Post Job Free
Sign in

Engineer Electrical

Location:
Coimbatore, Tamil Nadu, India
Salary:
150000/pm
Posted:
September 21, 2020

Contact this candidate

Resume:

Page * of *

PRABAKAR .C

E&I Engineer,

D.EEE (Electrical & Electronics Engineering)

E Mail : ********@*****.***

Skype ID : prabastk

Phone : +966-*********

+91-956*******

Career Objective:

I’m looking for a challenging role, which can help me to build a career on the extensive range of technical skills acquired and achieve further professional development. Total Experience: (9+ Years) :

OVERSEAS EXPERIENCE- 9 YEARS (SAUDI ARABIA)

DOMESTIC EXPERIENCE- 6 MONTHS (INDIA)

Educational & Technical Qualification :

D.EEE (Electrical & Electronics Engineering).

Butanol & syngas project(SABUCO) certification of appreciation

Saudi Aramco onshore Maintain potential program certification of appreciation.

Saudi Aramco Abqaiq Restoration Project certification of appreciation.

Arcelor Mittal Tubular Products certificate of appreciation.

Saudi Aramco approved permit receiver.

Daelim approved permit receiver.

Computer Knowledge :

MS Office

SAP Logon

Career Summary :

Overall 9+ years’ experience in Electrical and Instrumentation construction and commissioning at Oil and Gas plant field, tubular projects, Oil, Water and Gas wells, Supervision of 50/67 MVA power Transformer Erection, MRSS 115KV GIS (Gas Insulated Switch yard), Installation of Drive Transformer, Lighting Transformer, MV

& LV cable laying, tray, conduit and Termination of all the electrical and instrument cables. Installation of Drive panels, RTCC Panel, SCADA Panel, RTDB panel, PLC Panel, ACDB, Battery Charger panel, capacitor bank, battery bank, Solar panel installation, Battery Banks installation Control desk Remote I/O Panel HIPPS system, Plant Lighting installation. OHPL Pole Installation works (up to 13.8 KV), Page 2 of 4

Instruments installation H2S, LEL, PI, PIT, MOV, ZV, TW, TIT, FIT,FS,LS, Horn and beacon Flame detector, SPS,CMS, Paging, CCTV, Fire Alarm installation cabling, termination and loop checking. Execution high pressure tubing (20000 PSI) installation and leak testing work, Grounding and Cathodic Protection System Installation, Heat Tracing System Installation, Supervision of Pre-Commissioning of SSV, SSSV, PDHMS, RTU Panel, MPFM,HIPPS. Man power, work planning and scheduling, Experienced in Making Schedule and Clearing Punch List in Final Stage of the project.

HSSE (Safety) intensive responsibilities Handled:

Safety procedures such as permit to work (PTW), Isolation & Lock-Out Tag-Out, Limitation of access, Sanction for Test, Task Risk Assessment/Job Safety Analysis

(TRA/JSA), Quantitative Risk Analysis (QRA), Tool box talk as per international standards for both Low Voltage as well as High Voltage Equipment.

Primary/Secondary Emergency Response Team Member: Handled key responsibilities such as Maintaining Critical Event Log, Positive Isolation of Electrical Energy in case of emergency scenarios.

Organizing Training sessions for contract crew on topics such as Working at Height, Manual handling, Confined Space Entry,H2S Safety, Portable Electrical Equipment Safety.

Brief of the companies worked with:

Company Projects Position Duration

Nasser S. Al

Hajri

Corporation

Saudi Arabia

Project 1

SAUDI ARAMCO: SDGM-

GGM and Sub Manifold

upgrade and Expansion project

E&I

Engineer

Still

Project 2

SAUDI ARAMCO: Abqaiq

Restoration Project(Shutdown

Project)

E&I

Engineer

Sep-2019 to

Nov-2019

Project 3

SAUDI ARAMCO: Khursaniya

Gas Increment Project(KGI)

E&I

Engineer

April-2018

to Aug-

2019

Project 4

SAUDI ARAMCO: Saudi

Aramco Onshore Maintain

Project(Oil, Gas and Water

Well)

