Post Job Free

Resume

Sign in

Mechanical Engineer Design

Location:
Dammam, Eastern, Saudi Arabia
Salary:
28000
Posted:
September 15, 2020

Contact this candidate

Resume:

Amr Baraka *

CURRICULUM VITAE

Amr Baraka

CEng MIMechE, CEM®, Senior Associate Mechanical Engineer

E-Mail Address: adf4hq@r.postjobfree.com

adf4hq@r.postjobfree.com

Date of Birth : 15-7-1978

Nationality: Egyptian

Residence Egypt: 9 Hosni Ahmed Khalaf, Neser City

Mob. : +202 012********\+966-*********

Website: https://www.linkedin.com/in/amr-baraka-0a27a066/ Amr Baraka 2

OBJECTIVE

Senior Associate Mechanical Engineer designer position where my qualifications are challenged, developed & enhanced. Engaging challenging projects of mechanical systems design. BACKGROUND

Over 20 years of experience, detail oriented, highly creative, talented and enthusiastic Mechanical Engineer and with vast expertise in Qatar, UAE, KSA, Egypt, TRIPOLI and Kuwait. Excellent design skills, illustrating concepts and construction drawings. Took part in multi scale national and international competitions, taking part in all stages of design and decision making, took responsibility for developing design plans & construction documents. Always updating my skills with the latest subjects related to design trends and high-end software solutions (ANSYS). And currently proceeding PhD’s degree in the field of Renewable Energy especially Wave Energy Harvesting

KEY ACHIEVEMENTS

I. Aesthetically pleasing and innovative Mechanical ideas which brought in a multitude of clients from Dubai, Qatar, KSA, Libya And Kuwait

II. Revolutionary changes in Quality of Design and presentation and developing new skills to the staff for legacy development.

III. Developed the companies Drawings Quality by reducing human errors and reducing the need of new employments due to using the high-end softwares and techniques in drawing publishing.

IV. Boosted the company’s earnings by gaining the trust of multiple clients owing to new interactive

V. Presentation techniques that was efficient, pleasing and professional, along with the quality design.

EDUCATION

2017 CERTIFIED ENERGY MANGER, CEM®

2016 PRE PhD DEGREE

Faculty of Engineering / Ain Shams University

2016 Member of the Institution of Mechanical Engineers.(CHARTERED ENGINEER, CEng MIMechE)

2014 PRE MASTER OF SCIENCE DEGREE (M.Sc.)

Risk Engineering Master

Faculty of Engineering / Cairo University

2005 MASTER OF SCIENCE DEGREE (M.Sc.)

Faculty of Engineering / Zagazig University

Major: Mechanical Power Engineering

Amr Baraka 3

Thesis Title: ELECTRO-HYDRAULIC PROPORTIONAL CONTROL VALVE

2000 BACHELOR OF MECHANICAL ENGINEERING

Faculty of Engineering / Zagazig University

Major: Mechanical Power Engineering

Graduation project: Design of lifting pumping station and crude oil piping line

Grade: excellent

Cumulative grade: very good

DUTIES

Conceptual Design, Preliminary Design, Schematic design, Detailed Design, Designs enabling Green Building concepts, Value engineering studies, cost analysis and estimates,Preparation of Bill of quantities, Preparation of Technical specification, Coordination with other services, Preparation and Checking of Drawings, Preparation of calculation sheet in Microsoft Excel underlying Codes and Standards (ASHARE, BS),leading a team for design review for projects internal (DAR) as a quality control or external ( from other consultants), Reviewing material submittals, Shop drawing, BID technical Evaluation, replying RFI and project design coordinator. SKILLS

Fluent in English (oral and written)

Detailed knowledge in Mechanical working drawings

Proficient in use of computer-assisted design techniques

Detailed knowledge of and practical experience in design

Proficient in creating design reports

Updated sustainable approaches and time saving, job techniques

Detailed knowledge of and practical experience in design

Team leader and player

To sustain working under pressure

Good communication and interpersonal skills

Able to maintain cooperative relationship with engineers and other professionals

Capable to clearly express own ides

Strong observation abilities

Extremely detail oriented

Superb Windows9X, Windows2007, Windows Vista, Linux, Unix, MS DOS, Windows ME, Windows XP knowledge

