RONALD ALVAREZ CUDAL
Address : Block **, Lot **, Phase 4 ACM Woodstock Homes, Barangay Carsadang Bago
Imus City, Cavite, Philippines
Tel No. : ( 046 ) 476-9033
E-mail : adg1kv@r.postjobfree.com
Position Apply for : Construction Head
Work Experience :
I. PROJECT CIVIL ENGINEER III
EMPIRE EAST LAND HOLDING, INC.
21ST Floor The World Centre Bldg.
330 Sen. Gil Puyat Ave., Makati City, Philippines
October 23, 2012 to September 30, 2019
A. DUTIES & RESPONSIBILITIES
1.Owner’s representative (Owner side) for the duration of the project from start to finish.
2.Review construction documents (Plans, specifications, shop drawings and materials sample submittals) for the purpose of coordination and consistency of requirements and conditions. Any conflict or discrepancies in the construction documents shall be brought to the attention of those concerned for clarification and/or decision..
3.Close coordination with the general contractor and other trade contractors of different disciplines (electrical, mechanical, sanitary, etc.)
4.Conduct regular inspection as work progress to assure compliance with the approved plans, shop drawings and specifications.
5.See to it that manpower, equipments and materials of the contractor are adequate for the work and within schedule.
6.Coordinates with Architects, Engineers, Consultants and other parties concerned when clarification and interpretation of documents become necessary.
7.Conduct such conference and regular construction coordination meetings among contractors and subcontractors to maintain schedule and clarity any matter in dispute.
8.Review estimates as construction proceeds and required to incorporate approved changes as they occur.
9.Check and evaluate applications of progress payment for endorsement
B. PROJECTS HANDLED:
1. Construction of 36-Floors Pioneer Woodland Tower-3 @ Pioneer St, Corner EDSA, Mandaluyong City
2. Construction of 36-Floors Pioneer Woodland Tower-4 with Bored Piling Works @Pioneer St, Corner EDSA, Mandaluyong City
3. Construction of 37-Floors Pioneer Woodland Tower-5 @Pioneer St, Corner EDSA, Mandaluyong City.
4. Construction of 37-Floors Pioneer Woodland Tower-6 with Bored Piling Works @Pioneer St, Corner EDSA, Mandaluyong City
I. SENIOR CIVIL ENGINEER
DERM PHARMA INC.
5th Floor Champaca Building
156 Amorsolo St. Legaspi Village, Makati City
November 2011 to July 2012
A. DUTIES & RESPONSIBILITIES
10.Owner’s representative (Owner side) for the duration of the project from start to finish.
11.Review construction documents (Plans, specifications, shop drawings and materials sample submittals) for the purpose of coordination and consistency of requirements and conditions. Any conflict or discrepancies in the construction documents shall be brought to the attention of those concerned for clarification and/or decision.
12.Prepare tender documents for bidding/quotations. Evaluate bids/quotations for negotiations including awards of project.
13.Prepare overall program of work to be undertaken during the construction phase in close coordination with the general contractor and other trade contractors of different disciplines (electrical, mechanical, sanitary, etc.)
14.Conduct regular inspection as work progress to assure compliance with the approved plans, shop drawings and specifications.
15.See to it that manpower, equipments and materials of the contractor are adequate for the work and within schedule.
16.Coordinates with Architects, Engineers, Consultants and other parties concerned when clarification and interpretation of documents become necessary.
17.Conduct such conference and regular construction coordination meetings among contractors and subcontractors to maintain schedule and clarity any matter in dispute.
18.Review estimates as construction proceeds and required to incorporate approved changes as they occur.
19.Check and evaluate applications of progress payment for endorsement
B. PROJECTS HANDLED:
1. Renovation of 5-Storey Building and Construction of 2-Storey Building for New VBP Plant Project for Derm Pharma, Inc., Located @ Dominga St., Pasay City
I. PROJECT ENGINEER II
FORTE REALTY CORP.
5th Floor Kalayaan Bldg.
164 Salcedo St. corn. Dela rosa St. Legaspi Village, Makati City
Sept 16, 2008 to June 24, 2011
A. DUTIES & RESPONSIBILITIES
1.Owner’s representative (Owner side) for the duration of the project from start to finish.
2.Review construction documents (Plans, specifications, shop drawings and materials sample submittals) for the purpose of coordination and consistency of requirements and conditions. Any conflict or discrepancies in the construction documents shall be brought to the attention of those concerned for clarification and/or decision.
3.Prepare tender documents for bidding/quotations. Evaluate bids/quotations for negotiations including awards of project.
4.Prepare overall program of work to be undertaken during the construction phase in close coordination with the general contractor and other trade contractors of different disciplines (electrical, mechanical, sanitary, etc.)
5.Conduct regular inspection as work progress to assure compliance with the approved plans, shop drawings and specifications.
