Post Job Free
Sign in

Engineer Power Plant

Location:
Jeddah, Makkah, Saudi Arabia
Posted:
September 07, 2020

Contact this candidate

Resume:

A B D U L Q A D E E R

House # ****-D

Ghulam Muhammad Abad Faisal Abad Pakistan

Cell: +966*********

+966*********

Email *****@*****.***

Personal Detail

S/O Nazir Ahmed

D.O.B 14th Sep 1974

Passport # AG442388-3

N.I.C # 33100-0886388-3

Nationality Pakistani

Marital Status Married

Religion Islam

Education

Associate Engineer Mechanical Matriculation

Pak Engineering College of Faisalabad Govt. M. C High School, Faisalabad 1995 1992

1st Division 1st Division

COMPUTER LITERACY

Primavera - P6, MS Project, MS Office

Personal Statement

I would like to perform under challenging situations and in an utmost professional atmosphere and set standards of Quality for my work that results from committed and control work strategies and teamwork.

Profile.

24 years of diversified exposure in Mechanical & Civil works project planning small and heavy manufacturing, execution, turn-around, shutdown even in live plants, heavy lifts and dismantling and re-installation. Hundreds of thousands of piping dia inches and tens of thousands of Tons of all types of steel structure and equipment were involved in most of these industrial units of international significance and repute, located in Pakistan, UAE, QATAR, KSA, Oman. Airport Project (OMAN) Oil & Gas Plant (Pakistan)

Fertilizer Plant (QATAR) Ammonia Plant (Pakistan)

Gas Plant (GTL) (QATAR) Cement Plant (Pakistan)

Chemical Plant (PP & PDH) (K.S.A) Industrial Projects (Pakistan) Chemical Plant (PP & PDH) (U.A.E) Building projects (Pakistan) Shutdown in live plant (U.A.E) Power project (Pakistan) Over all working based on Primavera (P3 & P6). Preparation of Level – 4 Plan in Primavera Planning and Scheduling of Mechanical / Civil Projects. Preparation of daily and weekly schedule based on 4 week and 3 month look ahead Plans. Preparation of daily, weekly, and monthly target to the discipline wise. Roll up area wise Plan on weekly and monthly basis to regenerate the forward planning. Preparation plan of daily Job on supervisor level as per the work front availability. Monitoring and analysis various aspects of progress of all activity on daily basis with implementation of Daily Schedule Time Sheet. Preparation of discipline wise progress, S-Curves and manpower histograms. Preparation of project Budget for cost controlling. Preparation the overall material consolidation through the system and provide the information to discipline wise. Preparation of bill of quantity and Entry in project monitoring systems. Preparation of Extra Work all the discipline wise. Co-ordination all the matter of invoicing of discipline. Co-ordination arrangement of material as per construction plans and site requirement.

Working History

Mohammad A. Farhat Co. (FMC) (Saudi Arabia)

Head Office (Jeddha)

Working as Planning Engineer.

(From June - Nov - 2019 ~ Todate)

AL HIFTHI Engineering (Saudi Arabia)

Head Office (Jeddha)

Worked as Incharge Planning.

(From June - Jun-2019 ~ Oct - 2019)

FAUZ ENGINEERING Ltd (From June - 2015 ~ Nov - 2017) 1230MW RLNG Based Combined Cycle Power Plant at Haveli Bahadur Shah, Jhang. Worked as SIte Manager.

Unilever Project (Qila Star Sahah Sahakupura)

Worked as Incharge Planning / Construction Manager. Preparation of daily and weekly schedule based on 4 week and 3 month look ahead Plans.

Monitoring and analysis various aspects of progress of all activity on daily basis with implementation of Daily Schedule Time Sheet/ Progress Sheet. Preparation of discipline wise progress, S-Curves and manpower histograms. Preparation of Project Budget for cost controlling. Extra Work all the discipline wise. Co-ordination all the matter of invoicing of discipline.

Co-ordination arrangement of material as per construction plans and site requirement. Head Office Lahore.

Worked as Incharge Proposal / Planning.