Outstanding presentation and analytical skills

Always ready to work with technical team

Capable to create and maintain professional work environment

Capacity to work during day and night and ability to meet deadlines

Exceptional drawing and architecture skills

Amr Baraka 4

Knowledge to use Auto Cad

Solid ability to identify and solve technical issues PROFESSIONAL EXPERTISE

MEP Technical Manager, KCC,2019 till Now

MEP Technical Manager (Mechanical and Electrical Technical Department Head) for one of the recognized Contactor KCC, ALKIFAH Contractor in Dammam for one of recognized project in Dahran, King Fahd University for Petroleum and Mining, Business Park Project. The total planned GFA for KFUPM Business park is approximately 237,082 sq.m. This will represent a total development FAR of around 1.84.

Lead Mechanical Engineer, FAEC,2018 till 2019

Lead Mechanical Engineer (Mechanical Department Head) for one of the recognized consultant in Royal Commission of Yanbu and Jubail working with Bechtel and Parssons as Reviewers. Many contracts with project tasks in main Royal Commission cities(Jazan,Yanbu,Jubail) 1. HOP 8 Compound with 400 Villa Based in Yanbu

2. HOP 9 Compound with more than 800 Villas based in Yanbu and with Smart Home Technology

3. Environmental Building in Jazan with latest LABS Technology 4. Lifting Station for Environmental Building in Jazan 5. Recreation Building in Jazan with swimming pools 6. Siemens Electrical Substations in Yanbu, 11k and 111s working as Project Manger 7. Marfiq Steel Warehouse working as Project Manger 8. Fire Staion of Yanbu City

9. Al Murjan Palace, Princess Palace in Yanbu.

10. Pedestrian Bridge working as Project Manger

Senior Mechanical Engineer, Dar Al Handasa Cairo, 2007 till 2018 March 2007 BURJ AL BAHER PROJECT TRIPOLI

The project is a high rise mixed occupancy development that consists of 3 towers and a podium. Towers are designed as follow: 1. A hotel tower with 25 floor

2. An Apartments tower with 23 floor

3. An office tower with 27 floor

Team leader responsible for preparing Conceptual Design and reports, Preliminary Design, Preparation of Technical specification,Coordination with other services for VAC, Plumbing,FireFighting and special Mechanical systems(District Cooling and Heating plant,Kitchens, Laundry

,Four Seasons requirements (Hotel operator)) services for the building

,Libya

Amr Baraka 5

April 2007 XB1/BLD/445-DWC FACILITY MANAGEMENT BUILDING Office building of 6 floors and 3250 m2 and repair shop for buses Project engineer responsible for preparing Conceptual Design and reports, Preliminary Design, Preparation of Bill of quantities, Preparation of Technical specification, Detailed Design, Coordination with other services for VAC, and special Mechanical systems(LEED aspects, special ventilation system for buses(Exhaust Hose Reel)) services for the building

,UAE

November 2007 FACILITY MANAGEMENT BUILDINGS, DOHA, PEARL QATAR Services building facilities for pearl Qatar consists of: 1. Fire Station

2. Medical Centre

3. Central Laundry

4. Central Kitchen

5. Work Shops

6. Administration Building with Data Center

Team leader responsible for preparing Conceptual Design and reports, Preliminary Design, Preparation of Bill of quantities, Preparation of Technical specification, Detailed Design, Coordination with other services for VAC, Plumbing,FireFighting and special Mechanical systems(ETS

,Central Kitchens 20.000 meal per day, Laundry, Data Center) services for the building,Qatar

October 2007 THE AL GURRM UAE

Project is a prestigious water front development on a unique site created by major earthworks and extensive landscaping.

Project engineer responsible for preparing Conceptual Design, Preliminary Design, Detailed Design, Preparation of Bill of quantities, Preparation of Technical specification, Coordination with other services for VAC services for the many buildings inside the project, UAE

May 2008 SARAYA ISLANDS BANYAN TREE HOTEL AND SPA RESORT RAS AL-KHAIMAH

Project is a prestigious water front development on a unique site created by major earthworks and extensive landscaping.

