Post Job Free

Resume

Sign in

Engineering GEologist

Location:
DLF City Phase 3, Haryana, India
Posted:
August 16, 2020

Contact this candidate

Resume:

*.Name:

ASHOK KUMAR SINGH

*.Present Position:

General Manager (Engineering Geology)

3.Present Organisation:

Tractebel Engineering Pvt. Ltd., Gurugram, India

4.Mobile:

+91-995*******/ +91-949*******

5.Email:

adfc6f@r.postjobfree.com

6.LinkedIn:

https://www.linkedin.com/in/ashok-kumar-singh-a197287

7.Nationality: Indian

8.Country Worked: India, Nepal, Bhutan, Uganda (East Africa)

9.Key Qualifications:

Extensive experience of +21 years in DPR preparation, surface and sub-surface engineering geological exploration & assessment, Detail Engineering Projects, Construction Monitoring and Project Technical Due Diligence in India, Nepal, Bhutan & Uganda.

Areas of Expertise include:

Experience in sub-surface investigations, surface geological mapping, 3D logging, foundation mapping and verification of in-situ test results for feasibility stage, detailed project and construction stage.

Geological profiling of Dams, Underground Structures & Tunnels.

Providing Geological & geotechnical inputs for support system Design and Engineering of projects for NATM tunnel excavation.

Review of key geological design assumptions for detailed design projects.

Involved in Construction monitoring, LE services, Owner’s Engineers.

Periodic monitoring from feasibility study stage to construction stage.

Technical Due Diligence of hydropower projects.

Preparing reports and documents as required or specified

Responsibility to prepare and verify the Geological chapters Bankable DPR (Detailed Project Report) and technical specification.

Maintain records documenting decisions made at meetings, progress of project implementation and changes to plans in reference to geological surprises

Internal Project Management.

10.Education:

1998 M.Sc.(Tech) -Applied Geology, Vikram University, Ujjain, India

1997 M.Sc. Geology, Vikram University, Ujjain, India

1995 B.Sc. – General, APS University, Rewa, India

11.Employment Record:

From Aug. 2011 To Till date

Employer Tractebel Engineering Pvt. Ltd., Gurugram, India

Positions held General Manager – Engineering Geology

From Mar. 2010 To Aug. 2011

Employer Patel Energy Resources Pvt. Ltd, Noida, India

Positions held Dy. Manager - Geology

From Jun. 2008 To Feb. 2010

Employer Energy Infratech Pvt. Ltd, Gurugram, India

Positions held Dy. Manager - Geology

From Jun. 2005 To May. 2008

Employer Aster Infrastructure Pvt. Ltd, Telangana, India

Positions held Sr. Geologist

From Oct. 2000 To Jun. 2005

Employer Cengrs Geotechnica Pvt. Ltd., New Delhi, India

Positions held Geologist

From Dec. 1998 To Sep. 2000

Employer GEIM (India) Consortium, Kolkata, India

Positions held Geologist

12.Nature of Project

Transport tunnel projects

Hydropower Projects

Road & Highways Projects

Thermal Power Projects

Mineral Exploration Projects

13.Recommendation

Nepal Electricity Authority (NEA), Kathmandu, Nepal – as Geology Expert – International.

Tractebel Engie GmbH, Germany – as Engineering Geological Expert.

ENGIE ExpAND Programme – nomination as Local Expert.

14.Paper Presentation

Stability Analysis for the back slopes of powerhouse of Bhasmey Hydroelectric Project, Sikkim, India – EGCON – 2018 National Conference on Prospects and Retrospect in Engineering Geology Geophysics and Instrumentation, Hyderabad, India.

