Post Job Free

Resume

Sign in

Petroleum Engineer

Location:
Pitalito, Huila, Colombia
Salary:
5000 USD
Posted:
October 18, 2020

Contact this candidate

Resume:

}}

Position: Operations Engineer (Current Job)

Company: Energreen Technology S.A.S

Address: Av 17C # 50-73 (Neiva)

Time: 4 Months (From June 1, 2020)

Functions: Supervise, coordinate and execute the related operations with drilling shallow water wells as per contract in Huila and Tolima Departaments. Position: Company Man A1

Company: Consultec - ECOPETROL

Address: Av 9ª · 99-02 OF 404

Time: 12 Months (From March 1, 2019 To February 29, 2020) Field: Casabe

Functions: Supervise operations and carry out logistics in Workover / Wellservice / completion in the casabe field (Yondó - Antioquia) such as: Abandonment and re- abandonment, run of ESP / PCP / BM completions, sand cleaning, insulation, fishing, well intervention with selective injection strings and handling of Open Wells Software by Landmark.

Position: Company Man A2

Company: Consultec - ECOPETROL

Address: Av 9ª · 99-02 OF 404

Time: 7 Months (From August 9, 2018 To February 28, 2019) Field: Yariguies – Cantagallo - Casabe

Functions: Supervise operations and logistics in Workover / wellservice in the Yariguies, Cantagallo and casabe fields, such as Abandonment, ESP / PCP changes and sand cleaning, extraction of completions with mechanical pumping, Supervision of perforating and definitive completions in new drilled wells 2018 and 2019 campaign (Until February 2019) and handling of Open Wells Software. APE ALVARO ANDRÉS DELGADO VEGA

EMAIL: adg2te@r.postjobfree.com

C.C. 1.075.215.916 from Neiva. Professional Card: CPIP 5889 Res. 0865 Passport Number: AO 283781

Place and date of Birth: Neiva, September 20

th

, 1986

Cell: +57-321*******

LIDO

Petroleum Engineer with 9.4 years of experience in Drilling / Completion and Workover / Wellservice activities in the area of Huila, Putumayo, Caquetá, Santander, Antioquia and eastern plains, highlighting the main strengths of personnel management, teamwork, leadership and sense of belonging institutional. Public recognition is highlighted during graduation as an outstanding student of Petroleum Engineering by occupying eighth place at the national level in the ECAES test of 2009 and an honorable mention when completing technical studies in well drilling.

PROFILE

EMPLOYMENT HISTORY

Position: Drilling & Workover Engineer

Company: Amerisur Exploración Colombia Limitada

Address: Tv 21 # 98-71 Floor 6, Bogotá

Time: 25 Months (From June 15, 2016 To July 23, 2018) Fields: Andaquíes (Caquetá), FENIX (Santander), Platanillo (Putumayo), CPO5

(Meta), PUT 8 (Putumayo)

Functions: Perform drilling and Workover programs, develop well designs according to geological objectives, prepare designs for interventions after completion of wells, prepare AFEs related to drilling and Workover, prepare documents for private requests for offers - tenders and / or market surveys, perform technical evaluation of offers, follow up on contracting processes, coordinate logistical support for services during operations, monitor the execution of drilling and Workover work, participate in the definition and execution of civil works, prepare documents required by the regulatory authorities of the business such as the MME and ANH and follow-up projects with strategic partners in Putumayo (Block PUT 8) and Eastern Plains (Block CPO5).

Achievements: Lead between 2017 and 2018 stimulation campaigns with Coiled Tubing in platanillo field (Putumayo) which increase the daily production of the field by 33% and additionally reduce the rates with contractors for 2018. Planning for abandonment of wells in Putumayo (Libélua-1) and Santander (Ave 1, Iguasa 1 and Isabel 1 ST, two with simple completions for natural flow / Hydraulic pumping and another with mechanical pumping). Follow-up of projects with strategic partners in Putumayo (Block PUT 8) and Eastern Plains (Block CPO5) which reduces budgets and drilling times. Presentation of A3 Caballete 1 well project in the municipality of Albania (Caquetá), raising awareness in the community to achieve continuity in the Andaquíes block project. Link for the second time to the Amerisur Long Term Incentive Plan (LTIP) for exceptional business performance with 90,000 shares since June 23, 2017.

