SUMMARY OF QUALIFICATIONS
VIKRAM AYYANAR
Information
CORE COMPETENCIES:
Prototype Design and Development (PLM) Cost Estimation Production Planning & Control Quality Management Cross Functional Leadership Purchase & Inventory Control
Production Implementation Troubleshooting Resource Optimization Analytical Skills. COMPUTER PROFICIENCY:
Auto CADD -2013 2D, CATIA V5, Solid Works (Basic), MS-Office 2013; Date of Birth:20.11.1995
Address
S/o D.Ayyanar Door No
4/64,Pillayar Kovil
Street,Melarippattu
,villupuram 605757
Chennai
Tamil Nadu
India
Phone
***********@*****.***
2010
2012
EDUCATION
GOVERNMENT HIGHER SECONDARY SCHOOL
10th 2010, Government Higher Secondary School, 88.82 %. MOUNT PART HIGHER SECONDARY SCHOOL
12th 2012,, Mount part Higher Secondary School 74.58 %. 2016 PMR COLLEGE OF ENGINEERING
B.E, Mechanical Engineering
B.E Mechanical Engineering 2016; PMR College Of
Engineering, 65.33%
EXPERIENCE
03/2019 – present
SRIPERUMBUDUR, TAMIL
NADU
MARVEL MACHINES PVT LTD
New Project coordinate and Design engineer
Design a product as 3D drafting, animation .(CATIA SOLIDWORKS)
Material short out for production
BOM preparation
Cost estimation and Documentation follow up
02/2019 – 02/2019 JBM AUTOMATIVE, MARAIMALAI NAGAR Junior product developer
as a 3D models
And Quality Inspection (contract)
02/2019 – 02/2019 TEMA SOLUTIONS
Developing a Prototype and getting approval from the Client before taking Bulk Manufacturing.
Devoloped a part Design modeling and drafting, simulation analysis
Responding to RFQ for the Customers.
02/2016 – 05/2018
CHENNAI, TAMIL NADU
DYNAMIC AIR ENGINEERING INDIA PVT. LTD
S.S Lavatory Side Wall (LHB Coach)
CHENNAI, (Feb 16 to May 18).
Prepares the tender analysis sheet. Responsible for submitting the tender on time. Monitors and stores the costs to improve the accuracy of future pricing. Checks the estimates or worksheets made by other estimators.
Vendor development, costing & negotiation with suppliers. Engineering Support to Procurement of Materials and Components.
Developing a Prototype and getting approval from the Client before taking Bulk Manufacturing.
Preparing Master Production Schedule (MPS) based on the existing orders. The Material Request Planning (MRP) and Manufacturing Resource Planning (MRP II) will be prepared. Conducting daily review meeting with Production, Quality, Purchase, Supply Chain and Stores department along with contractors to make sure the requested Raw Material and PROJECTS HANDLED
1) STAINLESS STEEL FABRICATED ITEMS
Storage Racks with Adjustable andAluminium Rolling Shutter
(Train-18)
S.S Handhold (MRVC & EMU Coaches)
S.S Tubular Partitions With Honeycomb Sandwich Panels
(Doorway 3-Seater, 2-Seater & Compartment Partition) (MRVC- EMU & DMU Coaches)
S.S Battery Box (MRVC-EMU, DMU& LHB Coaches)
Passenger Seat (3 & 2-Seater Single & Double)(DMU Coach) S.S Nosecone (MRVC & EMU Coaches)
S.S Lavatory Side Wall (LHB Coach)
S.S End Part and End Wall (LHB Coach)
2) DOORS
Stainless Steel Entrance Door (LHB Coach)
Stainless Steel Endwall Sliding Door (LHB Coach)
Stainless Steel HT Compartment Door With and Without Service Door (MRVC & EMU Coaches)
Stainless Steel Driver Cab Door (LHB & CONVENTIONAL Coaches)
Inter Communication Door (LHB & CONVENTIONAL Coaches) Lavatory Door (LHB & CONVENTIONAL Coaches)
Aluminium Sliding Doors (MRVC-EMU& DMU Coaches)
3) ALUMINIUM FABRICATED ITEMS
Normal, Lavatory and Emergency Windows (MRVC-EMU,
DMU, JK & LHB Coaches)
One Coach SetAluminium Vertical Louvers(Engine Room) One Coach Set Grill Arrangements (Power Car Coach) Aluminium Inner Frame For Windows (JK & Normal Coach) SKILLS
Prototype Design
Auto CAD 2D
Catia V5 r20
Solid Works
COST Estimation
COST Reduction
Estimation
Fabrication
Manufacturing Process
Optimization
Sheet Metal
Manufacturing Process