6.See to it that manpower, equipments and materials of the contractor are adequate for the work and within schedule.
7.Coordinates with Architects, Engineers, Consultants and other parties concerned when clarification and interpretation of documents become necessary.
8.Conduct such conference and regular construction coordination meetings among contractors and subcontractors to maintain schedule and clarity any matter in dispute.
9.Review estimates as construction proceeds and required to incorporate approved changes as they occur.
10.Check and evaluate applications of progress payment for endorsement.
B. PROJECTS HANDLED:
1. 5- Storey with 33-units of Villa Alicia I Condominium Building. Located at 4947 Reynaldo St. corn. Pasay Road, Brgy. Pio del Pillar, Makati City
2. 4- Storey with 65-units of Villa Alicia II Condominium Building. Located at 2659 Zamora St. Pasay City
3. 8- Storey with 98-units of Villa Alicia III Condominium Building. Located at #73 P. Tuazon Blvd., Brgy. Kaunlaran, Cubao, Quezon City
II. CONSTRUCTION MANAGER
JCL INTERNATIONAL, INC.
3rd Floor SJG Center
8463 Kalayaan Ave. corn. Don Pedro St. Brgy. Poblacion, Makati City
October 16, 2006 to May 15, 2008
A. DUTIES & RESPONSIBILITIES
1.Owner’s representative for the duration of the project from start to finish
2.Review construction documents (Plans, specifications, shop drawings and materials sample submittals) for the purpose of coordination and consistency of requirements and conditions. Any conflict or discrepancies in the construction documents shall be brought to the attention of those concerned for clarification and/or decision.
3.Prepare tender documents for bidding/quotations. Evaluate bids/quotations for negotiations including awards of project.
4.Prepare overall program of work to be undertaken during the construction phase in close coordination with the general contractor and other trade contractors of different disciplines (electrical, mechanical, sanitary, etc.)
5. Conduct regular inspection as work progress to assure compliance with the approved plans, shop drawings and specifications
6. See to it that manpower, equipments and materials of the contractor are adequate for the work and within schedule.
7.Coordinates with Architects, Engineers, Consultants and other parties concerned when clarification and interpretation of documents become necessary.
8.Conduct such conference and regular construction coordination meetings among contractors and subcontractors to maintain schedule and clarity any matter in dispute
9.Review estimates as construction proceeds and required to incorporate approved changes as they occur.
10. Check and evaluate applications of progress payment for endorsement to the client/owner.
11.Prepare close-out report and monthly report for submission to client/owner.
B. PROJECTS HANDLED:
1. New Office Fit-out for United Parcel Services (UPS) of 19th and 20th Floors at Insular Life Corporate Center Tower 2. Located at Commerce Ave. Alabang, Muntinlupa City, Philippines. Project Cost – Php26M
2. Expansion Fit-out Work of HSBC – Alabang, Located at Northgate Cyberzone, Alabang, Muntinlupa City, Philippines. Project Cost – Php56M
3. New Office Fit-out for Lawson Philippines Solution Services Corp.(PSSC) at 4th Floor One World square Building, Port Bonifacio Global City, Taguig City, Philippines – Project Cost – 95M
4. Two Storey Residential Building of Mr. Richard Weatherstone at Ayala Alabang Village (High-end Suddivision), Muntinlupa City, Philippines. Project Cost – Php35M
5. Cold Storage Facilities for Optodev, Inc. at Laguna International Industrial Park, Mamplasan, Binan. Laguna, Philippines.
6. Construction of Four (4) Storey and Basement for Laguna College at San Pablo City, Laguna, Philippines. Design Architect – Philip H. Recto Architects. Project Cost – Php100
IV. RESIDENT CIVIL ENGINEER - CM
R N FERRER & ASSOCIATES
CONSTRUCTION MANAGEMENT DIVISION
5/F, Padilla Building, Emerald Avenue, Ortigas Commercial Center, Pasig City
October 1995 to March 8, 2006
A. DUTIES & RESPONSIBILITIES :
1. Owner’s representative for the duration of the project from start to finish.
2. Review construction documents (Plans, specifications, shop drawings and materials sample submittals) for the purpose of coordination and consistency of requirements and conditions. Any conflict or discrepancies in the construction documents shall be brought to the attention of those concerned for clarification and/or decision.
3. Obtain bids/quotations and conduct negotiations including awards of the project
4. Prepare overall program of work to be undertaken during the construction phase in close coordination with the general contractor and other subcontractors of different disciplines (electrical, mechanical, sanitary, etc.)
5. Observe work in progress to assure compliance with the approved plans, shop drawings and specifications.
6. See to it that manpower, equipments and materials of the contractor are adequate for the work and within schedule.
7. Confer with Architects, Engineers and other parties concerned when clarification and interpretation of documents become necessary.
