Post Job Free
Sign in

Engineer Plant

Location:
Khobar, Eastern, Saudi Arabia
Posted:
August 17, 2020

Contact this candidate

Resume:

NAME: MUHAMMAD YOUSUF (IMMEDIATELY AVAILABLE ON LOCAL TRANSFER)

Position: Sr. Discipline Engineer-I&C

Experience: 13 plus Years

SAUDI ARAMCO (GES/GES+) Experience: 10+ Years

Educational Qualifications: Bachelor of Engineering (Electronics) Dec 2006

Mobile: +966-*********

Current Location: Khobar, Saudi Arabia

Email: ********@*****.***

Summary of Career

Presenting over 13 plus Years of diversified experience, within various legendary industries environments, including oil & Gas (Onshore & offshore) and Petrochemical etc.

Sr. Instrument & Control System Engineer offering over 13 years of having depth experience in the field of Instrument & Control which includes project proposals, Front-end Engineering and Design (FEED), Detail Engineering., Project Designing in various Plants like Petrochemical, Oil and gas onshore & offshore.

Experienced in Instrument and Control System which include Field Instrumentation, Process control system (PLC and DCS), Safety related system (ESD), SCADA systems, Compressor Control System (CCS) & Remote Terminal Unit (RTU).

Specifically have design experience in preparation/review of Project Deliverables, Instrument Cable Block Diagram, Instrument Loop Diagram (ILD), Interconnection Diagrams (ECD), Nameplate Schedule (NPS) for instruments, Instrument Installation Schedule (IIS), I/O Data List, Piping& Instrument Diagram (P & IDs), Cable & Conduit Schedule (CCS), Cable Routing Layout, Cause and effect diagram (CED), Logic Diagram (LOG), Instrument Specification Sheet (ISS), Functional Specification Documents (FSD) for DCS, ESD, CCS, RTU & VMS system.

Strong experience in Material Requisition, technical bid evaluation and analysis of bids (Vendor documents) from multiple vendors for technical details and compliance to complete scope of supply.

Good working knowledge of PRC, SAUDI ARAMCO, SATORP, BP& ISA Standards.

Visited various Petro Rabigh &Saudi Aramco Plants in Rabigh, Riyadh Refinery & Ras Tanura Refinery, and Field Data collection for Instrument drawings modification.

Successfully completed several projects related to Oil & Gas, petrochemical, mines Sector Specially for Saudi Aramco, SATORP, SADARA, MA’ADEN and SABIC.

Providing QA/QC for design packages prepared by other engineers.

Participation in the HAZOP Studies, participation in the Best Practices.

Prepared the Instrument engineering man-hours estimate for the number of project Proposals and detail design for all over the kingdom areas like Rabigh, Ras Tanura, Abqaiq, Abu Ali, Berri, Qatif Riyadh & Yanbu for Saudi Aramco Projects, Jubail for SABIC, SASREF, SATORP, MARAFIQ & SADAF etc.

Major Roles in Various Organizations

Discipline Engineer Instrumentation in SLFE, Saudi Arabia- Sep 2019 to Till Date

Lead Discipline Engineer I&C in Petro Rabigh through contactor, Saudi Arabia- July 2017 to June 2019 (02 Years)

Sr. Instrument &Control Engineer in JACOBS ZATE, Saudi Arabia- April 2013 to Dec 2016 (04 Years)

Instrument & Control Engineer in Saud Consult, Saudi Arabia- Feb 2008 to March 2013 (05 Years)

Instrument Engineer JGC-Descon Engg. (Pvt) Ltd, Pakistan-Jan 2007 to Jan 2008 (01 Years)

(Details on Next Page)

Educational Qualifications

Bachelor of Engineering (Electronics) - Mehran University of Engineering & Technology, Pakistan-2006

Computer Skills/ Software Skills

Networks : Microsoft Window XP, Ms Office

Programming Languages : ‘C’ Language

Seminars / Trainings / CO-CURRICULAR ACTIVITIES

” Smart Plant Instrumentation INTOOL version 2013” – At Jacobs, Alkhobar, Saudi Arabia

Quality Management System – At Jacobs, Alkhobar, Saudi Arabia

Employment Records

Name of Institution: SNC-LAVALIN FAYZ ENGINEERING SAUDI ARABIA

Job position : Instrumentation Engineer

Year : Sep 2019 to Sep 2020

I have worked on these projects but not limited to the following:

Project: BI-10-01868: Upgrade Ethane Facility – Ju’aymah NGL Fractionation Plant (Saudi Aramco)

Roles and Responsibilities:

Worked independently on this Project, (520032), The project scope is to proposed modifications and new facilities shall be installed at QEF (Safwa), JNGLF and Qatif GOSP-1 of Qatif Central Processing Facility (QCPF). This project shall install a water separation and disposal facility at inside JNGLF facility: C2 Reproduction Slug Catcher (R83-D-5303), Water Degassing Vessel (R83-D-5300), Produced Water Disposal Pumps (R83-G-1041A/B/C).