Project engineer responsible for preparing Conceptual Design, Preliminary Design, UAE

February 2008 ORTHOPEDIC SPECIALIZED HOSPITAL, JEDDAH KSA Orthopedic Specialized Hospital 250 bed located at Jeddah, Project engineer responsible for preparing Conceptual Design and reports, Preliminary Design, Preparation of Technical specification, Coordination Amr Baraka 6

with other services for VAC, special Mechanical systems(Labs,Operation Rooms, Central Kitchens, Data Center) services for the Hospital, KSA. May 2008 JABEL OMAR. MAKKA, KSA

Residential towers around Al-Haram Makka around 24 towers with central laundry and district cooling plant.

Project engineer responsible for preparing Conceptual Design, Preliminary Design, Detailed Design, Coordination with other services for VAC and special Mechanical systems (Laundry, Steam Boilers, Gray water treatment) services for PLOT#1 and Central Laundry buildings. January 2009 INTERNATIONAL HUMANITARIAN CITY AT DUBAI WORLD CENTERAL

master plan includes the following:

1- One office building for the IHC headquarters.

2- 6 other office buildings.

3- The UN Building.

4- 17 UN warehouse & NGO’s

5- 11 Commercial warehouse Buildings.

6- HRD (Humanitarian Response Depot)

7- Amenity Areas.

Project engineer responsible for preparing Conceptual Design and reports, Preliminary Design, Preparation of Bill of quantities, Preparation of Technical specification, Detailed Design, Coordination with other services for VAC, Plumbing,FireFighting and special Mechanical systems(LEED aspects, special ventilation system for warehouses, Gray water system treatment) services for the building,UAE

February 2009 RIYADH FEMALE COLLEGES PART OF KING SAUD UNIVERSITY FOR HEALTH SCIENCE, RIYADH

Team leader responsible for preparing Conceptual Design, Preliminary Design, Detailed Design, Preparation of Bill of quantities, Preparation of Technical specification, Coordination with other services for HVAC, Plumbing,Firefighting and medical gas services for college of female Nursing and female medicine as part of King Saud University for Health Science, Riyadh

May 2009 KING ABDUL-AZIZ SPECIALIZED CHILDREN’S HOSPITAL, RIYADH KING SAUD specialist hospital for children 660 bed with area of 2000, 000 FT2 total tonnage of 7000 TON Refrigerant, and utility building. Team leader responsible for preparing Conceptual Design and reports, Preliminary Design, Preparation of Bill of quantities, Preparation of Technical specification, Detailed Design, Coordination with other services Amr Baraka 7

for VAC, special Mechanical systems(Labs,Operation Rooms, Central Kitchens, Data Center) services for the Hospital and for VAC, Plumbing

,FireFighting and special Mechanical systems(ETS,Steam Boilers, Clean Steam Generator, Water Tank,Steam & Chilled Water Pipes) services for the utility building,KSA

August 2009 UTILITY PLANT SERVING KING ABDUL-AZIZ SPECIALIZED CHILDREN’S HOSPITAL

Steam plant serving mainly KASH (King Abdul-Aziz Specialized Children’s Hospital) with clean steam 14200Kg/Hr. required for humidification and normal steam of 28000Kg/Hr. for heating purposes. Beside ETS room for chilled water system and water and firefighting water tanks and pump rooms.

Team leader responsible for preparing Conceptual Design and reports, Preliminary Design, Detailed Design, Preparation of Bill of quantities, Preparation of Technical specification, Coordination with other services for VAC, Plumbing,FireFighting and special Mechanical systems (Process of the steam and steam pipes buried for first time used in Riyadh). Riyadh December 2009 STRUCTURE PARKING S4 PART OF KING SAUD UNIVERSITY FOR HEALTH SCIENCE, RIYADH

3 floor for 1000 Car underground parking in KSA. Team leader responsible for preparing Conceptual Design and reports, Preliminary Design, Detailed Design, Preparation of Bill of quantities, Preparation of Technical specification, Coordination with other services for VAC, Plumbing, FireFighting and special Mechanical systems (Jet fans).Riyadh January 2010 Princess Nora University, Riyadh

Responsible for Reviewing submittals, Shop drawing, BID technical Evaluation for all mechanical Equipment’s for Support & Infrastructure for package P4APM System(including station and services facilities for metro)&and package P3(including Reception& Administration, Printing areas, Electro-Mechanical Plants & Infrastructure Mechanical plant(Generator plant, Chilled water plant,Pump and Water tank station

,Central kitchen)

March 2010 DISTRICT COOLING PLANT SERVING THIRD SAUDI EXTENSION With nominal capacity of 160,000Ton with Cooling Towers, 32 Centrifugal Chillers YORK TITAN with nominal capacity of 5000Ton each and 32 Primary 5000 GPM each 16 Secondary pump 10000 GPM each and 32 Condenser pump 15000 GPM.

