CURRICULUM VITAE
Position Applied : Electrical Supervisor
PERSONAL DATA :
Name : Rodrigo Fernandez Abad
Present Address : Sangi, Calajoan, Minglanilla, Cebu, Philippines 6046
Mobile No.
Home No.
: +63- (32) -5209701
Email Add.
: *******.****@*****.***
Date of Birth
: May 10, 1962
Birth Place
: Cebu City
Citizenship
: Filipino
Civil Status
: Married
Religion
: Roman Catholic
Height
: 165 cm
Weight
: 123.5 lbs.
Sex : Male
Passport No. : P4318424B
Date Issued : Jan 07, 2020
Expiry Date : Jan 06, 2030
Place of Issue : Cebu City, Philippines
EDUCATIONAL BACKGROUND:
Highest Educational Attainment: College Graduate
Degree Course : Bachelor of Science in Electrical Engineering (BSEE)
October 1986
Government Licensure Examination Taken : Registered Master Electrician
September 2004
College
: University of Cebu
Cebu City Philippines 1981 – 1986
High School
: Minglanilla Gullas High School
Minglanilla, Cebu 1974 – 1978
Elementary
: Lawaan Elementary School
Lawaan, Talisay City 1968 – 1974
WORK EXPERIENCE:
Company : Residential, Building and Industrial Electrical Works
Inclusive Date : January 08, 2016 to present
Position : Subcontractor and Overall In charge Job Description :
Act as overall in charge of electrical works for residential, building and industrial firms.
Scope of work covers lighting system, convenience outlets, ACU (window & split type),water heaters, LV transformers, GENSETS, pump motors, paging system, fire suppression system, burglar alarm system, public address and CCTV’s. Testing and commissioning.
Company : Firstsource Solutions Ltd.- ISS Facility Services
Company Address : IT Park, Lahug,Cebu City, Philippines
Inclusive Date : July 24, 2015 – December 15, 2015 Position : Technical Supervisor Job Description :
Act as third party maintenance facility manager for a BPO company.
Scope of works covers electrical, mechanical and civil works.
In charge of installation and maintenance of personal computers, lightings,
convenience outlets, split type air conditioning units,magnetic doorlocks, badge readers,turnstiles, CCTV’s, paging system,FDAS, fire suppression systems, smoke detectors, sprinklers,
pump motors,UPS, distribution transformers and alarms.
Coordinate with suppliers in quarterly scheduled PMS.
In charge of on call services for operations and offices.
Act as lead for 12 technicians.
Company : KENTZ ENGINEERS & CONSTRUCTORS
Exxon Mobil/ CB&I Clough JV PNG LNG EPC PROJECT (Hides Gas Conditioning Plant) Tari, Hides, Papua New Guinea
Company Address : Suite J-05-13 Block J, Solaris Mont Kiara, Jalan Solaris.
50480 Kuala Lumpur, Malaysia
Inclusive Date : September 20, 2013 up to December 29, 2013 Position : E/I Supervisor Job Description :
Reporting directly to the E/I Superintendent.
Scope of works covers all electrical (HV/LV), and instrumentation installation in
LNG
process plant liquefaction and industrial areas.
Project and design implementation in site.
Act as trainor to local personnel.
Hands on and supervision to a group 3 foremen and 21 technicians.
See to it that all activities conform and in accordance with company’s QA/QC and HSE Departments.
Coordinate with Engineering Department in as-built and project modifications.
In charge of everyday Safety JHA and work permit for the team.
Permitting and documentations.
Pre-commissioning and commissioning.
Company : OCEANAGOLD PHILS.,INC. (Gold Mining Process Plant)
Company Address : Didipio, Kasibu, Nueva Viscaya
Inclusive Date : September 28, 2012 up to December 31, 2012
Position : Electrical Supervisor
Job Description
Reporting directly to the Electrical Area Manager.
Supervise the electrical and instrumentation contractors overall operations With emphasis on QA/QC, HSE and ENGINEERING standards.
Assist with scheduling and project delivery on time and on budget.
Participate in actual construction and installation as per design and as built modifications pertaining to electrical (HV/LV), LER’S, MCC’S, substations, process instruments, transmission lines (4.160kv), communications, fiber optics, public address, CCTV and plant wide grounding system. Hands-on field work as required to meet the expected targets.
Attend all company meetings as required.
Comply all company directives and policies.
Ensure monitoring that costs are within the budget and specifications.
Coordinate with local government units/agencies if deemed necessary.
Perform other related duties that may be assigned or required.
Permitting and documentations.
Pre-commissioning and commissioning.
Company : SAIPEM/ GPS - GNL 3Z PROJECT (LNG Mega Process Plant)
Company Address : Arzew, Algeria
Inclusive Date : April 18, 2011 up to July 18, 2012 Position : Electrical Supervisor (Off- Site) Job Description :
Reporting directly to the Electrical Superintendent.
In charge of design and project implementation in site as per company’s standard procedure pertaining to electrical, instrumentation, substations, MCC’S, GTG’S cathodic protection system, CCGT, communications, heat tracing and plant wide grounding system.
See to it that subcontractor activities are carried out in accordance with the company specifications and procedures and that the quality of works performed meet these expectations.
To fully ensure that all construction activities are in compliance with company’s Engineering,QA/QC and HSE requirements.
Monitor and report site progress to direct superiors.
Monitor and oversee all construction activities.
Permitting and documentations.
Pre-commissioning and commissioning.
Company : Tekfen-TML Joint Venture – Great Manmade River Project
Company Address : Ganfouda Area, Km. 15, Benghazi, Libya
Inclusive Date : February 1, 2009 up to February 14, 2010
Position : Electrical Site Engineer ( Cathodic Protection )
Job Description : Experience in Electrical and Cathodic Protection/Corrosion works. Had worked in construction, pre-commissioning and final commissioning of sacrificial and impressed current system. In my present job, I am highly proficient in a wide range of specialized testing.