Position: Assistant to Company man in Drilling operations Company: Amerisur Resources PARAGUAY

Time: 3 Months (From March 05, 2016 To may 23, 2016) Field: San Pedro Block, Jaguareté -1 Well (Liberación - Paraguay) Functions: Importation and technical logistic support in drilling operations in Jaguareté-1 Well located at San Pedro block, daily report processing and costs. Position: Company Man of Workover

Company: Amerisur Exploración Colombia Limitada

Address: Tv 21 # 98-71 floor 6, Bogotá

Time: 17 Months (From August 2014 To January 18, 2016) Field: Platanillo (Putumayo)

Functions: Lead and supervise well intervention operations (workover and well service) in platanillo field to increase production by reducing water cut; convert low production wells into water injectors associated with crude oil, run DST-TCP completion strings with sxar technology, cased hole logs, squeeze operations, trhu tubing and TCP perforating, slickline operations and fishing operations. Position: Assistant to Company man in Drilling operations Company: Amerisur Exploración Colombia Limitada

Address: Tv 21 # 98-71 floor 6, Bogotá

Time: 26 Months (From June 2012 To August 2014)

Field: Platanillo (Putumayo)

Functions: Logistic and technical support in drilling and workover operations in the wells of the platanillo field, daily reports / cost control Position: Engineer Company Man

Company: Emerald Energy

Field: Gigante

Contractor: Reikcon Holdings Sas

Address: Av. Cra 19 No. 118-95 Office 509

Time: 5 Months (From February 11, 2012 To June 19 2012) Functions: Logistical and technical support in drilling operations in Gigante

(Matambo Block) at 3, 5 and 10 st wells, completion of daily reports / costs in English and weekly presentations in PPT for Bogotá operations Position: Operations Engineer

Company: Saxon Energy

Field: Gigante

Contractor: Manos de Bogotá

Address: Transversal 15B No. 46-16 Office 303 (Tel: 2852875) Time: 1 Month (From January 10, 2012 To January 30 2012) Functions: Logistical and technical support in drilling operations in Gigante

(Matambo Block) at 3 and 5 wells, completion of daily reports / costs. Position: Engineer I

Company: GWDC (Great Wall Drilling Company)

Field: Gigante

Contractor: Manos de Bogotá

Address: Transversal 15B No. 46-16 Office 303 (Tel: 2852875) Time: 7 Months (From June 8, 2011 To December 31, 2011) Functions: Apprentice Engineer - Mud Engineer Assistant, Report Filing and Translator, Fluid Preparation Support, and Field Lab Testing. Position: Practicing Engineer – Estimulation Lab USER ID: hb57681 PSL: PE - lab Company: Halliburton S.A, Neiva

Time: 6 Months (From November 2, 2010 To May 01, 2011) Functions & Achievements: Perform Laboratory tests to characterize crudes, analysis of returns in stimulations and formation waters, design of fracture fluids

(delta frac 140-200 system) applying sandwedge technology and compatibility tests. 100% PPR compliance on Ilearn courses.

SKILLS AND LANGUAGES

• Stress Management Spanish

• Fast Learning

• Team Work

Software: Excel, Word,

English PowerPoint, Outlook, Open Wells

(B1)

OPERATIONAL EXPERIENCE

Drilling & Completion Planning, logistics and supervision of exploration and development well drilling and supervision in completion / Workover operations in the Putumayo / llanos basin (CPO5 block) / Caquetá (Andalucia block) / Casabe (Antioquia), Running TCP- DST, PCP, ESP Strings and hydraulic pumping, WBCO, Interpretation cement logs.

Workover & Wellservices Coiled Tubing, Bullheading Stimulation, Zone Isolation, Reperforating, Remedial Cementation, Milling operations, Cased hole fishing, Injectivity Testing, Abandonment / Re-abandonment, Rigless Operations, Mechanical Pumping, ESP, PCP, Hydraulic Pumping, Conversion of producing wells to injectors and sand cleaning.

.

EDUCATION

Universtity: Surcolombiana

Petroleum Engineer - 2011

Others studies & Courses: Technical Petroleum Institute Technical Occupational in Petroleum Well Drilling – 2003 Chamaleon Resources

RIG PASS - August 26th, 2014

ITP Barrancabermeja

IADC WellSharp – Drilling Operations supervisor, surface (Well Control) May 9th, 2019 (No. Certificated: 107*******-A08EB1) Metrología y servicios

Training for Safe Work at Heights – Advanced Level April 27th, 2019

. INGECONHSEQ

Defensive Driving – June 5th, 2019

Training Consultors Colombia S.A.S

STUCK PIPE – September 6th, 2019

APTITUDE

• Conviction to work safely and with quality

• Ability to learn at the pace of the needs of each operation

• Constant performance in jobs “under pressure” and with great responsibility

• Dynamism when working in a team

• Ease of oral and written communication, both in Spanish and English

• Ease to teach or explain complex operations to less experienced staff ALVARO ANDRES DELGADO VEGA

C.C 1.075.215.916

LABOR REFERENCES

• JEAN PAUL GARCIA – COMPANY MAN – 313-***-****

• INGRID DE LA ROSA – PROFESSIONAL SISO - SUBSUELO CASABE – 312-***-****

• CARLOS DE LOS RIOS – COMPANY MAN A1 - CONSULTEC – 313-***-****

• JOHNNIE VELASCO – PUTUMAYO MANAGER – GEOPARK – 311-***-****

• JEYSSON PERDOMO – OPERATIONS MANAGER - ENERGREEN TECH - 312-***-****



Contact this candidate