Amr Baraka 8

Team leader responsible for preparing Conceptual Design and reports, Preliminary Design, Detailed Design, Coordination with other services for VAC, and special Mechanical systems (Process of the district cooling and pipes run in culvert around Haram). Makkah

May 2010 RITZ CARLTON, CAIRO

Team leader for Design and tender document review of VAC system designed by SHAKER Consulting, Egypt.

December 2010 DISTRICT COOLING PLANT SERVING NEW MASSAA 20,000TON REFRIGERANT

With nominal capacity of 20,000Ton with Air cooled Radiator, 4 Centrifugal Chillers YORK TITAN with nominal capacity of 5000Ton each and 4 Primary 5000 GPM each 2 Secondary pump 10000 GPM each and 4 Condenser pump 15000 GPM.

Team leader responsible for preparing Conceptual Design and reports, Preliminary Design, Detailed Design, Coordination with other services for VAC, and special Mechanical systems (Process of the district cooling and pipes run in culvert around Haram). Makka

January 2011 SECURITY PLOTS MAKKA, KSA

As part of Third Shamia expansion around Makka Haram and service towers (PLOT#1(8600 Person), PLOT#2(4300 Person), PLOT#3(6900 Person), PLOT#4(3200 Person)), of more than 30Floors for soldiers and officers.

Team leader responsible for preparing Conceptual Design and reports, Preliminary Design, Detailed Design, Coordination with other services for VAC, Plumbing,FireFighting and special Mechanical systems(Laundry, Kitchen, Steam Boilers, Gray water treatment and Garbage Vacuum system) services for PLOT#1

And Responsible for design review and reviewing submittals, Shop drawing, BID technical Evaluation all mechanical Equipment’s for

(PLOT#2,PLOT#3,PLOT#4) and also for hospital 350Bed attached to PLOT#1 building.

SECURITY PLOTS MAKKA DISTRICT COOLING PLANT, KSA

With nominal capacity of 3,000Ton, 10 Air Cooled Chillers YORK with nominal capacity of 300Ton each and 10 Primary 720 GPM each 6 Secondary pump 1440 GPM each.

Team leader responsible for preparing Conceptual Design and reports, Preliminary Design, Detailed Design, Coordination with other services for VAC, and special Mechanical systems. Makkah

Amr Baraka 9

June 2011 EXPANSION OF HARAM UTILITY SERVICES FOUR STEEL RESERVOIRS

Of a total capacity of 560,000 m3, with pump station 8 pumps with capacity of 210L/s.

Team leader responsible for preparing Conceptual Design and reports, Preliminary Design, Preparation of Bill of quantities, Preparation of Technical specification, Coordination with other services for VAC, Plumbing,FireFighting and special Mechanical systems(Pipes, reservoirs construction and surge tank) services for stations,KSA October 2011 DRAGON MALL AND HOTEL,DUBAI,AUE

Mega mall with area of 160,000m2 and Hotel 200 room inside Nakheel Project. Team leader responsible for preparing Conceptual Design and reports, Preliminary Design, Preparation of Bill of quantities, Preparation of Technical specification, Detailed Design, Coordination with other services for VAC, services for the Mall,UAE .

DRAGON MALL AND HOTEL DISTRICT COOLING PLANT,DUBAI

,AUE

With nominal capacity of 8000Ton with Cooling Towers, 4 Centrifugal Chillers with nominal capacity of 2000Ton each and 5 Primary VFD Pumps 3000 GPM each 5 Condenser pump 6000 GPM each.

Team leader responsible for preparing Conceptual Design and reports, Preliminary Design, Detailed Design, Coordination with other services for VAC, and special Mechanical systems. Dubai.