Preparation & Monitoring of ongoing Project Budget for cost. Preparation of daily and weekly schedule based on 4 week and 3 month look ahead Plans.

Monitoring and analysis various aspects of progress of all activity on daily basis with implementation of Daily Schedule Time Sheet/ Progress Sheet. Preparation of discipline wise progress, S-Curves and manpower histograms. Extra Work all the discipline wise. Co-ordination all the matter of invoicing of discipline.

Co-ordination arrangement of material as per construction plans and site requirement ENGINEERING KINETICS Ltd

ATTOCK REFNERY LIMITED (Rawalpindi - PAKISTAN)

Worked as Incharge Planning

From Nov - 2014 ~ May - 15

ETIMAAD Qatar L.L.c

Etimaad Head Office (Doha Qatar)

Worked as Proposal Engineer

From June 2014 to Oct 2014

Ibn Khaldun. Almadaen Engineering Consultants

AL DUQAM AIRPORT PROJECT (OMAN)

Worked as Planner

From May - 2012 ~ to Oct - 2013

ENGINEERING KINETICS Ltd

IBRAHIM FIBER LIMITED (Shah Kot - PAKISTAN)

Worked as Incharge Planning

From Dec - 2010 ~ May - 2012

ETIMAAD Engineering (From May 2008 to August 2010) QAFCO FERTILIZER SHUT-DOWN (QATAR)

Worked as Planning Engineer

July 2010 to August 2010

Etimaad Head Office (Doha Qatar)

Worked as Proposal Engineer

March 2010 to June 2010

PEARL SHELL GTL PROJECT (QATAR)

Worked as Planning Engineer

June 2009 to Sep 2009

Ras Laffan Olefin Project (QATAR)

Worked as Planning Engineer

Jan 2009 to June 2009

BAlloki 225 MW Power House (Pakistan)

Worked as Planning Engineer

May 2008 to Jan-2009

Descon Engineering (From Jan 1996 to April 2008)

Al - Waha (PP/PDH) Plant Sahara AL-JUBAIL (Saudi Arabia) Worked as Planning Engineer

July 2007 to April 2008

BOROUGE SHUT-DOWN AL-RUWAIS ABU-DHABI (U.A.E)

Worked as Area Planner

Nov 2006 to February 2007

TAKREER-RUWAIS REFINERY SHUT-DOWN AL-RUWAIS ABU-DHABI (U.A.E) Worked as Area Planner

August 2006 to November 2006

MAPLE LEAF CEMENT PROJECT (PAKISTAN).

Worked as Planner / Scheduler

May 2005 to August 2006

GURGURI GAS PLANT - KOHAT (PAKISTAN).

Worked as Planner / Scheduler

August 2004 to May 2005

GASCO SHUT-DOWN HABSHAN ABU-DHABI (U.A.E).

Worked as Area Planner

Feb 2004 to March 2004.

PAKISTAN HOUSING PROJECT LAHORE (PAKISTAN).

Worked as Planner (Civil)

July 2002 to Jan 2004.

MOTORWAY (ISLAMABAD-PESHWAR_MOTORWAYP ROJECT (PAKISTAN). Worked as Area Planner

May 2000 to Jun 2002.

BOROUGE POLYETHYLENE RUWAIS ABU-DHABI (U.A.E).

Worked as Area Planner

Feb 2000 to May 2000.

MOTORWAY (ISLAMABAD-PESHWAR_MOTORWAY PROJECT (PAKISTAN). Worked as Area Planner

May 1999 to January 2000.

ATTOCK OIL REFINERY EXPANSION PROJECT RAWAL PINDI (PAKISTAN). Worked as Area Planner

September 1998 to May 1999.

PAKISTAN PETROLEUM LIMITED SHUT-DOWN SUI BLOCHISTAN (PAKISTAN). Worked as Planning Asstt

March 1997 to June 1997.

LUCKY CEMENT PROJECT LUCKY MARVAT (PAKISTAN).

Worked as Planning Asstt

1996 to March 1997.



Contact this candidate