15.Transport Tunnel Assignments

Name of the Project

:

Provision of Technical and Financial Services for Pune – Mumbai Hyperloop Project

Year

:

Oct. 2018 – Ongoing

Location

:

Pune – Mumbai Hyperloop, India

Client

:

Pune Metropolitan Regional Development Authority (PMRDA)

Main project features

:

Hyperloop Alignment between Pune - Mumbai

Positions held

:

Geologist

Activities Performed

:

Assessment of supplied investigation data for surface geological condition based on lithology, geological structures and terrain stratigraphy. Observation on geological suitability of proposed alignment. Assistance to Client in identification of project risk and allocation of it in an efficient and economic manner.

Name of the Project

:

Consultant and Technical Advisor to perform the expert evaluation of the study report submitted Delhi Metro Rail Corporation (DMRC) and other agencies in connection with the High Speed Rail Corridor in Kerala from Thiruvananthapuram to Kasargod.

Year

:

Jul. 2016 – Feb. 2017

Location

:

Kerala, India

Client

:

State Bank of India

Main project features

:

High Speed Rail Corridor with elevated and underground tunnel and stations.

Positions held

:

Geologist – Risk assessment and evaluation

Activities Performed

:

As an Independent Engineer’s responsible for geological risk assessment and monitoring of project. Suggestion and implementation on support system of tunnelling for risk mitigation.

Name of the Project

:

Pre-tender consultancy services for “Design and Construction of Underground Station Package UG-1 & 2” for Metro Link Express for Gandhinagar and Ahmedabad (MEGA) Company Limited

Year

:

May 2016 – Aug. 2016

Location

:

Ahmedabad, India

Client

:

Pratibha Industries Limited

Main project features

:

Metro Twin tunnels with underground stations

Positions held

:

Geologist – Risk assessment and project monitoring

Activities Performed

:

Engineering geological review of tender document, preparation of pre-bid queries, and preparation of technical assessment note & preliminary geological drawings.

Name of the Project

:

Feasibility Study High Speed Rail Project Package- 1 (New Delhi – Mumbai) of Diamond Quadrilateral Network of High Speed Rail Corridor

Year

:

Nov. 2015 – Ongoing

Location

:

New Delhi – Mumbai Corridor, India

Client

:

High Speed Rail Corporation of India Ltd. (A Government of India Enterprise)

Main project features

:

High Speed Rail alignment between New Delhi – Mumbai.

Positions held

:

Geology Expert

Activities Performed

:

Assessment of surface geological condition based on lithology, geological structures and demarcation of geological activities (mining) along the proposed alignment.

Co-ordination with design team for the incorporation of extrapolated geological conditions to finalise the geologically suitable alignment.

Name of the Project

:

Construction, Operation and Maintenance of Z-Morh tunnel including approaches on NH-1D, Jammu & Kashmir – LE services for Srinagar Sonamarg Tunnelway Limited (SSTL).

Year

:

Mar. 2015 – Aug. 2015

Location

:

Jammu & Kashmir, India

Client

:

ICICI Bank

Main project features

:

Z-shape twin road tunnel

Positions held

:

Geologist – Risk assessment

Activities Performed

:

As an Independent Engineer’s responsible for geological risk assessment of project for the banker. Technical appraisal of project design, Engineering geology condition Suggestion and implementation on geological risk and its suggestive mitigation.

Name of the Project

:

Construction of underground metro stations, twin tunnels and ramps along North-South corridor, Coastal Projects Limited

Year

:

Oct. 2014 – Nov. 2015

Location

:

Bangluru city, Karnataka, India

Client

:

State Bank of India

Main project features

:

Metro Twin tunnels with underground stations

Positions held

:

Geologist – Risk assessment and project monitoring

Activities Performed

:

As an Independent Engineer’s responsible for geological risk assessment and monitoring of project and preparation of quarterly monitoring report for the banker. Suggestion and implementation on support system of tunnelling for risk mitigation.

Name of the Project

:

Geotechnical Investigation of Bridge section 910 – 950, NH-7, A.P.