February 2012 DOHA METRO QRAIL

More than 8 prototype stations around Qatar. Team leader responsible for preparing Conceptual Design and reports, Preliminary Design, Coordination with other services for VAC and special Mechanical systems(tunnel ventilation and under platform exhaust(UPE) and over train exhaust(OTE)) services for stations, Qatar

July 2012 RIYADH METRO STATIONS

More than 12 prototype stations around Riyadh. Team leader responsible for preparing Conceptual Design and reports, Preliminary Design, Preparation of Technical specification, Coordination with other services for VAC and special Mechanical systems(tunnel ventilation and under platform exhaust(UPE) and over train exhaust(OTE)) services for stations

,KSA

December 2012 ABU DHABI SERVICES METRO BUILDING ETIHAD RAIL Amr Baraka 10

Team leader responsible for preparing Conceptual Design and reports, Preliminary Design, Coordination with other services for VAC, Plumbing

,FireFighting services for the building serving Metro,UAE January 2013 MAKKA METRO STATIONS

And Responsible for design review and reviewing submittals, Shop drawing, BID technical Evaluation all mechanical Equipment’s for Haramien Metro stations, Makka.

February 2013 POLICE & AIRWING FACILITIES AT DWC, DUBAI. Team leader responsible for preparing Conceptual Design and reports, Preliminary Design, Preparation of Bill of quantities, Preparation of Technical specification, Detailed Design, Coordination with other services for VAC, Plumbing,FireFighting services for the Office,UAE. March 2013 RESIDENCE AND SUITES, ABRAJ QURTIER TOWER AT THE PEARL QATAR

Team leader for Design review of VAC system designed by MZ & Partner Consulting.

April 2013 THIRD KING ABDULLAH SHAMYIAH & MATAF EXPANSION OF HOLY HARAM, MAKKAH-SAUDI ARABIA. (MEGA PROJECT)

The Air Conditioning and Ventilation systems Shamiyah Haram Expansion on a site area of 300,000 m with a Project budget around 60 Billion SR and all design works had been finished within 16 months and with a capacity of 50,000 TR and handling 5,000,000 CFM of cooled air. Including a world leading design of 6 Fresh Air Station with a capacity of 750,000 CFM. Stress analysis was carried out for the chilled water supply and return networks of 12’’ and 42’’ size.

And Responsible for design review and reviewing submittals, Shop drawing, BID technical Evaluation all mechanical Equipment’s for the building.

July 2013 AZURE PALM JUMEIRAH DUBAI, UAE

Residences, a collection of beachfront apartments and dining outlets overlooking the Arabian Gulf and Dubai’s world-famous landmarks. Team leader for Design and tender document review of VAC designed by DAR.

August 2013 DUBAI INTERNATIONAL AIRPORT EXPANSION-PHASE III SUPPORT FACILITY BUILDING - EK FLIGHT CATERING FACILITY 2

EXPANSION – DUBAI, UAE

Amr Baraka 11

Central Store, cold rooms and Administration offices. Team leader for Design and tender document review of VAC, Plumbing and Firefighting system designed by DAR.

August 2013 CLUB VISTA MARE DUBAI, UAE

New, beachfront residential and recreation project to be constructed on Dubai's Palm Jumeirah. Team leader for Design and tender document review of VAC, Plumbing and Firefighting system designed by DAR. September 2013 THE POINTE, PALM JUMEIRAH DUBAI

Retail, food and beverage areas, external landscape areas, car parking structure, monorail station and waterfront promenade. Team leader for Design and tender document review of VAC, Plumbing and Firefighting system designed by DAR.

September 2013 UNIVERSITY OF DUBAI – DUBAI, UAE

University consists of three college of Business, Law and Arbitration and Information Technology with total campus area of 21308 m2. Team leader for Design and tender document review of VAC system designed by DAR. November 2013 DAR AL FOUAD HOSPITAL,CAIRO EGYPT

The hospital will be equipped with 162 beds, 7 operating rooms, and 37 critical care beds. Attached to the hospital, a medical tower will be constructed containing 237 physician clinics.

Team leader for Design and tender document review of VAC system designed by Shaker Consultant.

Reviewing submittals, Shop drawing, BID technical Evaluation all mechanical Equipment’s and site Visits.