Close Interval Potential Survey (CIPS)
Direct Current Voltage Gradient (DCVG)
Pipe to Soil Potential testing
Anode Current Measurements
Long Line Current Survey
Pipe Resistance Check
Soil Resistivity Survey
Stray Current Interference Testing
Pin Brazing and Stud Weld Test
Steel to Mortar Potential Test
Initial PCCP Static Potential measurement
Initial Open Circuit Potential Test
Current Measurement for Anode Ground bed
Open Circuit Measurement of Ground bed Field Data Encoding and Calculation
Pre-commissioning and commissioning.
Company : Consolidated Contractors Company W.L.L.
Independent Water & Steam Power Plant Project
Company Address : Rabigh, KSA
Inclusive date : June 8, 2007 up to January 3, 2008 Position : Chargehand Electrical / Instrumentation Job Description :
In charge of installations of electrical, instrumentations, HVAC, communications and fire suppression sytem.
CCGT (gas and steam turbines)
In charge of material acquisitions, job distribution and manpower arrangement for electrical and instrumentation technicians.
On site inspection on actual execution and control of electrical and instrumentation projects in accordance with the scope of works, planning, quality, safety and company procedures.
Prepare daily accomplishment reports for today and to date.
Plan and request required manpower, equipments and materials for the project in a timely manner.
Promote and execute safety and quality programs on site.
Work harmoniously with client and with multinational co-workers. Pre-commissioning and commissioning.
Company : Forum Exploration Inc. ( Coal Mining Project)
Company Address : Uling, City of Naga Cebu, Philippines
Inclusive date : September 4, 2006 up to November 15, 2006 Position : Electrical Shift Foreman Job Description :
In charge of installations and maintenance of all existing electrical equipments both surface and underground. Equipments such as compressors, gensets, pump motors, cap lamps, chargers, transformers, blowers, conveyors, welding machines, sub-station and lighting facilities.
In charge of on call services, work requisitions and modifications for mine operations and inter departments.
Prepare daily accomplishment reports.
Promote and execute safety rules and regulations.
Company : Taiheyo Cement Philippines Incorporated
Company Address : San Fernando, Cebu, Philippines
Inclusive date : January 6, 1997 up to August 1, 2006 Position : Electrical Leadman Job Description :
AC motors reconditioning. ( dismantling and assembly of AC motors from fractional to 100Hp ) for power plant project. Testing and recording of actual configurations.
Electrical and instrumentations installations plant wide. These includes transformer banking, switchgears(medium & high-voltage),AC motors, DC motors, synchronous motors, frequency inverter drives (VFD), reactors, grid resistors, static capacitors, liquid rheostat, ball mills, conveyors, bucket elevators, MCC, meters, transmitters, actuators, thermocouples, RTDs, level switches (rotary, floatless and sounding radars), beltscales and weighfeeders.
In charge of upgrading, new projects and modifications plantwide.
Controller wirings.
Have sufficient knowledge in PLC and DCS operations.
High-tension cable termination 4.160Kv – 69Kv.
Low and medium voltage termination.
Cabling, conduiting, panelling and cable tray installations as per plan Testing and commissioning.
Maintenance activities plantwide.
Company : Subcontractor (House & Building Wiring)
Company Address : Cebu City Philippines
Inclusive date : May 20, 1989 up to December 28, 1996 Position : Electrical Foreman Job Description :
In charge of installations of convenience outlet, water heaters, pump motors,airconditioning units (window & slit type), paging systems, communication systems, fire fighting systems, CCTV & lighting facilities. Testing and commissioning.
Company : Atlas Consolidated Mining & Development Corporation
Company Address : Aroroy, Masbate Philippines
Inclusive date : January 16, 1987 up to March 15, 1989 Position : Electrician Job Description :
Installation and maintenance of all electrical equipments and facilities both surface and underground. Equipments such as sub-stations, transformers, stationary and portable compressors, pump motors, shovels, blowers, generators, AC motors, locomotives, caplamps, chargers, welding transformers, and lighting facilities.
TRAINING AND SEMINARS :
Elementary Fist Aid For Mine Underground Personnel
Atlas Consolidated Mining & Development Corporation
Aroroy, Masbate, Philippines April 23-24, 1987
MS Spreadsheet Fundamentals Course
Overseas Workers Welfare Administration
Cebu City, Philippines May 16-17, 2008
Excavation Safety Training
Tekfen-TML Joint Venture
Tazerbo, Libya July 03, 2009
Safety Lifting Operation Training
Tekfen-TML Joint Venture
Tazerbo, Libya July 10, 2009
Transportation Safety Training
Tekfen-TML Joint Venture
Tazerbo, Libya July 17, 2009
Defensive Driving Training
Tekfen-TML Joint Venture
Tazerbo, Libya
July 24-25, 2009
Fire Safety Training
Tekfen-TML Joint Venture
Tazerbo, Libya July 31, 2009
First Aid & CPR Training
Tekfen-TML Joint Venture
Tazerbo, Libya
August 7-8, 2009
Safety In Confined Space
Tekfen-TML JOINT venture
Tazerbo, Libya
August 14, 2009
CHARACTER REFERENCE :
Engr. Cezar P. Fernnadez (PEE) Manager - E/I Engineering Dept. Taiheiyo Cement Philippines Incorporated
San Fernando, Cebu, Philippines
Email : **.*********@*****.***
Cell No. : +639*********
Mr. Sergio Pischida
Superintendent – Electrical Dept. Saipem – Algeria Arzew, Algeria.
Email : ******.********@******.***
Cell No. : +213*********