Year

:

2007 –2008

Location

:

Andhra Pradesh, India

Client

:

HCC

Main project features

:

RCC bridge with 300 m span

Positions held

:

Geologist – Instrumentation

Activities Performed

:

Completion of Plate Load / Cyclic Plate Load test at each pier of the bridge, Core logging and completion of water pressure test. Geological mapping of the pier foundation. Preparation of geological report on ground condition of study area.

Name of the Project

:

Geotechnical Investigation for DMRC: Metro Tunnel Alignment between Green Park and New Delhi including stations.

Year

:

Nov. 2004 – May 2005

Location

:

New Delhi, India

Client

:

DMRC

Main project features

:

11 km long metro twin tunnel of 6.5m dia.

Positions held

:

Team Leader – Site Geologist

Activities Performed

:

Geological and geo-technical investigations – core drilling, logging, water pressure test and ground water profiling. Preparation of geological assessment report on foundation condition based on sub-surface investigations. Interaction with client representative regarding the daily updates on ground condition along the proposed alignment based on geological/ geo-technical exploration.

Name of project

:

Geotechnical Investigation for Delhi Metro Project (Phase-II) Contract - Metro Tunnel Alignment to construct viaduct and three elevated Stations at AIIMS and Malviya Nagar on New Delhi Gurgaon Corridor.

Year

:

Mar.2004 – Oct. 2004

Location

:

Delhi, India

Client

:

DMRC

Main project features

:

Construction of underground metro stations

Positions held

:

Geologist

Activities Performed

:

Geo-technical investigations – core drilling, logging, water pressure test and ground water profiling. Preparation of geological assessment report on foundation condition based on sub-surface investigations. Interaction with client representative regarding the daily updates on ground condition along the proposed alignment based on geological/ geo-technical exploration.

Name of the Project

:

Geotechnical Investigation for Delhi Metro Rail Project Under Contract MC-1A

Year

:

2002

Location

:

Delhi, India

Client

:

KSHI JV

Main project features

:

Metro twin tunnel of 6.5m dia

Positions held

:

Geologist

Activities Performed

:

Geo-technical investigations – core drilling, logging, Water pressure test and ground water profiling. Preparation of geological assessment report on foundation condition based on sub-surface investigations. Interaction with client representative regarding the daily updates on ground condition along the proposed alignment based on geological/ geo-technical exploration.

16.International Assignment (Hydropower Projects)

Name of the Project

:

Detailed Engineering Design and Tender Document Preparation of Tamakoshi V Hydroelectric Project, Nepal

Year

:

Mar. 2017 – Nov. 2019

Location

:

Kathmandu, Nepal

Client

:

Tractebel GmbH, Germany & Nepal Electricity Authority (NEA)

Main project features

:

Tandem project with 8.2km long HRT, underground powerhouse (18m wide) with 3 vertical Francis turbines. Installed capacity 99.8 MW.

Positions held

:

International Expert - Geology

Activities Performed

:

Field reconnaissance, Geological mapping of project main features and investigation of structural features, Identification of data deficiencies, and remedies, Preparation of Inception report, Technical Specifications, Baseline geological report for Design support. Geological assessment for Tender document.

Name of the Project

:

Technical Due Diligence of Sindila Hydropower Project (5 MW)

Year

:

July 2015 – Dec. 2015

Location

:

Near Kasese, Fort Portal, West Uganda (East Africa)

Client

:

ENGIE – GDFSUEZ, Dubai

Main project features

:

-Trench Weir –5m High

-HRT/ Channel –4.5 km long

-Surface powerhouse Consisting 2 units of 2.5 MW each

Positions held

:

Sr. Geologist

Activities Performed

:

Assessment of geological/ geo-technical condition in and around weir, desilting tank, headrace channel & powerhouse area of the project for the preparation of geological/ geo-technical risk assessment report for the investment purpose.

