cvsbbddbbdbbdvvdbdbdbdbbd
`
–
https://www.facebook.com/ryeljohn10
RYEL JOHN J. SANAO
CIVIL ENGINEER
PROFILE
* ***** ** **** ********** as QS Engineer
assigned to both main and site offices; and 1+
years as Site Engineer in a completely finished
project.
I am patient, practical and creative. I work with
initiative, certainty and flexibility. I am also a multi-tasker, who’s willing to take on additional
work load if necessary. And if anything else, I
am much willing to learn and explore new
things. I believe any knowledge can be acquired
and practiced to attain proficiency.
PRC License No. 0149292
COMPUTER SKILLS
MS POWERPOINT
MS WORD
MS EXCEL
AUTOCAD
CONTACT DETAILS
BLOCK 15 LOT 10 DREAMLAND SUBD., HAGONOY,
TAGUIG CITY, 1630
adfdzg@r.postjobfree.com
adfdzg@r.postjobfree.com
CCT CONSTRUCTORS CORPORATION
QS/SITE ENGINEER (21 MAR 2019 TO PRESENT)
CONSTRUCTION OF BC BRIDGES, TRANSFER TOWER
STATION, SUPPORT & RAMP (PHASE 2, 3 & 4)
Office Works
Preparation and thorough checking of detailed drawing of structures for the conveyor bridge and tower supports
Quantity Calculations for structural steel members of Conveyor Bridge and tower supports
Site Works
Monitoring of civil and structural works
Site inspections prior to concrete pouring of structures and installation works for steel structures
Monitor and assist tower support and conveyor bridges installation
Preparation of execution plans and lifting schemes prior to installation of structures
TOYO CONSTRUCTION CO., LTD.
QS ENGINEER (13 SEP 2017 TO 20 MAR 2019)
PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT
(PHASE III) – Contract Package 2
Preparation of As-Built drawings of Layout Plan and Drainage System (Box Culvert, Manhole & U-ditch)
Preparation of Reinforcement Schedule for Drainage (Box Culvert & U-Ditch)
Quantity Calculation for Dredging Works (Pilot Channelling, Borehole, Adobe/Hard-Strata Breaking)
Preparation of As-staked drawings for dredging works
Compilation of Survey Data (Topographic Survey)
Claims on the material cost of Backfill Site
Monitoring of Dredging works
Modification of work schedule due to Time Extension (PERT- CPM & S-Curve Diagram)
Compilation of Drawing Attachments for Progress Billing QS ENGINEER (16 JAN 2017 TO 12 SEP 2017)
ESTIMATION DEPARTMENT, MAIN OFFICE
Preparation of Pre-bidding documents
Quantity Calculations
Methodology Drawings & Method Statements
Construction Method Drawings
Overview of PERT-CPM
~ WORK EXPERIENCE ~
CENTRAL COLLEGES OF THE PHILIPPINES
(2011-2016)
BACHELOR OF SCIENCE IN CIVIL ENGINEERING
MAKATI SCIENCE HIGH SCHOOL
(2007-2011)
PERSONAL DATA
TAX ID NUMBER
SSS NUMBER
PHILHEALTH NO.
PAG-IBIG MID NO.
BIRTHDATE
BIRTH PLACE
CITIZENSHIP
CIVIL STATUS
RELIGION
: 34-6456278-3
: 01-052227268-5
: 10 JANUARY 1995
: MANILA
: FILIPINO
: SINGLE
: ROMAN CATHOLIC
~ EDUCATIONAL BACKGROUND ~