippines Design/CAD Draftsman 2004 July – 2005 Jan.

ARCH. BART B. VISTA – PRIVATE PRACTICE – MM, Philippines & KL, Malaysia Design/CAD Draftsman 2004 Mar. – 2004 June

GOTHICMATIC SDN BHD – Kuala Lumpur, Malaysia

Arch. MARIO G. ABRIS u.a.p CV Page 2

Project In charge 2003 April – 2003 June

AR ADLAWAN & ASSOCIATE – Tacloban City, Leyte, Philippines Design/CAD Draftsman 2002 April – 2003 April

AR ADLAWAN & ASSOCIATE – Tacloban City, Leyte, Philippines CAREER PROGRESSION

Senior CAD/Revit Technician (Architectural & Interior) PROJECTS: Sea World Abu Dhabi – Abu Dhabi, UAE

MOTC Bus Infrastructure – Package 3 – State of Qatar Ahlia University Bahrain – Bahrain

Masdar Central Park – Masdar, Abu Dhabi, UAE

Jumeirah Central Project – Dubai, UAE

Ferrari World Abu Dhabi Phase 4 – Abu Dhabi, UAE

ASAAS – NDLT Water Park – State of Oman

ASAAS – NDLT Theme Park – State of Oman

Mall of Oman F&B Package – State of Oman

MOTC Bus Infrastructure – State of Qatar

Other Public – ASAAS – State of Oman

Mall of Oman Hotel – State of Oman

King Hussein Medical City – Aman, Jordan

Reem Central Park – Public Amenities – Reem Island, Abu Dhabi, UAE Al Noor Hospital – Abu Dhabi, UAE

Project Aqua – Corniche Beach Revitalization – Abu Dhabi, UAE City Centre Al Jazira Mall – Abu Dhabi, UAE

Al Mariah Central – Abu Dhabi, UAE

Masdar Institute Neighborhood Housing Development /Corporate Housing Development – Abu Dhabi, UAE Al Mariah Central – Abu Dhabi, UAE

Chairman’s Beach House and Villas – Fujairah, UAE

Clemenceau Medical Centre - Dubai, UAE

Mall of Oman – State of Oman

Al Mariah Central – Abu Dhabi, UAE

Warner Bros – Project – Yas Island, Abu Dhabi, UAE Riyad Metro Dept. – Project – Riyad, Saudi Arabia

ADNEC – Project 19 – Redevelopment and Refer Vestment – ADNEC, Abu Dhabi, UAE The District Retail Project – Sadiyat Island, Abu Dhabi, UAE Crescent Baku Hotel – City Place Park - Baku, Azerbaijan Bawabat Al Sharq - Banyas, Abu Dhabi, UAE

The Avenue Phase 02 - Dubai, UAE

Crescent Hotel – Mixed used Hotel & Residential Project - Baku, Azerbaijan Capital House – Adnec Area, Abu Dhabi, UAE

The Avenue Phase 02 - Dubai, UAE

Crescent Hotel – Mixed -Used Hotel & Residential Project - Baku, Azerbaijan

● Responsible in Modeling and production of working drawings such as Floor Plans, Elevations, Sections and Details.

● Ensure compliance of AECOM Standard and BIM Execution Plan.

● Redesign and remodeling drawings according to markups.

● Review Drawings produce by consultants prior to produce Building Model.

● Produce/Modified Standard Family i.e., Doors, Windows & other Type/Shared Parameter used in project.

● Review and coordinate with other discipline prior to produce model and highlight clashes (Navisworks Review).

● Assigned to Extract Schedule, NWC, IFC and upload to BIM 360.

● Assigned to monitor and review works of two CAD/Revit Technician.

● Given an additional task to be BIM Lead in our team and coordinator.

● Assigned to Model all the Façade and details in one project.

● Being involve in rush project, to proposed sketches to address the required parking and desired number of units.

● Assigned to produce FAÇADE Revit model of complex shape to prior to produce Elevations.

● Assigned to modified Building Elevations and Sections.

● Assigned to implement schematic design, Site plan layout and calculation required for bus parking.

● Assigned to New project Revit Set-up to prepare prior to start Schematic Design for GDC team.

● Assigned to implement comments and resubmit for IFC and ADM.

● Assigned to Produce Toilet Plan Layout and Detail for Issued for Tender.

● Assigned to Apartment Area Calculations (As-built). Arch. MARIO G. ABRIS u.a.p CV Page 3

BIM Modeler (Architectural & Interior)

PROJECT: Al Mafraq Hospital, Abu Dhabi, UAE

● Responsible in Modeling and production of working drawings such as Floor Plans, Elevations, Sections and Architectural Details.

● Ensure compliance of BIM Execution Plan.

● Redesign and remodeling drawings according to markups.

● Review Drawings produce by consultants prior to produce Building Model.

● Assist in production of Family i.e., Doors, Windows & other Shared Parameter used in project.

● Modeling Architecture, Interior, Landscape, Medical Equipment and others that are needed to complete the project.