Name of project

:

590 MW Chamkharchhu-II; 364 MW Chamkharchhu IV and 170 MW Dangchhu HEPs, Bhutan - Preparation of Pre-Feasibility Reports

Year

:

April 2013 – Feb 2015

Location

:

Central & East Province, Bhutan

Client

:

Department of Hydropower & Power Systems, Ministry of Economic Affairs, Royal Govt. of Bhutan

Main Project Features

:

Name of Project

Chamkharchhu-II

Chamkharchhu-IV

Dangchhu

Capacity

590 MW (4x147.50)

364 MW (4x91)

170 MW (3x56.67)

Location

Zhemgang

Bhumthang

Wangdue Phodrang

Dam (Height / Length)

29.70 m /135.00 m

56.25 m / 125.00 m

20.0 m / 46.50 m

HRT (dia / length)

8.50 m / 8944 m

8.0 m dia / 8305.88 m

4.5 m / 10241.04 m

Surge Shaft (Dia/Ht.)

17.0 m / 71.5

15.0 m / 67.0 m

8.0 m / 91.0

Powerhouse

Underground

Underground

Underground

Positions held

:

Sr. Geologist

Activities Performed

:

Preliminary site inspection for initial assessment of the project; Finalization of the requirement for survey & investigation (S&I) and prepare the S&I programme, along with the Client and the local agency involved for these works. Monitoring of the S&I works on site, verification of results / data obtained and carrying out geological assessment of the project area for finalization of location of the project components and development of project layout in co-ordination with other disciplines. Preparation of geology chapters of the Feasibility Study Report

Imparting training and conducting workshop sessions for Capacity Building of Client’s personnel on Geology aspects of hydropower projects.

Name of project

:

118 MW Nikachhu HEP, Bhutan -Preparation of Feasibility Report, Detailed Project Report and Tender Document‘

Year

:

Since March 2012 – Feasibility Report in Sept 2012; Detailed Project Report in Oct. 2013 and Tender Document scheduled for Jan. 2014 (Project Under Construction)

Location

:

Trongsa, Bhutan

Client

:

Durk Green Power Corporation Ltd.

Main project features

:

-Dam –38m High concrete gravity dam & 90.25m length

-Desilting Chamber – 2 Nos. 7.5(w)x10.95(h) & 12.2 m high

-HRT – 4 m dia & 12.15km long

-Surge Shaft: Restricted orifice, 10.5m Dia & 57.2 m high

-Underground powerhouse Consisting 2 units of 59 MW each

Positions held

:

Sr. Geologist

Activities Performed

:

Preliminary site inspection for initial assessment of the project; Finalising the requirement for survey & investigation (S&I) with the Client, verification of S&I results / data obtained and carrying out geological assessment of the project area for finalization of size & location of the project components, alignment and development of project layout in co-ordination with other disciplines. Preparation of geology chapters the Feasibility Study Report & Detailed Project Report. Provide relevant inputs to civil design team for finalizing the design. Preparation of baseline geology for the tender documents.

Imparting training and conducting workshop sessions for Capacity Building of Client’s personnel on Geology aspects of hydropower projects.

Name of the Project

:

DPR preparation for 640 MW Karuma Hydro Electric Project (Project under construction)

Year

:

Sep. 2009 - Feb. 2010

Location

:

Gulu, Uganda

Client

:

Ministry of Energy & Mineral Development (MEMD), Uganda

Main project features

:

640 MW Karuma Gravity having Dam height of about 70m, 07 tunnels of 238m length & dia. 7.7m each,, 29m high surge shaft, underground PH with 06 turbines.

