Post Job Free
Sign in

Electrical Engineer Power Plant

Location:
Flora, IL
Posted:
August 25, 2020

Contact this candidate

Resume:

Joey F. Moses

** ******** *****

Flora IL *****

Cell 618-***-****

****@***.***

Senior construction engineering supervisor with over 20 years of experience in project implementation across environmental, nuclear, steel, and power industries. Possesses strong project management skills in management of cost and schedule and for coordination and direction of project personnel. Has proven success by functioning as a key member within a project management team environment for execution of large and complex projects. Has demonstrated leadership in driving performance through application of formal lessons learned process and development of alternate project approaches.

Work History:

January 2005 - Present

Moses Enterprises, Inc.

Real Web Host

Worldwide

Job Classification:

Owner Operator

Duties:

Head of internet company that provided up to 450 purchased/leased dedicated servers to clients for websites both personal and business related.

Worked with Hewlett Packard, Intel, & Cisco

Provided hardware, software, fiber optic networking and security for all our clients. At times we maintained a workforce of 10 plus employees both in the United States and abroad.

February 2002 - 2005

Washington Group International

Monroe NOx Reduction Project - Monroe, Michigan

Detroit Edison Power Plant

Job Classification:

Manager of Field Engineering

Duties:

Liaison between construction and design engineering. Project includes NOx reduction related modifications to Detroit Edison Power Plants across their generating fleet. Total value of projects exceeds $700MM. Project employs over 700 craftsmen on site and 125 staff personnel. Responsible to insure all design engineering from all disciplines is provided on schedule and when needed. Supervised field engineering staff. Resolved field issues to support installation effort. In this role is a part of the core project management team, directly involved in cost estimating, scheduling, and cost control and schedule management. Reports directly to project director of project.

For the Monroe Power Station this project includes design and construction of SCR’s (Selective Catalytic Reduction Units) for each of the four 750MW coal fired power plants. Lead constructability and alternate construction approach development effort for engineering. This effort resulted in a $30MM reduction in project cost and a 3-month improvement in schedule for construction of the Unit-4 SCR at the Monroe Plant.

Worked with client to close out over 300 change orders on the books once arrived on site, was the main go between getting this done for Washington group.

Received over a 30k bonus from Washington group after first year on the project.

November 1998 - Feb 2002 Washington Group International

St. Louis Office

Job Classification: Electrical/Instrument Project & Field Engineer

Duties: Lead design/field electrical engineer on 3 Projects at Granite City Steel.

Projects included 3.9-million-dollar fiber optic system installed plant wide, 29million-dollar redesign of existing Roll Bending system including 2 x-ray systems valued at 5 million, and 7 million dollar de-sulfurization project. Also involved in overhead cranes up to 400-ton voltage up to 69000.

Responsibilities including supervision of field activity design; design review, and scheduling. Supervised up to forty electricians.

December 1997 - Nov 1998 Morrison Knudsen Corporation

Weldon Spring Site

Job Classification: Instrument/Electrical/DCS Programmer

Duties: On site lead for full scale Chemical Solidification/ Stabilization Plant; Distributed Control System (DCS) programming utilizing Intellution 6.15; New and existing instrument & electrical design; Customized/revised procedures as needed.

Project cost control. Supervision over 20 various personnel. Responsible for electrical engineering

estimates and direct communication with sub-contractors.

May 1995 - December 1997 Morrison Knudsen Corporation

Weldon Spring Site

Job Classification:

Instrument/Electrical Project Field Engineer

Duties:

Lead troubleshooter for existing water treatment plants and CSS Pilot System;

Design involving instrument & system selection, procurement, and installation; Designed several PLC programs. Brought in to help make this work from Arkansas.

March 1990 - May 1995:

Morrison Knudsen Corporation

Arkansas Vertac Chemical Superfund Site

Job Classification:

Instrument/Electrical Supervisor

Duties:

Involved in all phases of electrical and instrumentation on site and programming of all computers; Designed DCS program for the thermal destruction unit to achieve a 70% availability.

1986 - 1990

Mechanics Limited Inc., Little Rock, AR

Job Classification:

Instrument/Electrical Supervisor

Projects:

Remington Arms Co., Inc., Lonoke, AR

Stone Container, Jacksonville, AR

Pine Bluff Arsenal, Pine Bluff, AR

Kimberly Clark, Conway, AR

Skill Factory, Walnut Ridge, AR

LTV, Camden, AR

Bennett Paper, St. Louis, MO

Bennett Paper, Somerset, KY

1985 - 1986

Koontz Electric, Morrilton, AR

Job Classification:

Instrument/Electrical Supervisor

Projects:

Morrilton Paper Mill - Duties: Keeping up with control systems and motor control centers; also involved in PLC programming of various systems.

1984 - 1985

Merit Electric, Largo, FL

Job Classification:

Lead Electrician in all phases of electrical service

Projects:

Shopping Mall, West Palm Beach, FL

Movie Theater, Orlando, FL

1981 - 1984

Field Controls, Clearwater, FL

Cogburn Electric, Jacksonville, FL

Job Classification:

Security & Controls

Projects:

Martin Marietta, Orlando, FL

Education:

Fire and Security Alarm Systems

High School

Nemo Vista, Center Ridge, AR

NEC

Code Book Class

ABC

Electrical Course

CPR

Company Trained Class

HAZWOPER

40 Hour Training

HAZWOPER

8 Hour Training

Supervisor

8 Hour Training

Halon Systems

3-Day Training, New Jersey

Dupont

Safety Training

Turnbull

40-Hour Training CTL System

SHARP

WSSRAP

Defensive Driving

WSSRAP

APP Builder

Rochester, New York 40 HOURS

Intellution 6.15

40 Hour Training

Allen Bradley

PLC5, PLC2, PLC3, SLC150, SLC500

License:

State of Arkansas, Master Electrician /Subcontractor

State of Missouri Master Electrician /Subcontractor

Familiar Instruments:

Themox

Taylor

Bailey

Honeywell

Eclipse

Fisher

Delta F

Milltronics

Horiba

Omega

Signet

Maxon Valves

Ashcroft

Radiometrie

K-Flow

Hauch Valves

PMC Beta

Telediane

Magnetrol

Yokogawa

Vitec

Beckman

Greatlakes

Drexelbrook

Pyco

Toledo Bauman

Masolin

Dyamiation

Jamesbury

Rosemount

N. American

Enduser Hauser IMS Foxboro

Ohmart/Vega

Programming Devices:

Seimens Allen Bradley PLC 3 Allen Bradley PLC 5

Allen Bradley SLC 100 Allen Bradley SCL 150 Allen Bradley SLC 500

Allen Bradley Panel View Abbkent Taylor Mitsubishi

Reliance Automate 15E Reliance Automate 30E Paragon 500 “TCS”

Intellution Fix 6.15 Modicon

Computer Literacy:

GE

Windows Autocad

WP 6.0

Quattro Pro

EXCEL Dbase 3

Lotus

Harvard

MS Word Access

MS Project

MS Power Point

References:

William Carr *******@*****.*** *******.****@****.** 575-***-**** (work) 575-***-**** (cell)

Scott Anderson *.**********@*******.*** 509-***-****

Gary & Leslie Byers *******@*******.*** ******@*****.*** 509-***-****

Greg Price Richmond Kentucky

John Enger 314-***-****

Thomas Myer Project Manager at WRPS

Scott Reeder, Tim Beale, Steven Miles, Joe Heitkamp



Contact this candidate