CURRICULUM VITAE:
NAME: MOUMITA BARMAN
MOBILE NO: 980-***-****
E-MAIL: ***.*****@**********.***
PERMANENT ADDRESS: Kallyannagar, Khardah, Kol-700112
OBJECTIVE: To build a career with a leading corporate company with committed and dedicated people who will encourage me to explore myself fully and realize my potential. I would like to work as a key player in a challenging and creative environment.
ACADEMIC QUALIFICATION:
QUALIFICATION
INSTITUTE
BOARD OR UNIVERSITY
YEAR
PERCENTAGE
OR CGPA
B .Tech in
Civil Engineering
REGENT EDUCATION & RESEARCH FOUNDATION
(RERF)
W.B.U.T
2016-2020
8.2
Diploma In Civil Engineering
IGNOU
IGNOU
2014
71%
MBA in marketing
MEDIA INFOTECH
Sikkim Manipal University
2009
82%
Diploma in Interior Designing with AUTOCAD
Youth Centre
Govt. of West Bengal
2007
82%
B.Sc. (Botany Hons.)
Victoria Institution for Girls
Calcutta University
2004
54%
Higher Secondary
Rahara Bhabanath Institution for Girls
W.B.C.H.S.E
2001
62%
Secondary
Rahara Bhabanath Institution for Girls
W.B.B.S.E
1999
80%
WORKING EXPERIENCE: FROM 2011:- STUP CONSULTANTS PVT. LTD., P11, DARGA ROAD, PARK CIRCUS, KOLKATA – 700017
WORKING AS AN ELECTRICAL DRAUGHTSPERSON IN MEP DEPARTMENT FROM 2010 TILL DATE:
Nature of work:-
1. Design of light output in DIALUX.
2. Preparation of Auto-Cad Drawings about:
i) Main single line diagram.
ii) Lighting & socket layout with a DB distribution in details.
iii) Equipment layout with a cable trench and tray layout.
iv) Earthing layout.
v) Lightning protection layout.
Except these assisting in BOQ, load calculation, Cable schedule etc.
SOFTWARE SKILLS: Well versed with AUTOCAD, DIALUX, MS Office Suite (Word, Excel, PowerPoint), & Internet Applications.
PROJECT DETAILS :
NO.
DURATION
PROJECT
CLIENT
CONTRACTOR
01.
2018 January - Till now
Engineering, procurement & construction of multimodal IWT Terminal at Haldia,W.B.
IWA OF INDIA
ITD Cementration of India LTD.
02.
2019 January –Till now
Construction of new railway line between Agartala and Akaura (Bangladesh portion)
IRCON
-
03.
2015 July –Till now
Proposed Development at Santragachi station
South Eastren Railway
IRCON
04.
2015 March–
Till now
Proposed Development at Shalimar station
South Eastren Railway
IRCON
05.
2015 –
Till now
Mumbai Metro line-3
Mumbai Metro Rail corporation LTD.
L&T
06.
2014–2018
Preparation of an integrated Eco-tourism Development Plan of Sagar Island (WB)
ICZM project WB
-
07.
2015-2018
PHED (public health & Education Development building)
Government of health
-
08.
2016
(Tender work)
Rehabitation of water supply in SAMDRUP JONGKHAR
DES
-
09.
2016-2019
Rehabilitation of water work
Palta Garden reach
KEIIP
ITD cement
India J.V.
10.
2016
(Preliminary Design)
Design of north south metro corridor between APMC station and wadaj station for Gandhi nagar(Ahmadabad)
Metro link
EXPRESS
(Gandhinagar )
Systra, Rites,AECOM
11.
2010-2015
Phase 1 development of the proposed airport at Durgapur
Bengal Aerotropolis project
Simplex
12.
2010-2014
Water intake system for 6x660 MW Sasan Ultra Mega Power Project (MP)
Reliance Infrastructure Ltd.
-
13.
2011-2013
2x250 MW Ballavpur Thermal Power Station Ranigung (WB)
EMTA Power LTD.
-
14.
2011-2014
Proposed ILS Hospital at Dum Dum
GPT Health Care Pvt. Ltd.
-
15.
2010-2014
100 Bedded sub-divisional Hospital at Santir Bajar(South Tripura)
Government of health of Tripura
MBL
11.
2010-2015
Phase 1 development of the proposed airport at Durgapur
Bengal Aerotropolis project
Simplex
16.
2011-2014
Consultancy Services for the complete basic & detail design development of road infrastructure at Jamshedpur
TATA Steel Ltd.
-
17.
2012-2014
6 laning Chandi khole Jagatpur (Bhubaneshwar section)
National Highways Authority of India
Simplex
18.
2012-2014
Rajasthan Atomic Power Project – 7 & 8
Nuclear Power
Corporation of India Ltd.
IOT Ltd.
19.
2012-2014
Development of 7.2 MMPTA Iron ORE Export Terminal at the water front west of break water
Mormugao Port Trust
SEW Ltd.
20.
2011-2013
Central Football stadium
at TRIVANDRUM
-
Simplex Infrastructure Ltd.
21.
2011-2013
Paradip Refinery Projects,Paradip,Orissa
Indian Oil Corporation Ltd.
Simplex Infrastructure Ltd.
22.
2011-2012
(Tender work)
Development of Eq-1 berth in the inner harbour of Vizag port (DB BOT Basis)
Vizag Port trust
IVRC Ltd.
23.
2011-2012
(Tender work)
Badarpur Tharmal Power Project (Cooling tower package)
NTPC
FANS
PERSONAL ATTRIBUTES: Honest and hard-working, capable of achieving goals. Confident with good interactive skills, a good team player, punctual and disciplined.
HOBBIES:
•Reading any kind of books.
•Travelling.
•Spending time with my daughter
PERSONAL INFORMATION:
•FATHER’S NAME : Dilip Ch. Gupta
•MOTHER’S NAME : Mitali Gupta
•HUSBAND’S NAME : Anindya Sundar Barman
•DATE OF BIRTH : 01.07.1983
•MATERIAL STATUS : Married
•GENDER : Female
•RELIGION : Hinduism
•NATIONALITY : Indian
•LANGUAGES KNOWN : Bengali, English, Hindi
DECLARATION:
I hereby declare that all the information furnished in the CV are true & correct to the best of my knowledge.
Moumita Barman Gupta
DATE: