I have worked with very reputed

multinational contractors, consultants and project in Pakistan, United Arab Emirates & Qatar for construction of various disciplines of works such as heavy RCC works, pilling works, slip-forms for high rise buildings, highway based roads pipelines, post tension work. Etc. DUTIES INVOLVED

1 To make survey of the existing conditions and preparation of the drawings. 2 Setting-out of storm waterline & manholes, Irrigation pipelines and future road crossing ducts. Valve boxes. Street lighting cables, pole foundations, Traffic signals etc. 3 Bridges: Piling, Pile caps, Slabs and all types of Survey Works for Bridges 4 Building work Setting-out of the building as per the approved drawing and levels. 5 Monitoring the verticality of multi storied towers. 6 Establishing of basic grids, reference levels for subcontractors like lifts, curtain walls, pre casts etc.

.

1 Layout of Roads centerline (curves & straight)

2 Setting out of Various elements of Bridges

3 Observation of cross-sections and earthwork volume calculations 4 Calculations and fixing of slope-stakes

5 Control of layers

6 Fixing of sensor wire

7 Setting-out of alignment for pipeline with the coordinates, by bearing & distance 8 Controlling of levels of pipe inverts.

9 Plotting of cross-sections and earthwork volume calculations. EXPERENCE RECORD IN QATAR.

February 2017— Till Date

QD-SBG Construction.

Brief Description of your Duties & Responsibilities. Limit your sentences to five. PROJECT(S)

Project: Design & Construction of CP-07B Lusail Plaza Infrastructure, LRT station, Car Park and Land Scape.

Contract Value: 4.6 Billions QR

CAREER OBJECTIVES

NATURE OF WORK

Client: Lusail Real Estate Development Company

Responsibilities.

Marking Alignment/levelling of Raft foundation, Concrete Walls, Intermediate and Pergola Slabs, column, beams and all type of structural work including bridges and 800 Meter Tunnel. Marking for Ducts, sewage lines, water lines and Electric Cables, marking working lines for earthwork equipment’s with Total Station, Lay-out and setting out of Landscaping Paths, retaining walls, perform verification survey Checking and settings of work request. Prepared survey activities and progress report of completed construction work. Checked the as- built drawings and earth quantity of work with survey data. Kept accurate and detailed notes, survey records and sketches with proper documentation. Processed raw data from site and prepare the plans& sections using with Auto Cad and Surveying related software.

URBACON CONTRACTING COMPANY.

: February 2015 – January 2017

HOTEL AND COMPLEX OF AL NAJADA SOUQ .

Contract Value: 275,000,000

Client: ASHGHAL PUBLIC WORK AUTHORITY

Responsibilities.

Marking Alignment/levelling of foundation, column, beams, slab and all type of structural work. Marking for Ducts, lines and, water lines and Electric Cables, marking working lines for earthwork equipment’s with Total Station, Lay-out and setting out of Landscaping Paths, retaining walls, perform verification survey Checking and settings of work request. PROJECT:

SOUQ WAQIF UNDER GROUND CAR PARK

ACCOMDATING: 2200 CARS February 2012 — FEB 2015

CONTRACTOR UCC /KCT

Client: PRIVATE ENGINEERING OFFICE

Responsibilities.

1. Establishment of primary control points around the project site & tied up to the Government Survey points duly submitted to the consultant for acceptance 2 Setting-out of Piles, Guide wall centerline & Shutters

3 Checking alignment & level of Piles casing after punches before drilling up to desired depth.

Checking Alignment & levels of capping beam made before concrete casting.

Setting-out of working piles, checked after pile casing punches.

Blinding levels, Screed levels, water stop levels & alignment, Construction & Expansion joint alignment

MEP Alignment & Levels

RAFT Foundation levels, wall alignment & levels Alignment & level of structural members such us Columns, beams & panels Hallow core Slabs all lay-out must according to approved design plan PROJECT:

DOHA AND REYHAN ROAD PROJECTS

September 2011— FEB. 2012

Client: ASHGHAL

Responsibilities.

Reporting to Senior Surveyor.

Maintains and updates survey records and registers.

Assists quantity surveyors in calculations for quantities involving field data such as earthworks and items involving physical measurements on site. Performs construction surveys to establish lines and grades within the construction site using Level machine and total station

.

• Leica TS-15

• Leica TS-12

• Leica TS-06

• Automatic level machine

• Leica TS-09

• Other necessary Survey Instruments

INSTRUMENT USED

EDUCATION.

6 MONTH DIPLOMA IN SURVEYING

6 MONTH DIPLOMA IN AUTO CAD

GOVT COLLEGE OF TECHNOLOGY RASUL MANDI BAHUDDIN.

Languages known ENGLISH, ARABIC, URDU, PUNJABI & HINDI I hereby declare that above information is true and up to date to the best of my knowledge. IRFAN ASLAM



Contact this candidate