Project: BI-10-052**-****: Upgrade Water Disposal Facility at Qatif

Roles and Responsibilities:

Revised the Material Requisition of PIT, PDT, FT & TT, MOV, ZV and Junction Boxes. Preparation of TBC for Corrosion Monitoring transmitter based on three vendor quotation. Prepared the TBE for PIT, PDT, FT & TT based on vendor quotation and TBC.

Discipline check have been done for the below projects but not limited to the following,

BI-11-20000: Detail Engineering and Materials Procurement Support for 80 NON-TIE-IN Projects for Southern, Northern & Gas Areas

BI-11-20000: Detail Engineering and Materials Procurement For 80 Tie-In Projects in Southern, Northern and Gas Areas (Oil-S)

BI-11-20000: Detail Engineering and Materials Procurement For 80 Tie-In Projects in Southern, Northern and Gas Areas (Oil-N)

BI-11-19000: Detail Engineering and Material Procurement Support for 185 TIE-IN Projects in Gas Areas Batch 1 (Gas)

Name of Institution: PETRO RABIGH SAUDI ARABIA

Job position : Lead I&C Engineer

Year : July 2017 –June 2019

I have worked in Petro Rabigh (through contractor) in Technical Support Department (TSD) as a Lead Instrument & Control Engineer, I have worked independently on below projects but not limited to the following:

Project: WER-161: Replacing LT-2214 & LT-2215 with new level transmitter & chamber (Petro Rabigh)

To prepare the detailed design package to Replace the LT-2214 & LT-2215 with new GWR & DP type level transmitters respectively at Monomer ECR (Ethane Cracker) plant unit R340.

Project: WER-187: New Ethane Feed Moisture Analyzer (Petro Rabigh)

To prepare the detailed design package to install New Ethane Feed Moisture Analyzer R340-AT-0103 at Monomer ECR (Ethane Cracker) plant unit R340.

Project: WER-205: Install USV between D-3502 & D-4501 And X-Cat Pump (Petro Rabigh)

To prepare the detailed design package to Install USV Between D-3502 & D-4501 And X-Cat Pump at PE1-P011 & PE2-P012 in Polymer Plant.

Project: WER-273: Install flow meters for the IA (Instrument Air) and UA (Utility Air) (Petro Rabigh)

To prepare the detailed design package to Install flow meters for the IA (Instrument Air) and UA (Utility Air) at R310- Sulphur Recovery Unit (SRU2 TRAIN-1).

Project: WER-340: Install online Methanol analyzer at R240-R-0001 outlet (Petro Rabigh)

To prepare the Conceptual design package to Install online Methanol analyzer at R240-R-0001 outlet at LPG dryer R240-R-0001 outlet.

Project: WER-357: Gas Detector Installation at CT-02 area (Petro Rabigh)

To prepare the detailed design package for the Gas Detector Installation at CT-02 area, 3 for around cooling water pump in the ground level, 6 for CT (cooling tower) cells, 9 in total.

Project: WER-364: Micro Differential Pressure Gauge in Monomer PIB’s (Petro Rabigh)

To prepare the detailed design package to Install Micro Differential Pressure Gauge in Monomer PIB’s.

Project: WER-417: Connecting the Holding Tank in the Refinery Satellite Building to the Company Sewer Drain Line (Petro Rabigh)

To prepare the conceptual design package for the five (5) buildings holding tank’s sewer connection either to existing underground sewer pipeline, to existing sanitary lift station or directly to the existing treatment plant by means of pressurized flow. Two float type level transmitters shall be installed for each lift station along with pressure gauges. All the pumps signal connected with existing DCS system.

Project: WER-192: Provision of Support Services for Instrumentation System. (Petro Rabigh)

Project: WER-260: HAZOP Recommendation Implementation (Petro Rabigh)

Name of Institution: JACOBS ZATE SAUDI ARABIA

Job position : Sr.Instrument & Control Engineer

Year : April 2013–Dec 2016

I have worked on these projects but not limited to the following:

Worked independently as a Lead I & C Engineer on this Project, (SAG 15093), The project scope is to install new GOSP with 300 MBCD at Abu ALI and South Jubail area, Water Injection Plant (WIP) at south Jubail, LPDGA unit & Condensate Handling Unit at Khursaniyah Gas Plant (KGP) area. There are three Budgetary Items have included in this project. Instrumentation work involved to the preparation of I/Os estimate for all the areas including base case & three alternative cases, preparation of system Architecture diagram for all the areas, preparation of final report for all the cases and areas.

Project: SA212300: Khazzan Gas Project – BP (British Petroleum), Sultanate of Oman

Roles and Responsibilities:

Working independently on different activities for this project but not limited to the following; Bidder quotation reviewed and preparation of the clarifications, Technical Bid Analysis (TBA) & Technical Summary Reports for the Dissolved Oxygen Analyzers, pH & Chlorine Analyzers, PLC & Magnetic Flow Meters for Raw Water Treatment Plant (RTWP) and Central Processing Facility (CPF) areas for the De aeration Package. Review of Vendor Documents Krohne Oil and Gas B.V. and Valvitalia etc. Well familiar with BP Project Specifications, Standards GIS.

