Post Job Free
Sign in

Electrical Supervisor

Location:
Cebu City, Philippines
Posted:
September 18, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

Position Applied : Electrical Supervisor

PERSONAL DATA :

Name : Rodrigo Fernandez Abad

Present Address : Sangi, Calajoan, Minglanilla, Cebu, Philippines 6046

Mobile No.

: +63-935*******

Home No.

: +63- (32) -5209701

Email Add.

: *******.****@*****.***

Date of Birth

: May 10, 1962

Birth Place

: Cebu City

Citizenship

: Filipino

Civil Status

: Married

Religion

: Roman Catholic

Height

: 165 cm

Weight

: 123.5 lbs.

Sex : Male

Passport No. : P4318424B

Date Issued : Jan 07, 2020

Expiry Date : Jan 06, 2030

Place of Issue : Cebu City, Philippines

EDUCATIONAL BACKGROUND:

Highest Educational Attainment: College Graduate

Degree Course : Bachelor of Science in Electrical Engineering (BSEE)

October 1986

Government Licensure Examination Taken : Registered Master Electrician

September 2004

College

: University of Cebu

Cebu City Philippines 1981 – 1986

High School

: Minglanilla Gullas High School

Minglanilla, Cebu 1974 – 1978

Elementary

: Lawaan Elementary School

Lawaan, Talisay City 1968 – 1974

WORK EXPERIENCE:

Company : Residential, Building and Industrial Electrical Works

Inclusive Date : January 08, 2016 to present

Position : Subcontractor and Overall In charge Job Description :

Act as overall in charge of electrical works for residential, building and industrial firms.

Scope of work covers lighting system, convenience outlets, ACU (window & split type),water heaters, LV transformers, GENSETS, pump motors, paging system, fire suppression system, burglar alarm system, public address and CCTV’s. Testing and commissioning.

Company : Firstsource Solutions Ltd.- ISS Facility Services

Company Address : IT Park, Lahug,Cebu City, Philippines

Inclusive Date : July 24, 2015 – December 15, 2015 Position : Technical Supervisor Job Description :

Act as third party maintenance facility manager for a BPO company.

Scope of works covers electrical, mechanical and civil works.

In charge of installation and maintenance of personal computers, lightings,

convenience outlets, split type air conditioning units,magnetic doorlocks, badge readers,turnstiles, CCTV’s, paging system,FDAS, fire suppression systems, smoke detectors, sprinklers,

pump motors,UPS, distribution transformers and alarms.

Coordinate with suppliers in quarterly scheduled PMS.

In charge of on call services for operations and offices.

Act as lead for 12 technicians.

Company : KENTZ ENGINEERS & CONSTRUCTORS

Exxon Mobil/ CB&I Clough JV PNG LNG EPC PROJECT (Hides Gas Conditioning Plant) Tari, Hides, Papua New Guinea

Company Address : Suite J-05-13 Block J, Solaris Mont Kiara, Jalan Solaris.

50480 Kuala Lumpur, Malaysia

Inclusive Date : September 20, 2013 up to December 29, 2013 Position : E/I Supervisor Job Description :

Reporting directly to the E/I Superintendent.

Scope of works covers all electrical (HV/LV), and instrumentation installation in

LNG

process plant liquefaction and industrial areas.

Project and design implementation in site.

Act as trainor to local personnel.

Hands on and supervision to a group 3 foremen and 21 technicians.

See to it that all activities conform and in accordance with company’s QA/QC and HSE Departments.

Coordinate with Engineering Department in as-built and project modifications.

In charge of everyday Safety JHA and work permit for the team.

Permitting and documentations.

Pre-commissioning and commissioning.

Company : OCEANAGOLD PHILS.,INC. (Gold Mining Process Plant)

Company Address : Didipio, Kasibu, Nueva Viscaya

Inclusive Date : September 28, 2012 up to December 31, 2012

Position : Electrical Supervisor

Job Description

Reporting directly to the Electrical Area Manager.