Positions held

:

Geologist (Resident)

Activities Performed

:

Interaction with officials of MEMD (Ministry of Energy & Mineral Development) & NEMA (National environment Management Agency) in concern with progress of geological investigations & Topographical Survey. Co-coordinating the topo-survey in association with surveyor. Drill-hole logging/ geological mapping of the entire project area

17.Construction Projects (Hydropower) with NATM/ Drill & Blast Tunnelling Method

Name of project

:

Construction Supervision of 82 MW Lower Solu Hydro Electric Project

Year

:

2013 - Ongoing

Location

:

Saleri, Nepal

Client

:

Essel-Clean Solu Hydropower Private Limited

Main project features

:

Installed Capacity: 3X27.33MW

HRT (Dia/Lg.): 3.2 m / 4330.8 m D Shape HRT

Penstock (Dia/Lg.): 2.4 m / 1515 m

Gross Head : 491 m

Design Discharge: 20.42 m3/s

Power House Type: Surface

Tubrine: Pelton, Vertical Axis

Surge Shaft (Dia/Ht.): 8.0 m /36 m

Positions held

:

Sr. Geologist

Activities Performed

:

Geological and geotechnical assessment of foundations at dam site. Providing geological inputs for design of project including suitable support / strengthening system based on available surface and sub-surface geological data during detail design & engineering; Responsible for geological profiling of dams & tunnels. Geological review and interpretation of daily basis geological inputs from site in the form of 3D geological logs of HRT and excavation work at dam sites. Interpretation of probe data to extrapolate the advance geological conditions in HRT; Preparation of reports and documents.

Name of the Project

:

Construction Monitoring for 110 MW Chuzachen Hydroelectric Project

Year

:

Dec. 2011 – Jan. 2013

Location

:

East Sikkim, India

Client

:

GATI Infrastructure Ltd.

Main project features

:

-Dam –42m (Rangpo) and 41m (Rongli) High, Concrete Gravity

-HRT – Dia. 3.5m (Rangpo), 3.1m (Rongli) and 4.6m (common) & 7.9 km long

-Surge Shaft : Dia. 12m, 103.9 m high

-Surface PH with Francis turbine Consisting 2 units of 49.5 MW each

Positions held

:

Geologist

Activities Performed

:

Providing geological inputs for design of project including suitable support / strengthening system based on available surface and sub-surface geological data during detail design & engineering. Review and interpretation of day-to-day basis geological inputs from site in the form of 3D geological logs of HRT and excavation work at dam sites. Interpretation of probe data to extrapolate the advance geological conditions in HRT.

Name of project

:

Construction monitoring of 1200 MW Teesta-III Hydro Electric Project (Commissioned April 2017)

Year

:

Nov. 2008 – Sept. 2009

Location

:

North Sikkim, India

Client

:

Teesta Urja Ltd.

Main project features

:

60 m high Concrete Faced Rockfill Dam, 2 de-silting basins of 17m x 23m x 320m; 14.3km long, 7.5m dia. HRT, 15.5 m dia. surge shaft of 160m height, 1806.67m long & 2 nos. of 4m dia. pressure tunnels including vertical and inclined shaft of length about 1650 m. An underground PH housing 6 units of 200 MW. 1.2 km long 8.2 8.0 m tunnel conveys the water back to River Teesta.

Positions held

:

Geology Expert

Activities Performed

:

Preparation/ up gradation of geological plan and sections of the various project components based on updated stage-wise geological mapping. Risk evaluation of underground excavation based on 3D- logs. Co-ordination with design team to finalise the rock support system.

18.Domestic Assignments

Name of project

:

1450 MW Kalai I Hydroelectric Project - Preparation of Feasibility Study Report and Detailed Project Report

Year

:

Aug. 2009 - Ongoing

Location

:

Arunachal Pradesh (Himalayan Region), India

Client

:

Mountain Fall India Pvt. Ltd.

Main project features

:

Kalai H.E. Project Stage – 1 is the upstream project in Kalai & Hutong Hydro Power Development. The project is proposed with installed capacity of 1450 MW (8x181.25 MW) and annual energy generation would be 6863 GWh in a 90% dependable year.

