CURRICULUM VITAE
OF
JAMIE CASLYN BANGER
PERSONAL DETAILS:
Surname: Banger
Names: Jamie Caslyn
Date of Birth: 06/12/1989
Citizenship: South African
Languages: Bilingual (Afrikaans & English)
Marital Status: Married
Health: Good
Dependants: One (Keithan Banger)
Email Address: *****************@*****.***
I’ve got a very energetic nature and can work under pressure. I enjoy a challenge especially if I know I can accomplish the task first time around. I’m Computer literate and love working with people. At home I’m the only bread winner as my Mother is a pensioner and my Father just recently passed on. I’m willing to be an asset to a company that can offer growth within my Artisan career.
Contact Numbers: 079-***-****
Address: 27 Lemon Avenue
Alra Park
Nigel
Gauteng
1491
EDUCATION:
Secondary School: Alra Park Secondary (Nigel)
Highest Grade Passed: Matric (Grade 12)
Year: 2007
QUALIFICATIONS: Matric (2007)
Category 5 Piping Certificate (2013)
EMPLOYMENT HISTORY: Contract
Organisation: Machine Moving & Engineering
Position: Semi-Skilled Pipe/Mechanical Fitter (not limited to Rigging/Tackling)
Site: Distel (Walkerville),Nestle (Pomona),Henkel (Alrode),
Bevcan (Nuffield)
Duration: November 2008 to September2010
Contact Person: Benny (082-***-****)
Reason For Leaving End Of Contract
Project
Organisation: P&S Projects (Consol Nigel &Wade Ville)
Position: Mechanical/Pipe Fitter (not limited to Semi Skilled Boilermaker)
Site: Consol (Nigel & Germiston/Wadeville)
Duration: March 2011 to January 2013
Contact Person: Phillip (082-***-****)
Reason For Leaving End Of Contract
Contract/G.O’s/Tube leaks/Project
Organisation: Lapace Construction
Position: Pipe Fitter (not limited to Stick Welding Tacker)
Site: Hendrina PowerStation
Grootvlei PowerStation
Matla PowerStation
Alrode Petrol Depot
Botash Botswana (Salt mine and Refinery)
BCL Botwana Mine
Duration: March 2013 to October 2015
Contact Person: Dupi (082-***-****)
Reason For Leaving End Of Contract
Shut Down
Organisation: SNS Engineering
Position: Pipe Fitter (not limited to Mechanical Fitting, Boilermaking
and Tacking)
Site: Nissan (Rosslyn PTA)
BMW (Rosslyn PTA)
Duration: May 2016 to July 2016
Contact Person: Styne (061-***-****)
Reason For Leaving End Of Contract
Shut Down
Organisation: Rotec Roshcon
Position: Pipe Fitter / Mechanical Fitter (not limited to Mechanical Fitting, ` Boilermaking and Tacking)
Site: Eskom Rotec (Rosherville Germiston)
Duration: November 2016 to January 2017
Contact Person: Theo (083-***-****)
Reason For Leaving End Of Contract
Contract
Organisation: Brando Steel & Construction
Position: Pipe Fitter / Mechanical Fitter
Site: Nigel Workshop (Vosterskroon)
Duration: January 2017 to July 2017
Contact Person: Marcus (063-***-****)
Reason For Leaving End Of Contract
Contract
Organisation: Fabricon (Petrol Depo)
Position: Pipefitter / Mechanical Fitter
Site: TP2 (Jameson Park)
Duration: July 2017 to November 2017
Contact Person: Wayne Jacobs (072-***-****)
Reason For Leaving End Of Contract
Contract
Organisation: Impala Platinum Refinary
Position: Pipefitter / Boilermaker
Site: Impala Platinum Refinary (Springs)
Duration: November 2017 to Present
Contact Person: Shahbaz (084-***-****)
Project
Organisation: Brandco PTY/ LTD
Position: Pipefitter
Site: In 2 Foods (Bonaero Park)
Duration: July 2018 to December 2018
Contact Person: Zonke (073-***-****)