Post Job Free

Resume

Sign in

Power Plant Manager

Location:
Indore, Madhya Pradesh, India
Posted:
August 30, 2020

Contact this candidate

Resume:

CURRICULUM-VITAE

VIKAS KUMAR TIWARI (B.E. MECH.)

E-mail:-adfoth@r.postjobfree.com

Contact No:-+91-787*******

Add- Village- Ghurehata,ParahaunTola,P.O.- Mauganj,Disti- Rewa, Madhya Pradesh,India.

CAREER OBJECTIVE:

To work in an organization that offers best opportunities to utilize my skills and potentials and contribute to the growth of the company, by seeking new challenge in the field of POWER PLANT OPERATION & MAINTENANCE.

TOTAL WORK EXPERIENCE: 10 years

QUALIFICATION:

Bachelor of Engineering (Mechanical) From S.I.S.T, Bhopal – RGPV University Bhopal (M.P.) with 70.96% aggregate in June-2010.

12th examination passed from Board of Secondary Education CGwith 67.7%.

10th examination passed from Board of Secondary Education MP with 69.9%.

SKILL SUMMARY:

•A self-motivated, quick learner & a team leader, willing to learn and adapt to new challenges of Industry.

•Enriched with the ability to learn new concepts & technology within a short span of time.

•In-depth understanding of the Power Plant Operation.

•Good working knowledge in changing technologies to meet new requirements successfully with a systematic and organized approach for increased efficiency and competence.

•Strong leadership traits with the ability to coordinate with different people at one time under difficult situations and bring out the best in others while creating a healthy and friendly work environment.

WORK EXPERIENCE:

CURRENT PROFILE:

Since June14, 2012 to till date, working with KJS CEMENT LTD,Maihar, as Asst.Manager Operation at CPP,KJS CEMENT LTD is one of the largest cement production company in M.P,with 6000 TPD kiln and 27 MW CPP,

The plant configuration consists of:

Boiler - 120 TPH, A.F.B.C.WATER TUBE BOILER

Make - Thermax ltd.

Turbine - 1 X 27 MW Steam extraction air cooled condensing turbine.

Make - Siemens India Limited

D.C.S. - A.B.B

WTP - 10 m3/hr., (Thermax make)

Air Compressor - 3 x 13 m3/min & 2 x 9.2 m3/m.(Ingersoll Rand make)

Cooling Tower - 1x 160m3 (Paharpur make)

Generator - TDPS

CHP - 1x150 TPH, (TECPRO make)

RESPONSIBILITY:OPERATION DEPARTMENT

Experience in the field and Desk of Operation ofBoiler & Turbine, Balance of plant and Material handling.

`Well conversant with smooth process of Power plant as a Shift in-charge

Experience in Commissioning activities like Boiler, Turbine, CHP, Cooling Water Pumps and Compressors.

Boiler preparation for (lightup, hotbox up, hot light-up,) shut down, vacuum pulling, turbine rolling up to synchronization with grid. Normal Operation / Load Management and Handling of Various Emergencies during Operation of the Unit. Hands on Experience of operation of boiler, Auxiliaries & turbine through DCS system.

Responsible for commissioning of BOILER and its auxiliariesinclude drainable non drainable `hydro test, alkali boil out, chemical cleaning, boiler light up, pressure test.

Preparation of Daily, Monthly and Annual Report s of Efficiency related parameters. Shift log book check, to understand previous shift operating parameter & check process variation, necessary action take if any process variation occurred.

In shift any problem of instrument,electrical & mechanical maintenance job same problem informed to relevant department.

Proper communication with load center for uninterrupted supply of power.

Co-ordinate with various departments during breakdown / maintenance and took initiatives on modification of processes to increase production efficiency .

Active participation in Efficiency Improving Methods /Cost Reduction Techniques / Safety Activities in the Unit.

Plan resources, arrangement & allocation of resources as per the Plant requirement.

Reporting to the OPERATION MANAGER AND GM-Power Plant for work Status &schedule.

Involved in Documentation activities such as preparation of SOP, Technical Diary, Punch Points, quality related issues & safety measures.

MAINTENACE KNOWLEDGE:

Managing the functions of Maintenance troubleshooting and preventive / predictive/ breakdown maintenance of equipment.

Perform routine checkups, outage work and PM’s. Included in systems like: Air compressor, Cooling Tower, Feed Pumps, Induced Draft and Forced Draft Fans, Cooling Water Pumps, coal handling & ash handling plants.

Perform Root Cause Analysis with excellent written and oral communication skills to resolve technical problems.

Experience in field of pipe line project of mines to reservoir area.

Bed coil replacement — KLS CEMENT MAIHAR -27 mw, R.R.ENERGY RAIGARH— 15 MW

PA Line replacement - KJS CEMENT MAIHAR 27 MW

PREVIOUS EXPERIENCE:

ABHINAV STEEL & POWER LTD, SATHARIYA, U.P:

Boiler- 240 TPH, CFBC, WUXI make China BOILER

Make - Wuxi, China

Turbine - 1 X 60 MW, make Nanzing, China

Make- Nanzing, China

D.C.S. - Emersion SYSTEM

WTP- Ion exchange Make.

CHP-160TPH (BEVCON Make)

AHP -MacawberBeekay

Designation: -Engineer

Work Duration: - Nov.2011 to June 2012.

HIRA GROUP OF COMPANIES, R .R. ENERGY RAIGARH, C.G.

Boiler - 1 X 70 TPH, AFBC boiler, make Thermax Ltd.

Turbine - 1 X 14MW, steam extraction air cooled condensing turbine

D.C.S.- Yokagawa SYSTEM

WTP -Thermax ltd. Make

AHP -MacawberBeekay

Designation: - GET and ENGG.

Work Duration: - June 2010 to Oct. 2011

Industrial Training-

Name of Company /Institute

Place

Duration

Bhilai steel plant.

Bhilai

28 Days

Software Knowledge:

Basic knowledge of SAP, Microsoftexcels and MS Word.

Major project

Project Title: - Automatic Car Parking.

Objective: - To reduces problem of parking through multi car parking.

PERSONAL DETAIL:

Mother’s Name

Mrs.RajwatiTiwari

Father’s Name

Mr.K.P.Tiwari

Date Of Birth

17 March 1989

Address

Vill: Ghurehata,Parahauntola,Post:Mauganj, Dist:Rewa (MP) 486331

Mobile Numbers

078********

Language Known

Hindi, English

Date:

Place: Maihar VIKAS TIWARI



Contact this candidate