Positions held

:

Team Leader – Geology (Design)

Activities Performed

:

Supervise geological investigations and preparation of relevant chapters of FSR & DPR (including Geophysical surveys, foundation investigation, satellite imagery interpretation and seismic & simulation studies). Finalization of geological plan and sections of project components. Preparation of technical specifications for tender design.

Name of project

:

520 MW Nakthan Hydro Electric Project - Preparation of Feasibility Study Report and Detailed Project Report

Year

:

Jun. 2011 – Ongoing

Location

:

Kullu, Himachal Pradesh, India

Client

:

Himachal Pradesh Power Corporation Limited

Main project features

:

520 MW Run of River (RoR) scheme utilizing the waters of Parbati river and Tosh nallah, tributaries of Beas river. Located in Kullu District of Himachal Pradesh. This is an immediate upstream development of Parbati Stage-II HEP (800 MW) under construction by NHPC.

Positions held

:

Sr. Geologist

Activities Performed

:

Preliminary site inspection for initial assessment of the project; Finalizing the requirement for survey & investigation (S&I) and prepare the S&I programme. Verification of results / data obtained and carrying out geological assessment of the project area for finalization of size & location of the project components, alignment and development of project layout in co-ordination with other disciplines. Preparation of geology chapters for Detailed Project Report. Provide relevant inputs to civil design team for finalizing the design.

Name of the Project

:

Detailed design of 100 MW Malana – II Hydroelectric Project (Project is under commercial operation since 2012)

Year

:

Aug. 2008 – Jul. 2009

Location

:

Himachal Pradesh, India

Client

:

Everest Power Pvt. Ltd.

Main project features

:

Concrete Gravity Dam of maximum height of 53m. 4.98 Km long headrace tunnel of size 2.9 m (W) x 2.9 m (H). Surge shaft 87m high & 6m dia. Pressure shaft of length 824m & 2.5m dia. (Vertical & Horizontal). Underground powerhouse (67.5m x 21m x 31m) is equipped with 2 units of 50 MW each (Vertical axis Pelton type turbines) to have a total installed capacity of 100 MW. The design net head of the project is 624m.

Positions held

:

Geologist

Activities Performed

:

Incorporation and interpretation of geological investigation data during detailed design stage. Providing advice/ recommendation of the suitable support / strengthening system to design team based on available surface and sub-surface geological/ geotechnical data during detail design & engineering. Review and interpretation of day to day basis geological inputs from site in the form of 3D geological logs of HRT and excavation work at dam sites. Interpretation of probe data to extrapolate the advance geological conditions in HRT. Co-ordination with design team for the incorporation of extrapolated geological conditions to provide post-excavation suitable support system in the HRT.

Name of the Project

:

DPR preparation of 1750 MW Lower Demwe Hydro Electric Project (Techno-Economic Clearance received)

Year

:

Jan 2009 – Aug. 2009

Location

:

Teju, Arunachal Pradesh, India (Himalayan Region)

Client

:

Athena Demwe Power Ltd

Main project features

:

RoR scheme with Installed capacity of 1750 MW (5 x 342 MW + 1 x 40 MW) with diurnal storage. Diversion arrangement on right bank and left bank by way of underground tunnels. Concrete Gravity Dam height 124.80m above riverbed level and length of about 474.35m. 5 no. underground Pressure Shafts leading to Power House. Surface Power House.

Positions held

:

Team Leader – Geology (Design)

Activities Performed

:

Assessment and interpretation of geological investigations (including – geological mapping & geotechnical data collection) in and around the tunnel, powerhouse, Dam, etc. The investigations included Geophysical surveys, foundation investigation.