December 2013 AL DUHAIL CAMP, DOHA, QATAR

Construction of a new camp facility at Al Duhail, on the outskirts of Doha. The camp will cover four million square meters in total. The ISF project will be large in scale, featuring more than 330 individual building units made up of several different types of purpose-built facilities. Team leader for Design and tender document review of VAC, District cooling plant, plumbing and firefighting system designed by different consultant like DCPRO and Arab Engineering Bearou. AL DUHAIL CAMP, DOHA DISTRICT COOLING PLANT, QATAR With nominal capacity of 35,000Ton with Cooling Towers, 7 pairs of Centrifugal Chillers in series with nominal capacity of 2500 Ton each and 7 Primary 7500 GPM each 8 Secondary pump 7500 GPM each and 7 Condenser pump 15000 GPM.

Amr Baraka 12

Team leader for Design and tender document review of VAC, District cooling plant, system designed by different consultant like DCPRO and Arab Engineering Bearou

January 2014 SUPERVISION OF NEW TERMINAL AT KUWAIT INTERNATIONAL AIRPORT, KUWAIT

The State of Kuwait, through the Ministry of Public Works, had commissioned the design of the New Passenger Terminal Building at Kuwait International Airport during 2010, which was undertaken by Foster and Partners in association with Gulf Consult. Subsequent to the finalization of the design, the Project was tendered in December 2013, and the bids are expected to be submitted by mid-2014

Team leader requested to conduct a high level review on the available tender documents to ensure completeness and technical correctness. Tender document review of VAC, District cooling plant 25000 Ton, plumbing and firefighting system designed by different consultant. March 2014 HAJJ CITY MADINAH MHC, KSA

This project will cover the area of 1.6 million square meters along Hijrah road and would have modern facilities and public transport system. The project will provide accommodation to 200,000 faithful pilgrims from across the globe.

According to the plans and project details the new established city would have all the basic facilities that include Railways, bus stations, offices of government agencies and a hospital comprising of 400 beds. World class hotels and furnished apartments would be part of this project to provide accommodation for over 200,000 pilgrims. The project has been applauded by a majority of the Saudis inland and expatriates claiming that this project would be a new opening of an era of pilgrim services that would give much more opportunities to the kingdom to serve Muslims traveling to Saudi Arabia from across the globe. Team leader requested to conduct a high level review on the available tender documents to ensure completeness and technical correctness.

Tender document review of VAC, District cooling plant 200,000 Ton, plumbing and firefighting system designed by different consultant. And Responsible for design review and reviewing submittals, Shop drawing, BID technical Evaluation all mechanical Equipment’s for the building. And design coordinator between main design office and contractors. HAJJ CITY MADINAH MHC DISTRICT COOLING PLANT, KSA

2 Chiller Plant (CUC A &CUC B)With nominal capacity of 10000Ton with Cooling Towers, 40 Centrifugal Chillers MITSUBISHI in series with Amr Baraka 13

nominal capacity of 2500Ton each and 21 Primary VFD Pumps 7500 GPM each 21 Condenser pump 15000 GPM each.

Team leader responsible for preparing Conceptual Design and reports, Preliminary Design, Detailed Design, Coordination with other services for VAC, and special Mechanical systems and chilled water pipes of 1200mm run in site for almost 3 Km.

January 2015 GOVERNMENTAL COMPOUND AGENCY GAG, KSA 480 hectares project size with Project Cost of 8 Billion SR to Create Government city for the city of Riyadh to contain headquarters of 60 Ministry and Government bureau in addition to mixed use consist of office buildings, hotels, a convention center, shopping malls and entertainment centers, a grand mosque and public parks.

Tender document review of VAC, District cooling plant 65,000 Ton, plumbing and firefighting system designed by different consultant And Responsible for design review and reviewing submittals, Shop drawing, BID technical Evaluation all mechanical Equipment’s for the building. And design coordinator between main design office and contractors.

GOVERNMENTAL COMPOUND AGENCY GAG DISTRICT COOLING

PLANT, KSA

2 Chiller Plant (CUC A &CUC B)With nominal capacity of 65000 Ton with Cooling Towers, 26 Centrifugal Chillers LG in series with nominal capacity of 2500Ton each and 14 Primary Pumps 7500 GPM each,8 Secondary Pumps 15000 GPM,14 Condenser pump 15000 GPM each.

