BoilerMaintenanceshiftengineerof6X660MWReliancePowerLtd Designation :Asst.Manager
Company :ReliancePowerLtd.
Duration :Nov17tilldate
Area :BoilerMaintenanceDepartment
Erection,CommissioningandMaintenanceof5X270MW RattanIndiaPowerLtd (Formerlyknow asa IndiabullsPowerLtd)atNashikDist,Maharashtra.
Designation:Asst.Manager
Company :RattanindiaPowerLtd.
Duration :Feb2011toJune2017
Area :BoilerMaintenanceDepartment
Erection&HydroTest(DHT&NDHT)Completionof2X270MW BoilerofAdhunikPower&NaturalResources Ltd.Jamshedpur,Jharkhand.
Designation:Jr.Engineer
Company :AdhunikPower&NaturalResourcesLtd.
Duration :1year11Months(Feb2009toJan2011)
Area :Erection(BoilerPressurePart&NonPressureParts,Ducting&Structure)
Erection,Commissioning,TestingandTrialOperationof1X500MW ExpansionProjectofMAHAGENCOat KhaperkhedaInNagpurDist,Maharashtra
Designation:BoilerErectionEngineer
Company :SunilHi-TechEngineersLtd.
Duration :2Years1Month(Jan2007toFeb2009)
Area :Erection(BoilerPressurePart&NonPressureParts)&TrialOperationofBoiler
CurrentCTC :3.3Lacsperannum
ExpectedCTC :Negotiable
CURRENTJOBRESPONSIBILITIES
MAINTENANCE
Checkingtheoperationalparametersondailybasisinco-ordinationwiththeoperationteam Takingtheproperpermittowork(PTW)andchecktheisolationrequiredbeforestartinganymaintenanceactivity InvolvedinpreventivemaintenanceofboileranditsauxiliariesbyfollowingthePMschedule Maintainingandfollowingthechecklistsoftheequipmentduringthepreventivemaintenanceschedule Involvedinmaintainingtheequipmentspareslistoftheboileranditsauxiliaries Involvedinmaintainingthestandardoperatingprocedures(SOP)oftheequipment Attendingtheonlineleakageswhereverrequired,byinvitingtherelatedagencies AttendingBoilertubeleakageswhereverrequired,byinvitingtherelatedagencies Managingthemaintenanceworkersasperactivitypreference ReportingtothemanagerandmaintenanceHOD
PREVIOUSJOBRESPONSIBILITIES
ERECTION
CheckingforMarking,Cutting,Fitupandweldingasperdrawing
Erectionandalignmentofcolumns,beams,bracingsandsupportingstructures
DynamicroleinsuccessfuldrumliftingofBoilerUnit1to5
ErectionandalignmentofPressurePart&non-pressurepartandsupportingstructurealongwithproper suspensionsupports&weldingcompletionofattachmentsandskincasinginBoilerUnit1to5.
Energeticroleincompletionofcoalpiping&ductingerection&AlignmentalongwithsupportsinBoilerUnit 1to5
EnergeticroleincheckingofFurnace&DuctingATTinBoilerUnit1to5
EnergeticroleinBoilerDHT,NDHT,Lightup,EDTAcleaningprocess,SteamBlowingandfullloadoperation fromBoilerUnit1to5.
ErectionandalignmentofFuelOilpipingwithLDO&HFOstationalongwithsupports
Erectionandalignmentofvalves,orifices,flowmeters,stubsandtemp/presstapinginthepropersequence
Refractoryandinsulationofboilerwaterwalls,mountingsandrooftubes,pipelines,ductsystem,millsetc
PreparingtheBillofMaterials(BOM)neededforerection
Tomaintaindailyprogressreportsandprepareprotocolsafterthefinalalignment
Planningandmanagingtheteamtoachievetherequiredmonthlytonnage
Reportingtotheprojectmanager
COMMISSIONING
Commissioningofboilerpressurepartsbypropervalveregulationandcombustiontuningsbyoilgun, scannerandignitersettingsduringinitiallightup
Chemicalcleaningandalkaliboiloutoftheboiler
CommissioningofWB&LRSB,steamblowing,cleanairflowtest,gasdistributiontestofESP,coalfiring,full load,trialoperationetc
Commissioningofsafetyvalvesofboilerdrum,MS,HRHandCRHcriticallinesbysetpressureandblow downsettingsduringsafetyvalvefloating
CommissioningofID,FDandPAfansduringstartupbymonitoringtherequiredparameters
Commissioningofductsystemsandcheckingtheairandgaspathbymonitoringthegatesanddampers
Commissioningofcoalfeeders
Commissioningofbowlmills
Commissioningofairheaterswithpropersootblowing
Properuseofgasketsandlubricatingoilswhereverrequired ACADEMICS
DiplomainMechanical IASE(GVM) 2007 70.73%(FirstClass)
HSC UPBoard 2001 51.20%(SecondClass)
SSC UPBoard 1999 53.83%(SecondClass)
COMPUTERandSOFTWARESKILLS
MicrosoftOffice,AutoCAD,ANSYS
STRENGTHS
Abilitytothinkclearlyaboutaproblemanddeveloplogicalsolutions
Diplomaticindividualwhoisabletodealwithpeoplefromallwalksoflife
Flexibleandabletoworkunderpressure
Leadershipqualitywiththeabilitytomanageagroup
Goodteamworkerandlistener
Goodspoken&writtencommunicationskills
Punctualatwork
Honestandstrongdeterminationtowardsgrowth
ACHIEVEMENTS
CertificationfromMSEB(Maharashtrastateelectricityboard)forsuccessfulhydrotestof1x500MWboilerbefore thegivenduedate.
AppreciationCertificationfrom AdhunikPower&NaturalResourcesLtd.ForsuccessfulBoilerDrum Liftingof 2X270MWUnitBoilerbeforethegivenduedate.
Appreciationcertificatefrom IndiabullsPowerLtdforsuccessfulworktrialoperationof5X270MW onzero accident.
HOBBIES
Readingbooks,novels,magazinesetc
Watchingmovies
Playingcricketandchess
Driving
PERSONALDETAILS
Father’sName :ShriRamashankarYadav
DateofBirth :1stJuly,1984
Gender :Male
Maritalstatus :Married
Nationality :Indian
PermanentAddress :Vill+PostTaukalpur,Kharagapur.
TahsilSoram,DistAllahabad
UttarPradesh.Pin212503.
Languages :English,Hindi
Preferredjoblocation :Anywhere
DECLARATION
Iherebydeclarethatalltheinformationgivenaboveiscorrectandtruetothebestofmyknowledge Place:Nashik (GautamKumarYadav)
Date:10thAug,2020 Signature