8. Conduct such conference and regular construction coordination meetings among contractors to maintain schedule and clarity any matter in dispute.
9. Review estimates as construction proceeds and as required to incorporate approved changes as they occur
10. Check and evaluate applications of progress payment for endorsement to the client/s.
11. Prepare monthly report concerning project accomplishment and status.
12. Prepare design drawings thru Auto CADD.
B. PROJECTS HANDLED:
1. Name of Project : AMKOR TECHNOLOGY INC. VARIOUS PROJECTS
Location : KM. 22, East Service Road, South Superhighway, Muntinlupa City, Philippines
A. AREA 1, Expansion of SBGA and Hermetic Relayout
B. AREA 1, Construction of MBGA Facilities
C. AREA 2 - Phase 1, Construction of Solder Plates Facilities, including Water Recycling Plant, Energy Building Transformer Room and Loading Dock
D. AREA 1, Expansion and Renovation of Tin Plating Facilities
2. Name of Project : CONSTRUCTION OF FIVE(5) STOREY OF XAVIER SCHOOL
MULTI-PURPOSE BUILDING
Location : #64 Xavier St., San Juan, Metro Manila, Philippines
3. Name of Project : CONSTRUCTION OF WEBFORGE PHILIPPINES
INDUSTRIAL PLANT & OFFICE BUILDING
Owner : Webforge Philippines, Inc., Australia
Location : Main Ave. corn. Hologram St., Light Industries Science Park of the Philippines I
Barangay Diezmo, Cabuyao, Laguna, Philippines
4. Name of Project : CONSTRUCTION OF THREE STOREY GLOBE TELECOM BLDG.
Location : Ipil St., Bayanbayanan, Marikina, Philippines
5. Name of Project : RENOVATION OF FOUR(4) STOREY OF EASTERN TELOCOM
EXCHANGE BUILDING - M3
Location : Soler St. corner Calero St., Quiapo, Manila, Philippines
6. Name of Project : CONSTRUCTION OF HADSYS PLANT
Location : Phase 4, Laguna Technopark, Inc.(LTI), Binan, Laguna, Philippines
7. Name of Project : CONSTRUCTION OF GLOBE TELEOM MSC
Location : Pioneer Corporate Center Madison St., Mandaluyong City, Philippines
8. Name of Project : CONSTRUCTION OF SCANATRONIC PLANT
Location : Tuason St. corner Bautista St., Malabon City
9. Name of Project : WYETH PHILIPPINES, INC. – QA Lab. – Aircon System Upgrading
Owner : Wyeth Philippines, Inc.
Location : Bo. Pittland, Canlubang Industrial Estate, Canlubang, Laguna, Philippines
10. Name of Project : PUNTA FUEGO VACATION HOUSE (3-STOREY)
Owner : Mr. Carlitos R. Concepcion
Location : Block 1, Lot 13, Peninsula de Punta Fuego, Brgy Balaytique, Nasugbu, Batangas
V. ENGINEER II – Project Management Unit
DEPARTMENT OF EDUCATION
EDUCATIONAL DEV’T PROJECT IMPLEMENTING TASK FORCE (EDPITAF)
PROJECT MANAGEMENT UNIT
NAS, PSC COMPLEX, ULTRA, Meralco Ave., Pasig City, Philippines
21 March 1994 to 30 January 1995
A. DUTIES & RESPONSIBILITIES
1. Philippine Government Representative for foreign funded projects by The Japanese Government thru The Japanese International Community Agency (JICA)
2. Review construction documents (Plans, specifications, shop drawings and materials sample submittals) for the purpose of coordination and consistency of requirements and conditions. Any conflict or discrepancies in the construction documents shall be brought to the attention of those concerned for clarification and/or decision.
3. Travel regularly to different schools nationwide to observe work in progress to assure compliance with the approved plans, shop drawings and specifications.
4. Conduct such conference and regular construction coordination meetings among contractors and sub-contractors to maintain schedule and clarity any matter in dispute
5. Check and evaluate applications of progress payment for endorsement.
6. Prepare travel reports concerning project status and accomplishment.
7. Coordinate with Department of Education (Dep. Ed.) officials and representatives regarding project implementation
B. PROJECTS HANDLED :
1. Name of Project : PHASE 1 - EDUCATIONAL FACILITIES IMPROVEMENT
PROJECT ( E.F.I.P. )
Funded : Japanese Government
Implementing Agency : Japanese International Community Agency ( JICA )
Consultant : Morih Architects and Associates, Japan
Owner : Philippine Government
Location : Construction of 30 school buildings for Region IV (10 schools in Palawan,
10 schools in Mindoro, 6 schools in Marinduque and 4 schools in Romblon)
2. Name of Project : PHASE 2 - EDUCATIONAL FACILITIES IMPROVEMENT
PROJECT ( E.F.I.P. )
Funded : Japanese Government
Implementing Agency : Japanese International Community Agency ( JICA )