Name of the Project

:

45 MW Saskang Rong Hydro Electric Project

Year

:

2010 - 2011

Location

:

Arunachal Pradesh, India

Client

:

Dirang Energy Pvt. Ltd

Main project features

:

It is a R-o-R scheme with 24.0 m high & 155 m long Barrage, 02 nos. of Feeder tunnel, an underground Desilting Chamber having 3.457 km long HRT along with 60.0 m high Surge shaft and Surface Power House

Positions held

:

Geologist

Activities Performed

:

Responsible for detailed geological mapping of dam, powerhouse, surge shaft, along HRT during investigation stage. Supervise geological investigations and co-ordinate the consultant geologist in preparation of relevant chapter DPR (including Geophysical surveys, foundation investigation, slope stability study and construction material survey)

Name of the Project

:

24 MW Phudung Hydro Electric Project

Year

:

2010 - 2011

Location

:

Arunachal Pradesh, India

Client

:

Dirang Energy Pvt. Ltd

Main project features

:

It is a R-o-R scheme having 6.0 m high & 40 m long Weir with 02 nos. of Sluices, 01 no. of Feeder tunnel, 02 nos. of Desander having 5.040 km long HRT along with 42.0 m high Surge shaft and Surface Power House

Positions held

:

Team Leader - Geology

Activities Performed

:

Responsible for detailed geological mapping of dam, powerhouse, surge shaft, along HRT during investigation stage. Supervise geological investigations and co-ordinate the consultant geologist in preparation of relevant chapter DPR (including Geophysical surveys, foundation investigation, slope stability study and construction material survey)

Name of the Project

:

Geotechnical Investigations of 1014 MW Thermal Power Project, Padubidri, Distt. Udupi, Karnataka

Year

:

Dec. 2006 – Apr.2007

Location

:

Karnataka, India

Client

:

Lanco Infratech

Main project features

:

2 X 507 MW Thermal Plant

Positions held

:

Geologist

Activities Performed

:

Drilling/ Core logging to evaluate foundation condition. Foundation mapping. Execution of in-situ geotechnical testing i.e. Permeability test, Plate Load Test (PLT), Electrical Resistivity test (ERT).

Name of the Project

:

Miscellaneous Projects -

Geological prospecting including Bore-hole Logging, Sampling, Reserve estimation and report preparation for Cement- grade Limestone deposit of Baghai area, Satna (M.P.) for Prism Cement Ltd. in Oct. 2000.

Geological prospecting including Bore-hole Logging, Sampling, Reserve estimation and report preparation for Cement- grade Limestone deposit of Beawar area, Rajasthan for Shree Cement Ltd. in Jan. 2001 – Mar. 2002 & Nov. 2002 – May 2003.

Geological Mapping, Bore-hole Logging, of Hirmi Limestone deposit for Hirmi Cement Works of Larsen & Toubro Ltd. in Oct. 2003.

Geo-technical investigation of 2 X 250 MW Thermal Power Project, Chhabra for Punj-Llyod Ltd., Jul. 2004 – Dec. 2005.

Year

:

2000 - 2006

Location

:

Various, India

Client

:

Varied

Main project features

:

Various

Positions held

:

Site Geologist

Activities Performed

:

Geological Mapping, Bore-hole demarcation based on mapping, Litho-logical interpretation, supervision of site in-situ geo-technical testing.

Name of the Project

:

Geological exploration of Chemical-grade Limestone, Patan, Jamnagar dist., Gujarat

Year

:

Dec. 1998 – Sep. 2000

Location

:

Jamnagar, Gujarat

Client

:

Nirma Ltd.

Main Project Feature

:

Open Cast chemical-grade limestone mine

Position Held

:

Site Geologist

Activities Performed

:

Geological Mapping, Bore-hole demarcation based on mapping, Litho-logical study, Bore-hole Logging & Sampling, Reserve estimation & involvement in Preparation of geological plans/ sections

19.Languages:

Language Write Read Speak

English Good Excellent Good

Hindi (MT) Excellent Excellent Excellent

20.Certification:

I, the undersigned certify that to the best of my knowledge and belief, these data correctly describe my qualifications, my experience and me.

Ashok Kumar Singh



Contact this candidate