E&I

Engineer

Nov-2015

to Mar-

2018

Project 5

TASNEE: Saudi Butanol

Company(SABUCO)

E&I

Engineer

Jan-2014 to

Aug-2015

Project 6 Arcelor Mittal Tubular Products

Electrical

Engineer

Nov-2011

to Dec-2013

Project 7 NSH Fabrication shop

Electrical

Engineer

Dec-2010 to

Oct-2011

KEEC Project 1

Kamalam Electrical Engineering

Contractors

Electrical

Engineer

Jun-2010 to

Nov-2010

Page 3 of 4

Duties and Responsibilities :

Monitoring and checking for Installation performed at site to ensure its adherence to the Drawing Specification and confirms that activities are in accordance with applicable industry / International standards.

Responsible for Execution of MRSS 115KV GIS (Gas Insulated Switch yard)

Supervision for Erection of 50/67 MVA power Transformer.

Supervision for Installation of Drive Transformer, Lighting Transformer.

Supervision for Installation of 13.8 KV MV Switchgear with all related accessories.

Supervision for Installation of Capacitor Bank.

Supervision for Installation of Drive panel, RTCC Panel, SCADA Panel, RTDB panel, PLC Panel, Remote I/O Panel.

Supervision for ACDB, Battery Charger, battery bank, Control desk.

Effectively leading a team of 12 Supervisors of Electrical discipline with the manpower of 250 Technicians

Supervision for Erection of 13.8 KV Switchgear installation (ABB Ltd) from Existing Unit.

Responsible of Installation of LV switchgears (ABB Ltd), MCC Panels, LV Transformers

(15 MVA & 2.5 MVA, Hyundai Ltd)

Supervision for Installation of MV Compressor Motors and LV motors for the Plant Process System.

Supervision for Installation of Lighting system, Fire & gas, Paging System and CCTV system for the Entire Plant

Supervision for Installation Grounding and Cathodic Protection System.

Responsible for Installation of OHPL works up to 13.8 KVA.

Responsible for the Coordination of Circuit Breakers (LV), Dry type and Pole transformers testing, commissioning and installation.

Execution of Heat Tracing Junction Box & RTD Installation, Heat tracing Cable Laying on Pipe, Equipment (Vessels)

Supervision for Installation of Instruments H2S, LEL, PI, PIT, MOV, ZV, TW, TIT, FIT, FS, LS, PDT, horn and beacon Flame detector, SPS, CMS, Paging system, CCTV, Fire Alarm installation cabling, termination and loop checking.

Execution of SSV, SSSV panel, RTU, PDHMS, MPFM, Flow computer panels, HIPPS system Installation and Pre-commissioning.

Responsible for cable insulation resistance test, Hi-Pot Test, Lux test (Illumination) for lighting system and grounding rod and system testing.

Review for the IFC drawing, as-built drawings according to the executed condition and co-ordinate with client engineer to verify and resolve concerns and other related matters.

Provide Technical Direction to the site personal and foreman to ensure quality complied with the quality requirements.

Ensuring that inspection and calibration are done for all material and equipment received at site & conforms the standards and preservation. Page 4 of 4

Coordinating all processes and functions with construction managers, supervisors, quantity surveyors and workforce. Liaising with client's representatives as well as with consultants, engineers and surveyors.

Attends the Weekly Progress Meetings (Internal as well as with Client) and assist in preparation of Minutes of Meetings.

Ensuring all procedures and methods of statement are submitted to the client for review and approval.

Coordinates materials and assists in the logistics, its shipment and receipt at construction site.

Provide full support as required by the Management and PMT for all projects Personal Profile :

Date of Birth : 24-04-1988

Sex : Male

Marital Status : Married

Languages known : Tamil, English, Telugu, Hindi, Malayalam Nationality : Indian

Passport Details :-

Passport No : T6499825

Date of issue : 14/05/2019

Place of Issue : Riyadh

Date of Expiry : 13/05/2029

Declaration:-

I hereby declare that all the above information furnished by me is true to the best of my Knowledge.

Date:

(PRABAKAR.C )



Contact this candidate