Post Job Free

Resume

Sign in

Engineer Electrical

Location:
Chandigarh, Chandigarh capital, India
Posted:
October 19, 2020

Contact this candidate

Resume:

NIMISH JUNEJA

Contact: Flat No. M-***,

Parkwood Glade, Sector - 116,

Mohali - 160055 (Punjab)

Mobile no - +91-998*******

Email: adg32o@r.postjobfree.com

PROFESSIONAL SUMMARY:

I commenced my professional career as Senior Engineer in Ess Ess Kay Engg. Co. (P) Ltd in Oct 2007. Then joined MICROMOUNT - PMC as MEP Engineer in Sep 2009 on a 5 star Hotel project. Further moved to PACL Limited as an Assistant Manager (Services) in July 2013. Then joined Sandwoods Infratech Pvt. Ltd. In Sep 2014. Further moved to Thapar University, Patiala as MEP Head in Aug 2015. Currently working with Reliance Industries Limited as Project Coordinator Electrical from July 2018.

PROFESSIONAL QUALIFICATION:

PGDBA in Operations from Symbiosis University, Pune.

B.Tech in ELECTRICAL ENGINEERING from ‘Shaheed Bhagat Singh College of Engineering & Technology' Ferozepur, Punjab. (A Punjab Government Institute) affiliated to Punjab Technical University, Jalandhar in 2007 & secured 63.75% marks.

PROFESSIONAL EXPERIENCE IN DETAIL:

1)Reliance Industries Limited - Currently working with Reliance Industries Limited as an Assistant Manager Electrical from July 2018 for their Retail Outlet Projects like Reliance Trends, Reliance Smart, Reliance TST, Reliance Eve, Reliance Jewels, Reliance Footprints, Reliance Jio Centre, Reliance Jio Points etc. across Chandigarh, Haryana & Himachal Pradesh.

PROJECTS:

Reliance Trends - Successfully handed over 30 nos. stores across Haryana & HP.

Reliance Jewels/Digital/Smart - Successfully handed over 12 nos. stores across Haryana & HP.

Reliance Jio Centre/Jio Points/Mini Dx - Across Haryana & Himachal Pradesh.

Job Profile:-

Coordinating with all sites.

Coordinating with consultants for drawings and deliverables.

Study & Vetting of drawings and BOQ.

Monitoring of progress of works & Bill checking.

Quantity & Quality check of the work being executed for MEP services.

Looking upon Maintenance for first one year of all sites.

2)Thapar University, Patiala - Worked with Avantha Group’s prestigious university from August 2015 to June 2018 for their expansion buildings like hostels, faculty residences, academic blocks etc. Companies involved were:

Client

Thapar University

Civil Contractor

Gannon Dunkerley & Co. Ltd

PMC

Colliers International India

Architect

Mc Cullough Mulvin Architects, Dublin Ireland

Design Plus Associates, New Delhi

MEP Contractor

Blue star India Ltd., Sudhir Power,

Zamil India Ltd.

Designation: - Assistant Manager Electrical (MEP Head)

Job Profile:-

Co-ordination with architects, consultants & PMC to resolve the issues of services matters & timely delivery of MEP drawings, review of shop drawings & approval from consultant.

Review & finalization of MEP services BOQ & Technical Specifications etc.

Preparation of Cost Estimates for all the MEP contracts.

Coordinating with all sites, Execution of MEP services at site.

Participating in Project review meetings for evaluating project progress.

Tracking the deliveries of MEP Equipments/materials.

Preparation of budget and tracking of budget.

Floating tenders, Preparation of comparison statement, Selection of contractor and negotiating with them.

Coordination with MEP contractors for shop drawings submittals, Material deliveries, Testing & commissioning, as built drawings.

Responsible for the supply, installation, testing and commissioning of Chillers, Transformers, electrical panels, DG sets, HVAC system etc.

Quantity & Quality check of the work being executed for MEP services.

Bill checking & Site supervision.

To plan preventive maintenance for electrical Equipments.

