MEHNAZ AKHTAR
**(A), Parijat Path, Hatigaon, Guwahati-781038 Email: ***************@*****.*** Phone: +91-979******* www.linkedin.com/in/mehnaz-akhtar
EDUCATION:
**/**** –
SRM Institute of Science and Technology
Master of Technology, Construction Engineering and Management
• Relevant Modules:
Chennai
GPA: 7.61/10
o Construction Planning, Scheduling &
Control
o Construction Equipment and Management
o Advanced Construction
Techniques
o Quantitative Techniques In
Construction Management
08/2014 –
05/2018
SRM Institute of Science and Technology
Bachelor of Technology, Civil Engineering
Chennai
GPA: 6.92/10
RESEARCH PUBLICATION:
09/2019 “Tracking of Construction Progress Concerning Activity Wise Equipment Delay” B. Indhu, K. Yogeswari, Mehnaz Akhtar
International Journal of Recent Technology and Engineering (IJRTE) ISSN: 2277-3878, Volume-8 Issue-3, September 2019
https://www.ijrte.org/wp-content/uploads/papers/v8i3/C4459098319.pdf WORK EXPERIENCE:
05/2019-
06/2019
CTAI
Construction Management Intern
• Studied CPM chart and use of Modern machinery, equipment and technologies used in Construction works.
• Monitored standard of work of the building at the site
Missamari,
Tezpur
12/2016-
01/2017
Public Works Road Department (PWRD)
Civil Engineering Intern
• Assisted Senior Engineering in Highway construction on Site supervisions.
• Studied highway, roadway plans and standards.
Guwahati
06/2016-
07/2016
Northeast Frontier Railway
Civil Engineering Intern
• Assited Senior Engineering in Rail roads construction on the site and office.
• Perfomed site inspection work and verifying with plans.
Guwahati
ACADEMIC PROJECTS:
08/2019-
04/2020
Tracking of Construction Project Concerning Activity Wise Equipment Delay
• The questionnaire was prepared related to delay in construction due to the equipment delay factor.
• Totally 200 responses were collected for 11 activities from various companies.
• The analysis was done in Relative Important Index (RII) to calculate the highest factors and the lowest factors which cause or effect the delay in construction.
• Identified the highest causes of delay for each project. 02/2018 –
05/2018
Design and Analysis of Auditorium
• Completed full Architectural and Structural design detailing with specifications of an Auditorium building of 1000 seats in AutoCAD, designing all the structural members manually using Indian Standard codebooks.
• Analyzed, designed, and did detailing of the model in ETABS, and SAFE. 02/2017-
05/2017
Design of Pile Foundation on Swampy Soil by Ground Improvement Method
• Designed concrete piles using manual hand calculations referring to IS-564. SKILLS:
AutoCAD
Microsoft Project
Primavera
Activity wise
Construction progress
Equipment Delay
Scheduling
Estimating
Planning
REVIT
Microsoft Excel