Supervise the electrical and instrumentation contractors overall operations With emphasis on QA/QC, HSE and ENGINEERING standards.

Assist with scheduling and project delivery on time and on budget.

Participate in actual construction and installation as per design and as built modifications pertaining to electrical (HV/LV), LER’S, MCC’S, substations, process instruments, transmission lines (4.160kv), communications, fiber optics, public address, CCTV and plant wide grounding system. Hands-on field work as required to meet the expected targets.

Attend all company meetings as required.

Comply all company directives and policies.

Ensure monitoring that costs are within the budget and specifications.

Coordinate with local government units/agencies if deemed necessary.

Perform other related duties that may be assigned or required.

Permitting and documentations.

Pre-commissioning and commissioning.

Company : SAIPEM/ GPS - GNL 3Z PROJECT (LNG Mega Process Plant)

Company Address : Arzew, Algeria

Inclusive Date : April 18, 2011 up to July 18, 2012 Position : Electrical Supervisor (Off- Site) Job Description :

Reporting directly to the Electrical Superintendent.

In charge of design and project implementation in site as per company’s standard procedure pertaining to electrical, instrumentation, substations, MCC’S, GTG’S cathodic protection system, CCGT, communications, heat tracing and plant wide grounding system.

See to it that subcontractor activities are carried out in accordance with the company specifications and procedures and that the quality of works performed meet these expectations.

To fully ensure that all construction activities are in compliance with company’s Engineering,QA/QC and HSE requirements.

Monitor and report site progress to direct superiors.

Monitor and oversee all construction activities.

Permitting and documentations.

Pre-commissioning and commissioning.

Company : Tekfen-TML Joint Venture – Great Manmade River Project

Company Address : Ganfouda Area, Km. 15, Benghazi, Libya

Inclusive Date : February 1, 2009 up to February 14, 2010

Position : Electrical Site Engineer ( Cathodic Protection )

Job Description : Experience in Electrical and Cathodic Protection/Corrosion works. Had worked in construction, pre-commissioning and final commissioning of sacrificial and impressed current system. In my present job, I am highly proficient in a wide range of specialized testing.

Close Interval Potential Survey (CIPS)

Direct Current Voltage Gradient (DCVG)

Pipe to Soil Potential testing

Anode Current Measurements

Long Line Current Survey

Pipe Resistance Check

Soil Resistivity Survey

Stray Current Interference Testing

Pin Brazing and Stud Weld Test

Steel to Mortar Potential Test

Initial PCCP Static Potential measurement

Initial Open Circuit Potential Test

Current Measurement for Anode Ground bed

Open Circuit Measurement of Ground bed Field Data Encoding and Calculation

Pre-commissioning and commissioning.

Company : Consolidated Contractors Company W.L.L.

Independent Water & Steam Power Plant Project

Company Address : Rabigh, KSA

Inclusive date : June 8, 2007 up to January 3, 2008 Position : Chargehand Electrical / Instrumentation Job Description :

In charge of installations of electrical, instrumentations, HVAC, communications and fire suppression sytem.

CCGT (gas and steam turbines)

In charge of material acquisitions, job distribution and manpower arrangement for electrical and instrumentation technicians.

On site inspection on actual execution and control of electrical and instrumentation projects in accordance with the scope of works, planning, quality, safety and company procedures.

Prepare daily accomplishment reports for today and to date.

Plan and request required manpower, equipments and materials for the project in a timely manner.

Promote and execute safety and quality programs on site.

Work harmoniously with client and with multinational co-workers. Pre-commissioning and commissioning.

Company : Forum Exploration Inc. ( Coal Mining Project)

Company Address : Uling, City of Naga Cebu, Philippines

Inclusive date : September 4, 2006 up to November 15, 2006 Position : Electrical Shift Foreman Job Description :

In charge of installations and maintenance of all existing electrical equipments both surface and underground. Equipments such as compressors, gensets, pump motors, cap lamps, chargers, transformers, blowers, conveyors, welding machines, sub-station and lighting facilities.

