Summary
Innovative, self motivated Planning/Project Controls with more than 7years of cross-cultural experience in EPC of Combined Cycle Power Plants, Thermal Plants, EHV Sub Station, SWRO Projects.
Project Control Management – Having strong knowledge in the project controls in terms of preparing, Monitoring and reporting the project scope and timeline.
Key Results Area
Accomplished professional with 7 years of distinguished
experience in
Site Woks
Project Management
Schedule development
Progress Measurement System
Key Performance Indicators
Proposals / Estimation
Subcontractor Schedule Analysis
Skills
Solid organizational skills, including multitasking and time-management.
Strong client-facing and teamwork skills.
Advanced knowledge of Engineering terms, scheduling and planning concepts.
Advanced knowledge in drawings, contracts, change control, document control.
Proficient user for Primavera V 17.1 PPM and MS Project 2016
Advanced Microsoft Office Skills (Word, Excel, PowerPoint)
Work History
SL NO
COMPANY NAME
POSITION
TIME SPAN
PROJECT DETAIL
1
SEPCOIII – SHANDONG TIEJUN ELECTRIC POWER ENGINEERING CO LLC
Planning Engineer
2019- July to Present
600,000 m3/d Capacity SWRO plant, RABIGH, KSA
2
SEPCOIII – TIEJUN SOHAR POWER CONSTRUCTION LLC
Planning Engineer
2018 – March to 2019- May (1.2 Year)
1714.9 MW Combined cycle power project,SOHAR- OMAN
3
SEPCOIII CONSTRUCTION LLC
Planning Engineer & Commissioning Coordinator
2017 – April to 2018- January (9 Month)
447 MW Combined cycle power project SALALAH- OMAN
4
SEPCOIII -SHANDONG TIEJUN ELECTRIC POWER ENGINEERING CO.LTD
Jr. Electrical Engineer
2013 – January to 2017- April (4.4 Year)
2*600MW thermal power plant,CUDDALORE, INDIA
KEY RESPONSIBILITIES AS SCHEDULING ENGINEER:
Prepare Primavera P6 project schedules, including Work Breakdown Structure (WBS), activities, logic and activity coding to an appropriate level of detail for effective project and programme management. Monitor and report on progress against the plan and make changes as required.
Escalate risks to the delivery of project activities to Project Manager(s), highlight key milestone and critical path issues to team members, provide assessments of the impact of such issues and recommend solutions to correct the position, develop recovery programmes and contingency plans in order to meet changed objectives.
Liaise with Lead Engineers to obtain progress updates and identify potential variance issues.
Provide Project Manager with clear and concise progress and variance reports to enable accurate and timely client and internal reporting.
Manage baselines and implement change control on the project schedules in conjunction with the wider project controls system. Critically review consultant and contractor programmes to ensure logic and alignment with project objectives and key dates.
Incorporate appropriate contractor summary activities into programme schedules.
Develop and manage project schedules throughout the full project lifecycle is essential.
Analyse programmes to critically comment on logic, sequence & task duration and review and analyse programmes to identify solutions and strategies which can optimise or reduce programme durations, provide recovery options for programme delay and mitigate future project programme risks.
KEY RESPONSIBILITIES AS DELAY ANALYST
Analysis of contractual terms and conditions
Analysis of productivity levels, records and contractual notices
Preparation of a cause and effect detailed analysis
Presentation and negotiation of the claim
Identification of contractual routes for the recovery of cost
Identification of planned programme and critical path
Ascertaining the adequacy of the planned programme and correcting as necessary
Analysis of the revised/updated programmes and reasons for changes
Inspection of records and delay notices
EOT analysis using various methods (As Planned versus As-built, Impact as planned, Time Impact Analysis, Windows Analysis, etc.)
Adopting the correct strategy for the mainstay of successful claim/dispute resolution.
Offer strategic guidance that is focused on the provable issues and to prepare documentation that is technically, legally and commercially correct.
Deals with construction disputes involving complex issues and to meet this challenge with documentation that includes high impact demonstrative evidence and graphics.
Key Result Areas at Site Engineer/Project Execution level
As a commissioning Coordinator in Oman project
Responsible to coordinate all the commissioning and operation activities with customer.
Preparing daily and weekly and monthly commissioning and operation activities in the site.
Active member in commissioning activities such as charging of electrical systems, trail running of all the motors and pumps, boiler and turbine system flushing.
Coordinates with the customer, consultant and other relevant parties for site witness inspections
Documentation and Maintain Erection, Testing and commissioning protocols
Prepares daily / weekly accomplishment report during surveillance
Ensure work completed to conformity with the prevailing standards and specifications
Preparing and coordinating Daily, Weekly minutes of meeting (MOM) with client.
Preparing and submitting and get approval of commissioning inspection document of each commissioning activities from client.
Check and coordinating the PTW implementation at the site.
Preparing and get approval of CCC packages from client.
Preparing and get commissioning completion certificate from Client.
As an electrical engineer in India project
Electrical Equipment’s Testing and commissioning.
Erection, Testing and commissioning of Isolators, SF6 gas Circuit Breakers, Earth switches, Capacitance Voltage Transformers, Lighting Arrestors up to 400Kv Switchyards.
Testing and commissioning Generator Transformers (250MVA), Station Transformers (90MVA), Unit Transformers (22MVA) and Dry Type Transformers (2.5MVA) and Rectifier Transformers.
Perform the stability tests of Transformers and Motors.
Testing and commissioning of Protection Relays and Auxiliary Relays
Erection, Testing and commissioning 11KV&6.6KV HT Switch Gears, 0.415KV LT Switch Gears.
Testing and commissioning Current Transformers, Potential Transformers.
Testing and commissioning Gas, Vacuum and Air Circuit Breakers.
Testing and commissioning HT Motors and LT Motors
High voltage test for HT Power cables, Bus bars, Bus ducts.
Testing and commissioning Neutral Grounding Resistors and Neutral Grounding Transformers.
Testing Current & Voltage Transducers.
Logic checking and settings entry in Numerical Relays.
Switch gear Mechanical Operation and Functional checks.
Active member for plant performance tests.
EDUCATION
2008-2012
BE- Electrical & Electronics Engineering-(2012)- CGPA- 9.28, Periyar Maniammai University, Tanjore
PERSONAL DETAILS
Date of Birth
21/05/1991
Permanent Address
No: 12, MLS Nagar, Mathakottai Raod, thanjavur-613005
Father’s Name
T .Nepolean
Nationality
Indian
Marital Status
Married
Passport Number
N9096695
Place of Issue
Trichy
Date of Issue
15/06/2016
Date of Expiry
14/06/2026
Languages Known
Tamil, English, Hindi, Malayalam