Post Job Free
Sign in

Engineer Quality

Location:
Miami, FL
Posted:
October 20, 2020

Contact this candidate

Resume:

Eng. Jorge Paredes Vásquez

www.linkedin.com/in/jorge-paredes-b8a92245 +58-416-***-**** ***********@*****.***

PROFESSIONAL PROFILE

Industrial Engineer - Master in Quality Systems - Specialist in Quality System with more than 10 years of experience in the area of quality management, continuous improvement, total quality, Balance Scored Card, AMEF, quality audits, statistical quality control, Management Indicators.

Experience as supervisor / Management in the areas of production, manufacturing and Project Control with knowledge and management of Good Manufacturing Practices, ISO 9000 Standards, Risk Analysis and Critical Control Points (HACCP). Additionally, experience in the area of corrective and preventive maintenance and civil works.

Transformational leader with the ability to motivate staff and oriented to the achievement of programmed objectives.

SKILLS

●Leadership.

●Analytical capacity.

●Achievement oriented.

●Preparation of reports.

●Availability to travel.

●Elaboration of Indicators.

●Budget Management.

●Public Speaking and Speaking

●Continuous Process Improvement.

●Team leadership.

●Advanced English / Spanish.

●Good command of Microsoft Office.

EXPERIENCE

Quality and Sanitation Supervisor

KRON chocolates, Caracas, VE April 2018 - Present

Venezuelan company dedicated to the manufacture and marketing of chocolate and cocoa derivatives.

Job functions:

Execute the sanitation program to ensure the order and cleanliness of the plant.

Pest Control.

Compliance with ISO 9001-2015 / HACCP.

Inventory management of cleaning materials

Verification of compliance with Good Manufacturing Practices.

Focus on the standardized work activities of the plant so that the Management System is the reference for continuous improvement.

Complete and report all sanitation paperwork, budgeting, and inventory.

Prepares and handles sanitation chemicals and equipment.

Coordinate and verify cleaning responsibilities and ensure that any defaulting processes are stopped and reviewed.

Identify need for process improvements/procedures required.

Lead Root Cause Analysis (RCA) sessions and implement any corrective actions from RCA sessions.

Achievements:

Updating of the sanitation program considering in its terms cleaning of aerial and external surfaces. .

100% reduction in incidents caused by the presence of pests.

Increased levels.

Performing sanitation audits.

Dissemination of Sanitation activities

Increase in Hygiene and Sanitation levels reflected in the Management Indicators.

Compliance with Good Manufacturing Practices.

Head of Project Control Division

National Urban Transport Fund Foundation (FONTUR) Caracas, VE Sept. 2013 - April 2018

Agency responsible for public transport in all its forms: urban, suburban, interurban, school.

Job functions:

Preparation of the Annual Operational Plan containing the audits of the executed projects. .

Coordination of Project Audits.

Monitoring project costs, sticking to a budget, and reviewing project quality compared to the desired objective

Verification of levels of compliance through Management Indicators.

Development of Key Performance Indicators.

Develop reports on actuals, variances, trends and re-forecast as necessary.

Review and validate contractual compliance of project invoices.

Understand project documentation thus ensuring compliance with the scope of work.

Achievements:

Full compliance with the Annual Operating Plan.

Presentation of Results through data obtained from the new Key Performance Indicators developed.

Reduction of payments of valuations of work not executed without validation.

Project Auditor IV

National Urban Transport Fund Foundation (FONTUR), Caracas, VE April 2008 - Sep. 2013

Agency responsible for public transport in all its forms: urban, suburban, interurban, school.

Job functions:

Verification of the contractual terms of the project.

Analysis of the execution of the resources assigned to the evaluated projects.

On-site project execution inspection.

Evaluation of the effectiveness and efficiency of the departments responsible for the execution of the projects.

Preparation of Audit Results Reports.

Coordinating and monitoring the assigned engineering projects.

Evaluate compliance, quality control, and quality assurance standards and specifications.

Track performance and analyze the completion of key goals.

Verify compliance with all applicable rules, regulations, best practices, and performance standards

Achievements:

Updating of the audit results report including new revision lines.

Compliance with tax actions.

Special Project Technician

Provincial Bank (BBVA), Caracas, VE August 2007 - February 2008

Offer banking services to clients.

Job functions:

Check the progress of the monetary reconversion project.

Development of Management Indicators.

Develop and control the full project-plan lifecycle.

Create and administer appropriate testing protocols to monitor project performance.

Manage project issues, risks and actions.

Project evaluations and assessment of results.

Preparation of weekly and monthly progress reports/presentations

Achievements:

Completion of the monetary reconversion project.

Elaboration of Indicators.

Management Advisor

Ministry of Infrastructure (MINFRA), Caracas, VE February 2005 - December 2006

Agency in charge of the construction of the national infrastructure.

Job functions:

Verify the effectiveness and efficiency of the assigned resources.

Completion of documentation to show and ensure compliance with both internal and external regulations.

Preparation of reports.

Ensuring processes comply with safety and quality standards.

Oversight and working to maintain optimization of the processes.

Review the KPI monitoring systems and determine ways to improve their ability to maintain company operations.

Oversee implementation of new processes and procedures.

Investigate and troubleshoot any problems that arise with processes, procedures, and operations.

Develops Process Flow diagrams to show operations.

Analysis of existing processes in terms of efficiency and effectiveness.

Preparation of target vs. actual comparisons.

Achievements:

Approval of operations manuals.

Preparation of Key Performance Indicators.

Thesis

ODEBRECHT, Caracas, VE March 2004 - August 2004

Global group operating in the engineering and construction, industry and development and operation sectors of

infrastructure and energy projects.

Job functions:

Prepare a Preventive Maintenance Program for the Tunneling Machine (TBM) on Line 4 of the Caracas Metro.

Achievements:

Design of a Preventive Maintenance Plan for the Tunneling Machine (TBM) on Line 4 of the Caracas Metro.

EDUCATION:

Master - Quality Systems / Universidad Católica Andrés Bello (2012 - 2017) Caracas, VE.

Specialization - Quality Systems / Universidad Católica Andrés Bello (2007-2011), Caracas, VE.

Engineer - Industrial Engineering / Universidad Santa María (1997-2004) Caracas, VE.

COURSES:

BUDGET BY PROJECT ”(2007) UCV (GEFAC). Duration: 24 Academic Hours.

QUALITY MANUAL FOR ISO 9001-2000 ”(2007) GIDE STANDARDS. Duration: 10 academic hours.

QUALITY SYSTEMS ISO 9000 ”(2007) FIMP-CIV. Duration: 16 academic hours.

BALANCED SCOREDCARD ”(2007) GIDE. Duration: 10 academic hours

WAREHOUSE MANAGEMENT AND CONTROL ”(2007) GIDE. Duration: 10 academic hours.

PROJECT MANAGEMENT ”(2006) UCV (GEFAC). Duration: 24 Academic Hours.

IMPLEMENTATION OF THE ISO 9001-2000 STANDARDS ”(2006). GIDE. Duration: 10 academic hours.

PROCEDURES FOR AUDITING AN ISO 9001-2000 QUALITY MANAGEMENT SYSTEM "

(2005). (AADEM, CA) Duration: 10 academic hours.

FINANCES FOR NON-FINANCIAL EXECUTIVES ”(2005). (GIDE). Duration: 10 academic hours.

MANAGEMENT INDICATORS". (2005). (AADEM, CA). Duration: 10 academic hours.

WELDING TO THE ELECTRIC ARC ”(2002). BOC GASES. Duration: 3 academic hours.



Contact this candidate