Post Job Free
Sign in

Engineer Machine Operator

Location:
Houston, TX, 77075
Posted:
August 17, 2020

Contact this candidate

Resume:

● Long Nghe

***** Marisa Alexis Dr.

● Houston, TX 77075

713-***-****

*************@*****.***

Objective: Seeking a position as Technician, wiring control panel systems for PLC Panels and SCR Panels.

Experience: 02/2010 - 06/2019 Wholesale Electric Supply Inc. Responsible For Point-to-Point wirings Substation Center Point Energy; power Supply Boxes; Plc. Boxes; Soldering and DE soldering Switches… Able To Read And Understand Schematics And Test Procedures. 10/2009 – 01/2010 Lectrus Company (contractor).

Responsible for Point-to-Point wiring of motor control systems and switchgear systems. Worked on different type of cables: Belden cable – type 2, 3, 4, 5 conductors with seals, as well as coax cable.

10/2008 – 10/2009 Independent Contractor in Houston Responsible for residential maintenance and electrical repairs primarily having to do with damages relating to hurricane Ike. 4/2007 – 10/2008 Controls Dynamic International Inc. Responsible for installation of PLC boxes, power supply boxes, PLC controls, and panel systems. Able to read and understand schematics, test procedures, run wire point to point and assist other engineers in the technical and operational aspects of their jobs.

9/2002 – 4/2007 Independent Contractor - Electrical Wireman Responsible for installation, PLC box, power supply box for “Euro” Driver/PLC control panel system. Ability to read and understand schematics, test procedures, run wire point to point, assist engineer in the technical and operational aspects of their jobs.

2/2001 – 9/2002 E.P.D., Inc. – Technician 1

Responsible for installation, PLC box, power supply box for SCR/Switchgear Control Panel Systems. Ability to read and understand schematics, test procedures, run wire point to point, assist engineer in the technical and operational aspects of their jobs.

7/2000 – 2/2001 Frazer, Inc. – Technician 1

Responsible for installation, PLC box, power supply box for “Ambulance truck systems”. Ability to read and understand schematics, test procedures, run wire point to point, assist engineer in the technical and operational aspects of their jobs.

8/1999 – 7/2000 Delta Controls Co. – Technician 1

Responsible for installation, PLC box, power supply box for Control Panel Systems. Ability to read and understand schematics, test procedures, run wire point to point, assist engineer in the technical and operational aspects of their jobs.

10/1998 – 8/1999 A.B.B. August, Inc. – Technician 1 Responsible for installation, PLC box, power supply box for Control Panel Systems. Ability to read and understand schematics, test procedures, run wire point to point, assist engineer in the technical and operational aspects of their jobs.

6/1997 – 10/1998 T.E.S.T. Inc. – Technician 1

Responsible for installation, PLC box, power supply box for Pneumatics and Hydraulics Control panel systems. Ability to read and understand schematics, test procedures, run wire point to point, assist engineer in the technical and operational aspects of their jobs.

7/1995 – 6/1997 I.T.S., Inc. – Machine Operator

Setup and operate the Techno-Wasino series FANUC machine. Follows established programs and new programs under development. Select appropriate processing devices (gold chips, center drills) and load computer. Operate machines to make drive shafts for power steering pumps and oil pumps for Honda and Toyota dealer.

Between Aug 93 to July 95 moved back to Pennsylvania 6/1992 – 8/1993 Stewart & Stevenson, Inc.

Responsible for the installation, vibration monitor, computer box, alarm system for gas turbines control panel system. Ability to read and understand schematics, test procedure, cable color-code, run wire point to point. Perform soldering and de-soldering rework of circuit harness board, cables and reassemble equipment as needed. Assist other technicians and engineer in the technical and operational aspects of their jobs.

5/1991 – 6/1992 Rose Hill Control – Electrical Wireman Responsible for the installation, vibration monitor, computer box, alarm system for gas turbines control panel system. Ability to read and understand schematics, test procedure, cable color-code, run wire point to point. Perform soldering and de-soldering rework of circuit harness board, cables and reassemble equipment as needed. Assist less experienced operators. 2/1990 – 5/1991 International Switchboard Controls Co. – Electrical Wireman Responsible for the installation, vibration monitor, computer box, alarm system for gas turbines control panel system. Ability to read and understand schematics, test procedure, cable color-code, run wire point to point. Perform soldering and de-soldering rework of circuit harness board, cables and reassemble equipment as needed.

Education: 1986 – San Jacinto Central Campus – Houston Certificate Automotive Technology

References: Available Upon Request



Contact this candidate