In charge of on call services, work requisitions and modifications for mine operations and inter departments.

Prepare daily accomplishment reports.

Promote and execute safety rules and regulations.

Company : Taiheyo Cement Philippines Incorporated

Company Address : San Fernando, Cebu, Philippines

Inclusive date : January 6, 1997 up to August 1, 2006 Position : Electrical Leadman Job Description :

AC motors reconditioning. ( dismantling and assembly of AC motors from fractional to 100Hp ) for power plant project. Testing and recording of actual configurations.

Electrical and instrumentations installations plant wide. These includes transformer banking, switchgears(medium & high-voltage),AC motors, DC motors, synchronous motors, frequency inverter drives (VFD), reactors, grid resistors, static capacitors, liquid rheostat, ball mills, conveyors, bucket elevators, MCC, meters, transmitters, actuators, thermocouples, RTDs, level switches (rotary, floatless and sounding radars), beltscales and weighfeeders.

In charge of upgrading, new projects and modifications plantwide.

Controller wirings.

Have sufficient knowledge in PLC and DCS operations.

High-tension cable termination 4.160Kv – 69Kv.

Low and medium voltage termination.

Cabling, conduiting, panelling and cable tray installations as per plan Testing and commissioning.

Maintenance activities plantwide.

Company : Subcontractor (House & Building Wiring)

Company Address : Cebu City Philippines

Inclusive date : May 20, 1989 up to December 28, 1996 Position : Electrical Foreman Job Description :

In charge of installations of convenience outlet, water heaters, pump motors,airconditioning units (window & slit type), paging systems, communication systems, fire fighting systems, CCTV & lighting facilities. Testing and commissioning.

Company : Atlas Consolidated Mining & Development Corporation

Company Address : Aroroy, Masbate Philippines

Inclusive date : January 16, 1987 up to March 15, 1989 Position : Electrician Job Description :

Installation and maintenance of all electrical equipments and facilities both surface and underground. Equipments such as sub-stations, transformers, stationary and portable compressors, pump motors, shovels, blowers, generators, AC motors, locomotives, caplamps, chargers, welding transformers, and lighting facilities.

TRAINING AND SEMINARS :

Elementary Fist Aid For Mine Underground Personnel

Atlas Consolidated Mining & Development Corporation

Aroroy, Masbate, Philippines April 23-24, 1987

MS Spreadsheet Fundamentals Course

Overseas Workers Welfare Administration

Cebu City, Philippines May 16-17, 2008

Excavation Safety Training

Tekfen-TML Joint Venture

Tazerbo, Libya July 03, 2009

Safety Lifting Operation Training

Tekfen-TML Joint Venture

Tazerbo, Libya July 10, 2009

Transportation Safety Training

Tekfen-TML Joint Venture

Tazerbo, Libya July 17, 2009

Defensive Driving Training

Tekfen-TML Joint Venture

Tazerbo, Libya

July 24-25, 2009

Fire Safety Training

Tekfen-TML Joint Venture

Tazerbo, Libya July 31, 2009

First Aid & CPR Training

Tekfen-TML Joint Venture

Tazerbo, Libya

August 7-8, 2009

Safety In Confined Space

Tekfen-TML JOINT venture

Tazerbo, Libya

August 14, 2009

CHARACTER REFERENCE :

Engr. Cezar P. Fernnadez (PEE) Manager - E/I Engineering Dept. Taiheiyo Cement Philippines Incorporated

San Fernando, Cebu, Philippines

Email : **.*********@*****.***

Cell No. : +639*********

Mr. Sergio Pischida

Superintendent – Electrical Dept. Saipem – Algeria Arzew, Algeria.

Email : ******.********@******.***

Cell No. : +213*********



Contact this candidate