RESUME
JAVID BASHA. H
th
Street, K.K Nagar, Nanganallur, Chennai – 600114
Ph.: 908-***-**** / 784-***-****
Mail: ************@*****.***
OBJECTIVE
To work in competitive and challenging environment so as to enhance my technical & personal attributes and to implement efficient working methods for the betterment of organization and thus to deliver tangible value to my employer. AREAS OF EXPERTISE
Time Study – Motion Study – Method Study – 5S – Kaizen – Manpower Planning – Efficiency Estimation – Cost Reduction – TIMWOOD Elimination
PROFESSIONAL EXPERIENCE
INDUSTRIAL ENGINEER
CONSOLIDATED FOOTWEAR AND GARMENTS PVT. LTD
(VMS SHOES PVT. LTD). (TATA INTERNATIONAL LTD) (Oct 2017-Till date) CHENNAI MANAGEMENT SERVICES PVT. LTD. (TATA INTERNATIONAL LTD)
(June 2015-Oct 2017)
Roles & Responsibilities:
Perform time study and develop the standard time for each and every style by using SATRA TIMELINE 2 Software.
Ensuring work load balancing based on TAKT time across the production line in order to meet the daily production target.
Responsible for increasing productivity through reduction of Non value added activity in the production process.
Monitoring equipment downtime and Pairs losses and implementing corrective and preventive procedures actions.
Organizing weekly 4M meeting with Manages/Supervisors/Key operators to improve performance level of the unit.
Creating performance driven metrics and maintain the trend analysis to ensure effectiveness of process improvement implementation and quantifies the improvements.
Improving Labor productivity through reduction of cycle time reduction & Method improvements.
Providing daily & Monthly basis manpower planning across all the department for manpower forecasting.
Facilitating continuous improvement by collaborating with production workers to understand and document their ideas and suggestions.
Trained all the Supervisors and Managers in Continuous Improvement process and involved them in Kaizen and 5S activities.
Achievements:
Tray packing system
Implemented tray System to pack the upper goods instead of using polythene covers. Cost savings: 7 Lacs/Annum
Prefitting optimization
Material traveling distance
Before(Ft) After(Ft) Saving(Ft) Benefit
531.5
353
178.5
18%
Production improved
Production line optimization
2 Pairs charging system
Charging WIP MP productivity
Throughput
time(Hrs.)
4 pair 656 78 1.35 4.56
2 pair 328 74 1.52 2.73
Savings:
WIP reduction 328 Pairs (50%)
Manpower: 4
Productivity improved (13%)
Throughput time reduction 1.82 Hrs. (40% )
Lead time reduction through Online AQL project
Before online AQL
Lead time for AQL
alone(days)
Manpower/Line
9.52 23
After online AQL
Lead time for online
AQL(days)
Manpower/Line
2.33 19
Savings:
Manpower: 4
Lead time reduction 7.19 days (75% )
EDUCATION:
B.E Mechanical engineering (2011 -15)
University College of Engineering, Kanchipuram (ANNA UNIVERSITY) SOFTWARE SKILLS:
SATRA timeline 2, MS Word, EXCEL, Power point.
PERSONAL STRENGTH:
Maintain coordinal relationship with all level of organization Quick learner
Sincere and honest towards the job assigned to me
PERSONAL DETAILS:
Father Name: Hassen Basha .K
Date of Birth: 15-Jul-1993
Languages Known: Tamil, English, Hindi, and Urdu
Marital Status: Single
Nationality: Indian
DECLARATION
I hereby declare that the above mentioned particulars are true to the best of my knowledge and belief. PLACE: Chennai Yours truly
(JAVID BASHA .H)