` +356-******** **************@*****.***
Page * of 4
MEP & HVAC certified Electrical engineer with 4 years experience as Lead electrical engineer - Electrical construction
Currently working in CE INSTALLATIONS as M&E Engineer
Strong knowledge in MEP Site Handling and Quantity Surveying
Knowledgeable in analyzing drawings and single line diagrams for Electrical, plumbing, HVAC, Fire alarm and Firefighting works and systems
Knowledgeable in Electrical, Plumbing and HVAC design
Familiar with National & International codes/standards (NEC, IEC, IEEE, NFPA) Career Objectives
I seek a MEP Project Engineer/Quantity Surveyor/Electrical Engineer position within your esteemed establishment to enhance my skills and possibilities.
Core Competencies
• Manpower management skills
• Excellent communicator with client dealing skills
• Electrical design & schedule preparation
• Team Coordination / Leadership Skills
• Safety Management
• Prepare Reports and implement product
improvements
Education
Bachelor of Technology – Electrical & Electronics Engineering April 2014 Cochin University of Science and Technology, KERALA, India Additional courses & certifications
MEP-Electrical Systems Design and Drafting Certification Taiba Electrical Consultants- (An ISO 9001-2008 Certified Institution) India November 2014 MEP-HVAC Systems Design and Drafting Certification Aghora Design Academy- (An ISO 9001-2008 Certified Institution) India March 2015 Software Proficiency
• Autocad
• MS Office
• CGLux
• MS Excel
AMAL CHANDRAN JC
MSID
MSIDA, MALTA
+356 - 77605760
**************@*****.***
www.linkedin.com/in/amal-chandran-jc-
b78804135/https://www.linkedin.com/in/amal-
` +356-******** **************@*****.***
Page 2 of 4
Area of Experience
1. Strong Knowledge in AutoCAD drawings.
2. Performed quantity take-offs and analyzed raw materials for electrical installations before and after installation to reduce wastage and ensure maximum yield 3. Quantification of Variations as per revised drawings / specification and follow-up with Main Contracts / Project Managers for Site Work Instruction.
4. Responsible for installation, commissioning, and maintenance of electrical equipment such as: transformers, generators, motors etc. in high rise buildings and commercial complexes 5. Supervised electrical system installations such as: PVC conduits, bus bars with tap-offs, cable trays and ladders, feeder cables, panel boards, MCC panels, electrical MDB’s, Earthing & lightning arrestor system, lighting, and power system wiring
6. Reviewed suppliers for quality, cost, and responsiveness, making changes where necessary to create a more streamlined process for the company
7. Engineering Support to Procurement of Materials and Components 8. Send enquiries, analyze prices, prepare material, and labor cost estimation and bid price 9. Coordinated with Architects, Mechanical and civil Engineers to discuss technical aspects of electrical systems with the Contractor towards successful completion of project Employment Summary
CE INSTALLATIONS, MALTA – Mechanical&Electrical Engineer (Sep 2019 –Ongoing) Currently employed as Electrical and MEP Engineer. Site handling, Coordination, and quantity surveying for Electrical, Mechanical (Plumbing and Hvac System).
• Performed Quantity take off
• Performed Proper Site man management.
• Preparation of program of works.
• Proper dealing with clients.
• Preparation of as fit drawings.
Project Details
Civil Service Sports Club-Valletta-Handed Over.
Aula Magna University-Valletta-Handed Over
Cavalier Hotel (Refurbishing)-Handed over
Fortina Redevelopmet,Sliema-Ongoing
Zetjun Block 3-Handed over
Zetjun Block 4-Ongoing
` +356-******** **************@*****.***
Page 3 of 4
Emitech Technical Services llc, Dubai – Electrical and MEP Engineer (Feb 2018 –April 2019) Employed as Electrical and MEP Engineer. Site handling for HVAC, Plumbing, Firefighting, Fire protection, CCTV, BMS, Public addressing systems and Electrical systems.
• Prepared BOQ preparations, verifications, and finalizations
• Performed Quantity take off
• Send enquiries, analyze prices, prepare comparison
• Conducted technical assessments on previously installed incomplete MEP systems in site in order to take the necessary decisions regarding the sustainability of each system • Project Details
G+3 GEMS VERTUS SCHOOL, AL WAHA-80% Complete
G+4, ACCOMODATION BUILDING, DIP, DUBAI-Handed over
AL SALAM SCHOOL, AL QUASAIS, Dubai-30% Complete
Aghora Design Academy-HVAC Engineer (from March 2017 to August 2017) From March 2017 to August 2017 with Aghora Design Academy, served as an HVAC Engineer – Site Supervision, commissioning, and Maintenance of electrical systems. Growth Path: Initially employed as a site engineer and ascended to be a Lead Engineer – installation, commissioning, startup & Maintenance Hvac systems
As Site Engineer (Electrical Engineer) (from March 2017 to August 2017)
• Leading/Managing installation, commissioning & Maintenance of Chillers, FAHU and Chill water pipes.
• Excellent communicator with ability to liaise with clients of diverse fields; work with cross-functional and multi- disciplinary teams and guide teams in achieving engineering goals and business objectives in time-sensitive environments
• Supporting effective Scheduling / Planning the sequence of installation and start up with customer for on time completion of project.
• Led troubleshooting of complex system problems using strong problem-solving techniques. • Completion of project up to Commercial operation of the whole project
• Resource / material /project planning for a fast track project.
• Experience in codes and standards such as SMACNA Project details
G+7 HIGH RISE MALL (RP Mall Kollam)
Architrendz Design Team – Electrical Engineer (May 2015 – November 2016) From May 2015 to November 2016 employed as Engineer. Site handling for Hvac, Plumbing, Firefighting, Fire protection, CCTV, BMS, Public addressing systems and Electrical systems.
• Prepared Material request followed up LPO.
• Performed Quantity take off
• Send enquiries, analyze prices, prepare comparison
• Conducted technical assessments on previously installed incomplete MEP systems in site in order to take the necessary decisions regarding the sustainability of each system • Project Details
G+3 Shopping Complex, Karunagappally-Handed over
G+13 Residential Flat-Handed over
` +356-******** **************@*****.***
Page 4 of 4
Reference
Praveen Tiwari,
Project Manager
Emitech Technical Services L.L.C
Dubai-
United Arab Emirates
Email: *******@************.***
Tel: ( +971-*********)
Personal Details
Date of Birth 31-08-1992
Marital Status Married.
Languages Known English, Hindi, Malayalam, Tamil
Nationality India