Team leader responsible for preparing Conceptual Design and reports, Preliminary Design, Detailed Design, Coordination with other services for VAC, and special Mechanical systems and chilled water Pre-Insulated pipes of 1500mm run in site for almost 3 Km.

January 2016

January 2016

Upgrading of storm water pumping station SDP-6, Dubai Airport, UEA

Upgrade of storm water pumping station up to 10 m3/sec. detailed pump head calculation, process layout, pumps selection, preliminary surge analysis, and MEP services for the pumping station. Coordination with Environmental, electrical, structure & geotechnical teams. Upgrading of storm water pumping station SDP-West, Dubai Airport

, UEA

Upgrade of storm water pumping station up to 6 m3/sec. detailed pump head calculation, process layout, pumps selection, preliminary surge Amr Baraka 14

analysis, and MEP services for the pumping station. Coordination with Environmental, electrical, structure & geotechnical teams. January 2016 King Abdul Aziz International Airport, Saudi Arabia. (MEGA PROJECT)

King Abdul Aziz International Airport, Saudi Arabia. Project management, design review(according to LEED requirements), construction management and supervision for a new airport based on a new phased master plan up to the year 2035 (Phase 1 up to 2012),comprising a new passenger terminal complex (670,000 m ) with a capacity of 30 million passengers per annum to replace the existing North and South Terminals;; programme coordination for related projects, including fuel tank farm, Jet fuel supply line from Aramco to the fuel farm, Jet fuel hydrant network, desalination plant, upgrading of existing terminals, sewage treatment plant; and planning and infrastructure and earthworks for a major landside commercial zone, complementing the main development. And Responsible for design review and reviewing submittals, Shop drawing, BID technical Evaluation all mechanical Equipment’s for the building. And design coordinator between main design office and contractors. May 2016

CUSTODIAN OF THE HOLY MOSQUE EXPANSION OF PROPHET

MOSQUE & PIAZZA IN MADINAH & RELATED ELEMENT CONCEPT DESIGN REPORT(MEGA PROJECT)

Responsible for design review and reviewing submittals, Shop drawing, BID technical Evaluation all mechanical Equipment’s for the building. And design coordinator between main design office and contractors. October 2016 NAKHEEL JEBEL ALI RESIDENTIAL MASTER PLAN Jebel Ali Community is divided into Twelve residential building, Community Buildings (mosque and club house), Utility Buildings (district cooling plant with 50,000 Ton and thermal storage tank 11,000 Ton) and External on grade Car parking.

Team leader requested to conduct a high level review on the available tender documents to ensure completeness and technical correctness. December 2016 KINGDOM CITY - INFRASTRUCTURE DESIGN The chilled water distribution network using pre-insulated MS pipe with HDPE jacket with maximum diameter of 1500mm

Team leader requested to conduct a high level review on the available tender documents to ensure completeness and technical correctness. June 2017 New Cairo Admin Capital - Ministries Buildings Amr Baraka 15

More than 34 ministers building including cabinet building and parliament building with district cooling plant almost 50,000 Ton Responsible for design review and reviewing submittals, Shop drawing, BID technical Evaluation all mechanical Equipment’s for the building. And design coordinator between main design office and contractors. February 2018 EMAAR SQUARE CAIRO

More than ten residential and offices tower with height of 70m with a common podium as parking for 40,000 Cars.

Team leader requested to conduct a high level review on the available tender documents to ensure completeness and technical correctness. EMAAR SQUARE CAIRO DISTRICT COOLING PLANT

Chiller Plant With nominal capacity of 26400 Ton with Cooling Towers, 8 Centrifugal Chillers in series with nominal capacity of 3300Ton each and 9 Primary Pumps 7500 GPM each,9 Secondary Pumps 15000 GPM,9 Condenser pump 15000 GPM each.

Team leader responsible for preparing Conceptual Design and reports, Preliminary Design, Detailed Design, Coordination with other services for VAC, and special Mechanical systems.

March 2018 NEW LINE OF CAIRO METRO STATIONS

Adly Mansour station and Qubaa Station.

Team leader requested to conduct a high level review on the design for mechanical trades.

April 2018 King Khaled International Airport,Riyadh Located 35km north of Saudi Arabia’s capital city Riyadh, 100,000m2 terminal building area, a 90,000m multi-story



Contact this candidate