Project: BI-10-01610: Install Hydrocracker Gas Scrubber at Ras Tanura Refinery (Saudi Aramco)

Roles and Responsibilities:

Instrumentation & Control deliverables have been prepared/reviewed by myself in this detail design project but not limited to the following;

Preparation of MRs (Material Requisitions), DCPR (Direct Charge Purchase Requisition) & TBE (Technical Bid Evaluation) for Instruments, Review of Instrument Cable Block Diagram, Instrument Loop Diagram, Instrument Interconnection Diagrams including junction boxes, marshaling cabinets & system cabinets, Nameplate Schedule for instruments, Generate report from SPI (Smart Plant Instrumentation) for Instrument Installation Schedule & Cable & Conduit Schedule, Update Instrument Index, Review of Piping & Instrument Diagram, Cable Routing Layout & Instrument Points & Lines, Preparation of Instrument Specification Sheet (ISS) on SPI software version 2013, preparation of Material take-off etc.).

Project: EDR-15R001A-Install New Inst. Air Compressor at MG-2 for MGCP Safe Area. (Offshore)

Project: CER-10-012**-****: Tie-in KRSN-132 AT KP-02, Maintain Potential (MPP OIL Project, KSA)

Project: BI-10-01610: Install Hydrocracker Gas Scrubber at Ras Tanura Refinery (Saudi Aramco)

Project: EWO# 15S004: Replacing Wastewater Injection Pumps GM-239 A/B/C (Abqaiq, Saudi Aramco)

Project: BI-10-01411: Flare Gas Recovery System at BGP (Berri Gas Plant Saudi Aramco)

Project: BI- 10-00742: RTR Clean Fuels Project (Ras Tanura Refinery, Saudi Aramco

Name of Institution: SAUD CONSULT SAUDI ARABIA

Job position : Instrument & Control Engineer

Year : Feb 2008- March 2013.

I have worked on these projects but not limited to the following:

Project: 08N402 (Upgrade fire alarm & gas detection system @ Sea Island 2, 3 &4) Ras Tanura Loading Terminal. (Offshore)

Roles and Responsibilities:

To develop the detailed design package for the installation of three (3) new FM-200 gas fire suppression systems by replacing the old and obsolete Halon gas fire suppression systems at different locations of Sea Island #2, 3 & 4 (plant #49B/C/D), Ras Tanura Loading Terminal.

Project: BI-10-00553: Replace ESD System Phase-1, at Riyadh Refinery (Saudi Aramco)

Roles and Responsibilities:

To prepare the detailed design package to Replace the existing ABB Triguard SC300E ESD systems with new Yokogawa Pro-Safe ESD systems according to the Saudi Aramco Standard including (SAES-J-601). The total IO was 5665.

Project: EWO # 09N018: Install H2S/LEL Detectors, Beacons & Horns North Plants (Saudi Aramco)

Roles and Responsibilities:

To Prepare the Engineering design for the installation of additional Hydrogen Sulfide (H2S) gas detection and warning system at North plants of RasTanura Refinery. The existing H2S gas detection and warning system in North plants (15, 488/493, 52 & J24) is responsible to detect H2S gas leakage and initiate the alarm condition. The H2S gas system includes detectors and audio/visual alarm devices, installed near to the potential source of H2S gas leakage. Same is for the combustible (LEL) gas detection system.

Project: EWO # 11N054: Replace AOV-351/ 352 with smart ZV @ RT Refinery (Saudi Aramco)

Project: EWO #11N036: Install XMTRS on J24-K-301,302,306 @ RT Refinery (Saudi Aramco)

Project:BI-10-00211: Upgrade Substations, at Riyadh Refinery (Saudi Aramco)

Project: EWO # 10N048: Wiring Limit Switches of New Cock Valves to DCS (Saudi Aramco)

Project: EWO # 10N010: Install Skim Oil Pump @Tanks D-602/603 in Plant J78 (Saudi Aramco)

Project: EWO # 09N007: Install XMTRS to monitor Ambient Conditions inside PIBs (Saudi Aramco)

Project: EWO # 09N038: Install TOC Analyzer on Refinery Return Condensate (Saudi Aramco)

Name of Institution: JGC-DESCON ENGINEERING (PVT) LTD PAKISTAN

Job position : Instrument Engineer

Year : Jan 2007 to Jan 2008.

Worked experience includes Cable Block Diagram, Instrument Loop Diagram, Instrument Interconnection Diagrams, Nameplate Schedule Instrument Installation Schedule, Cable & Conduit Schedule, and Instrument Specification Sheet, Supervising the work including Piping & Instrument Diagrams, Layout Drawings and MTO Extraction etc. Instrumentation Items requisitions, Vendor documents review and Technical Evaluation of Vendor items.

Personal Details

Date of Birth : 10 May, 1984

Gender : Male

Religion : Islam

Nationality : Pakistan

Marital Status : Married

Language Known : English, Arabic, Urdu, Punjabi, Hindi



Contact this candidate