Post Job Free
Sign in

Electrical Engineer Plc

Location:
Qibla, Kuwait City, Kuwait
Salary:
550KD
Posted:
August 21, 2020

Contact this candidate

Resume:

Abdo Elsayed

Electrical Engineer

A highly motivated and creative electrical engineer looking for a management job in electrical projects. I have 6 years experience Preparation to PMP exam, AutoCAD, PLC, motors, generators, management. ***************@*****.*** 99076673

Block 5, Sabhan, Kuwait linkedin.com/in/abdo-elsayed-199004142 WORK EXPERIENCE

control system engineer

Mtc group holding

11/2017 - Present, Kuwait

Establish electrical and mechanical connections and follow up the operation process of 42 Face mask machines at MTC active.

verify and do acceptance tests for pre- assembled and machines.

troubleshooting and solving problems for all machines Develop, and test electrical devices and equipment, including power generators, PLC, VFD, HMI, servo drive, stepper motors all types of motors.

preparing reports as required.

Control panels repairing and final testing, Checking compressor and pneumatic system.

Electrical Engineer

The Egyptian armed forces

05/2015 - 10/2017, Cairo, Egypt

Manufacturing armored cars, CNC, exhaust, radiators. Develop, and test electrical devices and equipment, including power generators, PLC, VFD, HMI, servo drive, stepper motors all types of motors.

Implement electrical control projects to increase

production and achieve the requirements of quality standards.

Control panels repairing and final testing, Checking compressor and pneumatic system.

Read electrical control circuit, design and modify electrical control circuits, Carrying out timely inspection of running machinery.

Implementation sound and camera system for armed cars. EDUCATION

Study Program

Bachelor’s degree in electrical engineer with

a rate very good

09/2009 - 05/2014, Egypt

SKILLS

PLC & HMI programming and configuration responsible Microsoft Office TIA Siemense Adaptable

Teamwork Honest Optimistic Classic control

windows self-motivated

reliability&work under pressure

PERSONAL PROJECTS

Changing the suction system (05/2018 - 07/2018)

We modified the oil suction system for PVC cling film production line to avoid any extension for the product

production line by using plc s7-300 and HMI & VFD

Siemens profibus connection

LANGUAGES

Arabic, English

Full Professional Proficiency

INTERESTS

Graphic design,

Achievements/Tasks

Achievements/Tasks



Contact this candidate