Post Job Free

Resume

Sign in

Engineer Engineering

Location:
Calgary, AB, Canada
Posted:
October 16, 2020

Contact this candidate

Resume:

Naima Javine

****, *** ** *.*. Calgary, AB, Canada, T2V1G2 Cell :403-***-**** E.Mail: adg1hv@r.postjobfree.com Career Objective: Project controls / Planner /Cost engineer Career High Lights :

** ***** ****essional experience as a planner /scheduler/cost engineer in oil, gas, petrochemical, mining and heavy industrial E.P.C.M projects. Significant experience in planning/cost control of construction and engineering projects in oil refineries, petrochemical plants, pipeline and other industrial / manufacturing projects.

Education:

B.S. Industrial Engineering. Amirkabir University of Technology.Tehran.1989 SAIT (Southern Alberta Institute of Technology, Alberta, Canada): Engineering Economy, Financial planning and control

Employment History:

1 - Project Control Consulting – PCS Ltd (Nov 2005 – Continues) Various project control jobs as project control lead / planner / cost engineer in:

- Husky Energy - Worked as a senior planner / advisor in various projects (Mar 15 – Continues)

- Fluor Canada - Worked as a senior planner in Kitimat LNG project with CHEVRON(Jul 2013 – Jul 2014) and Sunrise Gas plant with Encana ( Aug 2014 – Feb 2015)

- Jacobs Canada – Worked as a senior planner in various projects with Atabasca oil sands /Nova Chemicals ( Nov 2011 – Jun 2013)

- Husky Energy – Sunrise oil sands project - worked as project control engineer in bid evaluation execution phase /Commissioning team of Sunrise 1 project ( Jun 2010 – Oct 2011)

- Jacobs Canada – Carmon Creek project with Shell, worked as senior planner/scheduler to develop engineering define phase schedule, also assisted client in preparation of different EPC schedule scenarios ( different production capacities ) for the overall project ( Jun 08 – Nov 09)

- Petro Canada / Colt - Medicine Hat shallow gas drilling / distribution pipeline project. Worked as planner to prepare gas wells drilling/completion schedule also had the position of lead planner for Sullivan development field gas processing facility and pipeline project (Mar 07- May 08)

- Fluor Canada – ULSG (ultra low sulfur gasoline) project in Irving oil St.John refinery (operating plant) worked as planner to prepare & monitor turn around & overhaul schedules (Jul 06 – Feb 07)

- AMEC - Uranium mine development with Cameco, worked as cost engineer to establish a cost control system for project, assisting client for audit (Nov 05 – Jun 06). 2 - Fluor Canada (Jul 2000 – Oct 2005)

Planner / Scheduler

Planned/updated detailed engineering and procurement schedules, monitored progress, developed and monitored schedule links with construction schedule at site in:

• ULSD (Ultra Low Sulfur Diesel) projects, Refinery upgrades in US . Client: Sunoco

• Hydrocracker unit (Long Lake Up grader Project) in Alberta. Client: OPTI Planned /scheduled up grading and expansion projects, unit maintenance, system or equipment overhaul activities in Irving Oil Refinery Saint John –NB Cost engineer: prepared / controlled cost reports and cash flow diagrams, participated in preparation of detailed estimate, analyzed budget and change orders, following up trends of commitment, incurred and expended cost for major equipment /bulks/labors/subcontracts, prepared cash flow and updated the forecast cost for project, prepared and evaluated projects’ trends and their effects on project total cost for:

- Shell Atabasca oil sand development project - Fort Saskatchewan –Alberta-Canada

- UE-1(Up grader Expansion) of existing refinery facility –Fort McMurray –Alberta- Canada 3-Delta Hudson Engineering Ltd (Jul 1998-Jul 2000) Planning engineer: planned / updated / monitored C.P.M network for Auxsable gas extraction plant (E.P project – Chicago –USA). Scheduled detailed engineering and procurement activities and established a link between EP &C portion of schedule in Primavera with construction group at site. Prepared monthly reports. Controlled projects’ trends and evaluated changes’ effects on project schedule and cost. 4-Oil Industries Engineering /Construction Company (Oct1994- Mar 98)

- Project proposal engineer: prepared project schedule/cost for a EPCM oil refinery development proposal (Joint venture SHINWA .CO of South Korea), studied and analyzed project cost, negotiated and finalized joint venture agreement.

- Planning engineer: designed a C.P.M network for 250,000 BPCD oil refinery construction project

(Distillation units and feed pipelines -Bandar Abbass oil refinery – Iran). Scheduled of construction activities, manpower and construction equipment requirements on a monthly and weekly basis. Updated schedules. Controlled the project and prepared monthly, weekly and daily reports. Assisted contract / invoicing and material departments. Trained staff in planning and data collecting procedures.

- Planning engineer: designed a C.P.M network for construction of Urea plant (Khorasan petrochemical complex - Iran). Scheduled and controlled construction activities, manpower and equipment. Prepared project progress reports.

5-Bandar Imam Petrochemical Complex (B.I.P.C) (Feb1992 – Oct1994) Planning engineer: controlled / supervised construction activities of DC – VC – PVC plants in B.I.P.C reconstruction project as client’s superintendent. Controlled man power and cost of the project. Prepared project’s cost and progress reports, participated in Weekly, Monthly management meetings and presented the figures and updated project status.

6-Jahanroo CO. (Kawasaki Industries) & other various projects (Sep1989 – Feb1992) Production engineer /Site Supervisor: coordinated the design and installation of assembly lines and workstations of production lines. Material and warehouse planning /management, time studying and commissioning of assembly lines as a production engineer. Computer skills: Expert in using planning and control software (Primavera P5, P6 / MS project), MS Office and other cost control packages. / Primavera scheduling courses. References: Available upon request.



Contact this candidate