Work Experience
Present Employer Name: HYQUIP SYSTEMS LTD.
Designation : Asst Manager
Project Handled
1) Coal block project at Thadicherla (Hyderabad). (February 2018 to till date)
Responsibilities
Erection and testing commissioning of 33KV switch yard.
Erection and operational maintenance of total coal block plant.
Erection and operational maintenance of 3 MVA USS transformer.
Erection and operational maintenance of 500 KVA DG sets
Employer Name : WAL CHAND NAGAR INDUSTRIES LIMITED
Designation : Site Engineer
Project Handled
1) Cheyyar Sugar Mill Co gen Power Plant (From December 2014 to January 2018)
Client: TNEB
Responsibilities
LT MCC PANELS
a.Operational maintenance and testing commissioning of LT MCC Panels and bus bar checking.
b.Trouble shooting and commissioning of typical Power and control circuit of DOL starter feeder as per drawing.
c. Trouble shooting and commissioning of typical Power and control circuit of star delta starter feeder as per drawing.
Operational maintenance and testing commissioning of DRY type transformers. (2000,2500KVA)
Erection and operational maintenance of oil type transformer.(3MVA,11KV transformer).
Operational maintenance and commissioning done for VFD. (Schematic Diagram for VFD with auto X-MER starter by pass, ACC fans, FD fan, ID fan, SA fan, coal extractor)
Erection and operational maintenance of 500KVA DG sets.
Operational maintenance of HT panels and relay operation checking.
Operational maintenance and testing and commissioning of 6.6 KV circuit breaker.
Operational maintenance and commissioning done for total plant LT motors.
Loop checking and pre commissioning done through DCS for all drives, field instruments (pull card, belt sway switch, zero speed switch.
Operational maintenance and commissioning done for coal conveyor motor and bagasse conveyor motor.
Testing and maintenance of 110KV switch yard.
Operational maintenance of total electrical boiler equipment.
Operational maintenance of water treatment plant.
BGR ENERGY SYSTEMS LTD
Project Handled
1)2x500MW, MTTPP, Chhattisgarh (From August 2012 to March 2014)
Client: CSPGCL
2)1x500MW, KTPS, Paloncha (From April 2010 to August 2012)
Client: APGENCO
3)1x500MW, VTPS, Vijayawada (From March 2008 to April 2010)
Client: APGENCO
Responsibilities
Erection & operational maintenance of LT & HT MCC Panels and Interconnection of Main & Control bus bar connection.
Erection & operational maintenance of dry type transformers (2000KVA, 1600KVA, 1250 KVA, 630KVA).
Erection & Operational maintenance for batteries sets 2250 AH and Load current checking of batteries.
Erection & Operational maintenance done for float charger and float cum booster charger and load current checking of charger.
Fixing of bus duct from transformer end to panel end. TPN Non segregated Al Bus duct (4000A & 2500A, 3000A & 1250A).
Overall main plant earthing and testing of earth pit connection and switchyard grid connection.
Execution of cable Tray work.
Over all lightening protection(TG Building, Switchyard control room and FOPH, Transformer yard etc.,)
Erection of 3*1500 KVA DG sets and segregated bus duct alignment from DG set to panel end.
SEPCO Construction Corporation, Jharsuguda, Orissa as Sr.Site Engineer. (9x135MW Thermal Power Station) From June 2007 to January 2008
Erection of LT and HT MCC Panels.
Laying of cables for HT & LT lines.
Execution of Cable Tray Work as per drawing.
Implicating Drawing in Lighting Electrical Equipment installation etc.,
Payal Associates WTP Jorabagan, Kolkata (L&T Project),
Site Engineer (Water Treatment Plant) From Jan 2002 to May 2007
Operational maintenance and installation work for HT Motors (300KW-560KW) LT Motors (2 KW – 40Kw), Neutral Soft Starter, DOL Starter, PLC.
Operational maintenance and installation work for HT & MCC Panels.
Operational maintenance and installation of Air Compressor, Air Blower, Flow Transmitter, Level Switch, Solenoid Valve and Pressure Control Valve. Etc.,
Laying of Cables for HT & LT Lines including instrument cables.
Educational Qualification
Diploma in Electrical and Electronics Engineering from M.I.E.T Polytechnic College, (1992-1995).
Personal Details
Father’s Name : K.S.Soundararaja Iyengar
Date of Birth : 10-05-1971
Gender : Male.
Nationality : Indian.
Marital Status : Married.
Languages Known : Hindi, English, Telugu and Tamil.
Permanent Address : 41/31,North street,Thiruvidaimuruthur,
Kumbakonam, Thanjavur DT
Pass Port No ; N8262105
Your’s Faithfully,
S. Rajagopalan.