Post Job Free
Sign in

5 years 6 Months of Project and Maintenance experience in the industry

Location:
India
Salary:
Negotiable
Posted:
September 04, 2020

Contact this candidate

Resume:

RAHUL GHANASHYAM SAVANT, BE (Mechanical)

“Vithoba Niwas”, H.No.3281/2, Devatishitta Road, Post: Nandangadda, Baad, Karwar, Karnataka,581304

+91-816******* *************@*****.*** https://www.linkedin.com/in/rahul-savant-13a1769b/ Profile Summary

• Experienced in project management activities for various Underground EHV cables erection projects.

• Experienced in all phases of project life cycle such as project initiation, project planning, execution, control, project close outs, resource management, and risk mitigation.

• Developing Project billing Purchase orders, Minutes of meeting, Status reports, Cost estimates, Project reviews, Project documents, Timeline sheets, Logistical planning, and Coordination.

• Proficient in Microsoft Office applications Word, Excel, PowerPoint, MS Outlook, SAP Basis and AutoCAD.

• Skilled, Dedicated, Reliable and Qualified Mechanical Engineer with technical experience in Identifying, troubleshooting, repairing, and maintaining of large variety of Mechanical Equipment’s.

• Excellent Communication skills with good leadership quality, strong interpersonal skills, interface effectively with coworkers, management, clients, subordinates, juniors, and seniors. Excel in unpredictable and hectic environment.

Skills

Organizational Experience

Sterlite Power Transmission Limited, New Delhi Apr’19 – Till Date Designation: Assistant Manager (Projects)

• Responsible to create and maintain reports that allow the company to get information on daily Project/business activities. Also analyze company performance details quarterly and half yearly. To meet the management on a weekly basis to ensure that uniform information is available across the company. To keep records and information about deals with all the stakeholders.

• Monitor all project activities, expenditures, and progress towards achieving the project output.

• Develop and strengthen monitoring, inspection, and evaluation procedures.

• Develop monitoring and impact indicator for the project success.

• Monitor and evaluate overall progress on achievement of results.

• Provide feedback to the Project Manager on project strategies and activities.

• Carryout WBS Creation, PR, SES and GRN in SAP Basis for leading Vendor Cost management.

• Suggest strategies to the Management for improving the efficiency and effectiveness of the project by identifying bottlenecks in completing project activities and developing plans to minimize or eliminate such bottlenecks

• Report weekly, monthly, quarterly, half-yearly and annual progress on all project activities to the Project Head.

• Preparing cable route maps by surveying and all civil drawings on AutoCAD as per client requirement.

• Conducting Route Survey and preparing all survey related documents for the Tender bidding.

• Project Management • Detailed Engineering • Project Planning

• Scheduling • Client Management • AutoCAD

• Resource Management • Time Management • Commissioning

• SAP Basis

• Vendor Management

• Predictive Maintenance

• Project Engineering

• Project Billing

• Corrective Maintenance

• MS Office

• Mechanical Maintenance

• Preventive Maintenance

Sterlite Power Transmission Limited, New Delhi Jan’17 – Mar’19 Designation: Project Engineer

• Managing complete Site Execution team for activity as assigned by Project Manager and to get required approval from client for day to day Execution.

• Understanding Safety & Quality requirement and to ensure Zero tolerance in Execution on safety and Quality.

• To work across various activity vertical to facilitate succeeding activity starts and finishes in time.

• Developing Activity wise Execution Schedule and giving activity wise resource requirement to Project Manager for meeting Execution schedule.

• Extensive involvement with client, other verticals of Project, store, and Channel Partners.

• Ability to think in innovative way to meet Activity deadline.

• Passion and energy around building strong Safety and Quality Culture on site.

• Ability to work and align with other teams and Channel partners to implement Schedule in the best possible way.

• Generation of Activity MIS and reporting to Project manager on day to day basis for any changed requirement and deviation.

• Preparing cable route maps by surveying and all civil drawings on AutoCAD as per client requirement.