● Assist for producing RFI’s, Sheet production, Clash detection ‘Navisworks’ & annotation for Contractor Shop Drawings. Senior Technical Coordinator (Architectural)

PROJECT: Marina Square and Paragon Mall – Al Reem Island, Plot 1, Zone C+E1 Project

● Review Drawings produce by consultants prior to issuance to Contracts, Procurement and Operations Department.

● Review & Studies the detailed design brief, drawings, specifications and scope of work for the project.

● Review & secures approval of detailed shop drawings produce by sub-contractors for approval by the Consultant.

● Produces detailed and coordinated shop drawings for approval by consultants prior to implementation at the site.

● Produces as-built drawing and reviews manual submitted by sub-contractors which form part of handover documents to clients.

● Prepare detailed Method Statements for Main Contractor’s Works for approval by Consultant and endorsement by the Client Representative.

● Prepares RFI and follow-up Outstanding Sub-contractor Shop Drawing, Material Samples and other documents to be approve by Consultant and Client Representative.

● Liaises with the Contracts and Procurement Department in preparing the detailed design, scope of work and specification for all subcontract and specialty contract package.

● Liaises with the Procurement Department in coordinating with suppliers and preparing material samples for approval by Consultant and Client Representative.

● Coordinate with specialty fabricators in producing full size mock-ups for approval by Consultant and Client Representative.

● Coordinate with Contracts Department on instruction issued by the Client Representative that will require a variation to the main contract in terms of time and cost.

● Coordinate and Takes the lead in resolving technical issues arising from design, actual site condition and Client requirements.

● Coordinate and Support the operation group in settling technical issues at an early stage to ensure smooth implementation and to avoid rework.

Design/CAD Draftsman – ROMAGO INCORPORATED

PROJECT: 45 STOREY - LANCASTER SUITES TOWER-1 – (Hotel & Residential Apartment) Metro Manila, Philippines

● In Charge for the production of Detailed shop drawings for submission & approval.

● Prepare sectional details and conduct verification thru actual measurement at job site.

● Prepare an as-built drawings for Electrical, Mechanical and Fire protection Layout.

● Assist and Discuss with Site Engineer’s regarding the Details and Layout.

● Suggest and Coordinate with Project Engineer’s for good and presentable Layout. Project Architect – PRIVATE PRACTICE

PROJET: 3-COMMERCIAL STALLS – Guiuan E. Samar, Philippines

● In Charge from Design concept to Construction drawings and Implementation.

● Assist and provide client all necessary documents to secure building permits.

● Manage, direct, supervise and monitor the activities of construction.

● Coordinate with Contractors, Suppliers and others Trade. Project In Charge – ARCH. BART B. VISTA (PRIVATE PRACTICE) PROJECT: 2-STOREY RESIDENTIAL HOUSE – Metro Manila, Philippines

● Manage, Supervise and Directly monitors the construction activity.

● Evaluate daily output of the construction then Report to Architect and Client.

● Evaluate, Purchase & monitor Construction Materials.

● Coordinate with Contractor, Suppliers and others Trade. Arch. MARIO G. ABRIS u.a.p CV Page 4

Design/CAD Draftsman – ARCH. BART B. VISTA (Private Practice) PROJECT: TWO RESIDENTIAL PROJECT – Kuala Lumpur, Malaysia

● Prepare Layout Plan drawings of 3-Storey Residential Project.

● Involved in preparation of the Schematic Design drawings of 2-Storey Residential Project.

● Prepare Sanitary waste Layout and one line diagram of 2-Storey Residential Project.

● Prepare Electrical, Sanitary and Plumbing Layout of 3-Storey Residential Project. Design/CAD Draftsman – GOTHICMATIC SDN BHD

PROJECT: 5-STOREY OFFICE BUILDING – Kuala Lumpur, Malaysia

● Prepare Interior Layout Plan of 5-Storey for the office building.

● Involve in preparing Architectural Detailed drawings.

● Involve in preparing Electrical Layout and detailed drawings.

● Involve in Sanitary and Plumbing Layout and detailed drawings. Project In Charge – AR ADLAWAN & ASSIOCIATES

PROJECT: 2-STOREY RESIDENTIAL PROJECT – Tacloban City, Leyte, Philippines

● Prepare Construction Daily Report for the 2-Storey Residential Project.

● Manage, Supervise and Monitor the activities of the construction.

● Time keeper and purchase a construction materials. On Job Trainee/CAD Draftsman – AR DLAWAN & ASSIOCIATES PROJECT: 2-STOREY RESIDENTIAL & SUB DIVISION PROJECT – Tacloban City, Leyte, Philippines

● Prepare Architectural Layout of 2-Storey Residential project.

● Assist in 3D modeling of two design competitions.

● Assist & prepare the Building Cost Estimate for the 2-Storey Residential project.

● Assist in preparation of documents necessary for Building Permit. PERSONAL DATAILS

Nationality : Filipino (Philippines)

Date of Birth : 16 May 1977

Marital Status : Married

Language : Filipino & English

Availability : Can Join Immediately

References : Available Upon Request



Contact this candidate