Consultant : Morih Architects and Associates, Japan
Owner : Philippine Government
Location : Construction of 120 school buildings for Regions V, XI, XII & ARMM
VI. ENGINEER I (Resident Civil Engineer) – Construction Division
NORTH MANILA ENGINEERING DISTRICT
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
CONSTRUCTION DIVISION
Nagtahan St., Sampaloc, Manila
01September 1987 to January 1993
A. DUTIES & RESPONSIBILITIES
1. Philippine Government representative for National Capital Region Projects (NCR-North) from start to finish.
2. Review construction documents (Plans, specifications, shop drawings and materials sample submittals) for the purpose of coordination and consistency of requirements and conditions. Any conflict or discrepancies in the construction documents shall be brought to the attention of those concerned for clarification and/or decision.
3. Prepares estimate and overall program of work to be undertaken during the construction phase in close coordination with the general and trade contractors.
4. Observe work in progress to assure compliance with the approved plans, drawings and specifications.
5. See to it that manpower, equipments and materials of the contractor are adequate for the work and within schedule.
6. Review estimates as construction proceeds and as required to incorporate approved changes as they occur.
7. Check and evaluate applications of progress payment for endorsement.
B. PROJECTS HANDLED :
1. Name of Project : CONSTRUCTION OF THREE (3) STOREY SCHOOL BUILDING
FOR P. BURGOS ELEM. SCHOOL
Location : Altura St., Sta. Mesa, Manila, Philippines
2. Name of Project : CONCRETING OF SOBRIEDAD STREET WITH DRAINAGE
Location : Sobriedad St., Sampaloc, Manila, Philippines
3. Name of Project : CONSTRUCTION OF FOUR (4) STOREY BUILDING
FOR LOPEZ JAENA ELEM. SCHOOL
Location : Matimyas St., Sampaloc, Manila, Philippines
4. Name of Project : CONCRETING OF M. DELA FUENTE STREET
Location : M. Dela Fuente St., Sampaloc, Manila, Philippines
5. Name of Project : ASPHALTING OF FELIX HUERTAS STREET WITH DRAINAGE
Location : Felix Huertas St., Sta. Cruz, Manila, Philippines
6. Name of Project : CONCRETING OF ALVAREZ STREET WITH DRAINAGE
Location : Alvarez St., Sta. Cruz, Manila
Training & Seminar Attended :
1. Title : Construction Safety Seminar
Sponsored/Conducted : RN Ferrer & Associates, Inc.
Venue : RN Ferrer & Associates, Inc. Field Office @ Webforge Phils, Inc. Plant Project
Date : 11 February 1997
2. Title : CPE Seminar “Civil Engineer in the Midst of Crisis Meeting the Challenges”
Sponsored : Philippine Institute of Civil Engineers - Quezon City
Venue : NIA Auditorium, NIA Eng’g Center, Edsa, Quezon City
Date : March 5-6, 1997
Topics :
1. Building Foundation, Exploration and Analysis
2. Grouting, Compaction, Remediation and Testing
3. Geosynthetics for Soil Improvement and Erosion Control
4. Geotextiles in Filtration & Drainage w/ Emphasis on Sanitary Landfill
5. Geosynthetics on Road Construction and Coastal Protection
6. Geosynthetics on Soil Reinforcement and Testing Procedures
7. Bridge Design and Structural Analysis
8. Overview of Road Design and Construction
9. Highway Engineering
10. Road Construction and Project Management
11. Drainage Design and Construction
3. Title : Analytical Project Control (The Project Management Toolbox)
Sponsor : RN Ferrer & Associates
Venue : RNFA 5/F Padilla Bldg. Emerald Ave., Ortigas Center, Pasig City, Philippines
Date : September 11, 2005
Skills :
Knowledge in Computer Softwares : Windows Application, Microsoft, Excel, Timeline, Powerpoint & Auto CADD
Driving : Non-professional Driver’s License
Personal :
Status : Single Sex : Male
Height : 5’3” Weight : 155 lbs.
Citizenship : Filipino Health : Excellent
Place of Birth : Cotabato City
Language Spoken : English, Filipino, Chavacano, Bisaya, and Ilonggo
Education :
SCHOOL DEGREE EARNED DATE ATTENDED
Vilo Elementary School - Cotabato City Elementary 1971 - 1977
Notre Dame of Cotabato Boys’ Dept. High School 1977 - 1981
Notre Dame University - Cotabato City B. S. C. E. 1981 - 1986
Exam Taken :
Professional Civil Engineers Licensure Examination
Date : November 1988
Rating : Passed
PRC License No. : 0055920
Government Career Civil Service Professional Examination
Date : August 1987
Rating : Passed