Sterlite Power Transmission Limited, Silvassa Feb’15 – Jan’17 Designation: Engineer (Maintenance)

• Planning of Preventive, Corrective & Routine Maintenance.

• Planning of modification in plant machineries to reduce the Breakdown %.

• Maintenance of Rod Break Drawing machine (RBD), Rigid stranding machine (RST), Tubular, Skip, Spooling Section.

• Maintaining data of breakdowns, preventive maintenance through SAP.

• Maintenance of Compressors and all utility equipment’s.

• Maintenance of all types of Gear Box and Rotating Equipment’s.

• Establishes and monitors programs for critical equipment analysis and condition monitoring techniques equipment like centrifugal pumps, reciprocating and screw type air compressors.

• Reviews deficiencies noted during corrective maintenance

• Maintains and advises on the use and disposition of stock items, surplus items, and rental equipment.

• Develops standards for major maintenance overhauls.

• Provides technical guidance for the preventive and predictive maintenance programs.

• Maintenance (Breakdown, PM) of hydraulic Machines.

• 100% Schedule Adherence for Preventive & Predictive Maintenance for all the Equipment. Projects Undertaken

• Undertaken and completed Project of Laying, testing, and commissioning of 66kV 3C X 300Sqmm cables as per required accessories as per scope of work for DMRC, New Delhi from Dhaula Kuan RSS to INA RSS & its jointing and termination. (Client: Siemens ltd, Delhi Metro Rail Corporation Ltd).

• Undertaken and completed Project of Laying, testing, and commissioning of 33kV 3C X 400Sqmm Cable for BSES Yamuna limited of Infeed from 220 KV Preet Vihar to 33 kV Preet Vihar Grid and CBD-1 Grid & its jointing and termination. (Client: BSES Yamuna Power limited).

• Undertaken and completed Project of Laying, testing, and commissioning of 33kV 3C X400Sqmm Cable for BSES Yamuna limited of Lilo of 33 KV circuit from Shakarpur– Guru Angad Nagar by New 33 kV feeder from 220 kV Preet Vihar grid & its jointing and termination.(Client: BSES Yamuna Power limited).

• Undertaken and completed Project of Laying, testing, and commissioning of 66kV 3C X 1000Sqmm Cable as per required accessories from 220kv PPG grid to 66kv Akshardham Grid. (Client: BSES Yamuna Power limited)

• Undertaken the project of cable laying, testing, and commissioning of 132kv 1C x1000 Sq.mm cable as per required accessories from Manakapur grid to Morris ground grid. (Client: Sterling & Wilson, NMRCL).

• Solar Powered Evaporative Air Conditioning System: It works on Psychometric principle where the air conditioning unit consist of three components such as desiccant wheel with desiccant material as silica gel, indirect evaporative cooling System & Heat exchanger. This Air Conditioning system works without the usage of refrigerant & consumes just 100 Watts of power to run the system. (Academic). Achievements and Certifications

• Project Management Foundations, LinkedIn Learning Aug 2020

• Received Achievers Award for Best performance in NMRCL project, Nagpur.

• The Solar Powered Evaporative Air Conditioning System Project was selected & sponsored by Karnataka State Council for Science & Technology.

• The Solar Powered Evaporative Air Conditioning System Project was also awarded by ISSRD for ESIC 2014 Event.

Education

• Bachelor of Mechanical Engineering 72.78% Aug 2010 - May 2014

• University: Visvesvaraya Technological University, Belgaum, Karnataka.

• Institute: KLS`s Vishwanath Rao Deshpande Rural Institute of Technology, Haliyal, Karnataka

• HSC 72.16% Jun 2008 - May 2010

• Board: Department of Pre-University Education, Karnataka.

• Institute: Govt. Pre-University College, Karwar, Karnataka

• SSC 86.88% Jun 2007 - May 2008

• Board: Karnataka Secondary Education Examination Board

• Institute: Bal Mandir High School, Karwar, Karnataka



Contact this candidate