Electrical repair and maintenance of existing buildings inside the campus.

Maintenance of electrical distribution & control Panels, DG sets, transformers, UPS, AC plants, EPABX etc.

Managing staff for handling electrical, A/C and Telephone related complaints within the campus.

PROJECTS: Worth Rs. 300 Cr.

Boys Hostel - PEB 600 & PEB 300 - Successfully Handover.

Boys Hostel - 1200 seaters - A high rise building - Successfully Handover.

Girls Hostel - 500 seaters - Successfully Handover.

11 KV Substation - 1250 KVA x 01 No. Transformer + 7 Way RMU- Completed.

11 KV Substation -1250 KVA x 02 Nos. Transformers + 6 Way RMU - Completed.

11 KV Substation - 2000 KVA x 02 Nos. Transformers + 5 Way RMU - Completed.

Plant Room - Chillers - 450 TR x 3 - Completed.

VRF - 1734 HP - Completed.

3)Sandwoods Infratech Pvt. Ltd as an Electrical Engg. From September 2014 to August 2015

PROJECTS: Worth Rs. 100 Cr.

Sandwoods Opulencia - Sector 110, Mohali - A high rise residential building

Spangle Lok Vihar – Baddi

Campton Estate - Shimla

Sandwoods Euphoria - Kasauli

Job Profile:-

Coordinating with all sites.

Execution of MEP services at site.

Checking & correction of services drawing.

Co-ordination with consultants & Head Office to resolve the issues of services matters.

Checking & correction of BOQ presented by consultant & bill checking.

To plan preventive maintenance for electrical Equipments.

Maintenance of electrical distribution & control Panels, DG sets & Transformers etc.

4)PACL Limited as an Assistant Manager (Services) from July 2013 to September 2014.

PROJECTS:

Pearls Hotel - Sector 43, Chandigarh

Pearls Residency - Mohali

Banquet cum club - Banur

Sector 100, 104 - Township, Mohali

Pearls Corporate Office - Sector 69, Mohali

Job Profile:-

Coordinating with all sites

Coordinating with consultants for drawings and deliverables.

Study & Vetting of drawings and BOQ.

Floating tenders and preparation of comparison statement.

Preparation of work orders & BOQ.

Preparation of budget and tracking of budget.

Monitoring of progress of works.

Bill checking.

5)MICROMOUNT - PROJECT MANAGEMENT AND CONSULTANCY COMPANY (PMC) as MEP Engineer from September 2009 to July 2013

PROJECTS:

Completed KC Royal Park- 5 Star hotel in Panchkula (Haryana)

Job Profile:-

Execution of work according to tender specifications

Supervise the MEP work

Co-ordination with consultant and architect for drawings

Co-ordination with services and civil contractors to provide the clearance of work

Responsible for the supply, installation, testing and commissioning of chillers, transformers, electrical panels, DG sets, HVAC system etc.

Quantity & Quality check of the work being executed for MEP services

Responsible for coordination with vendor till job completion assigned to vendors

Verification and checking of sub-contractor bills inline with BOQ and contract agreement

Manpower & Material Management

Preparation of bills on excel and measurement

Preparation of BOQ (Bill of quantities)

Inviting quotations from vendors for materials and services and suggesting the management team about the most cost-effective option.

Preparation of Daily, Weekly and One Month progress report.

Preparation of the detailed Site quantities requirement based on the consultants approved drawings.

6)Ess Ess Kay Engg. Co. (P) Ltd in Kapurthala (Punjab) as Sr.Engineer from Oct 2007 to July 2009.

Computer Exposure:

Computer Billing

Knowledge of MS-Office, E-Mail/Internet, Computer Typing.

Basic knowledge of AUTO CAD

Hobbies

Travelling, Playing Cards, Cricket.

Personal Details:

Date of Birth: April 11, 1985

Marital Status: Married

Languages Known: English, Hindi and Punjabi

DECLARATION:

I hereby declare that the details furnished above are true to the best of my knowledge &belief.

Date: Signature:



Contact this candidate