Mohammed Sohil Enad Fares
********.*.*****@*******.***
Riyadh – KSA
Summary
A Civil Engineer with 7+ years of experience. Capable of working independently and under pressure with minimum supervision, and committed to providing high quality service to every project, with focus on health, safety and environmental issues. Professional, capable, and motivated individual who consistently performs in challenging environments.
Personal Data
• Nationality: Jordanian
• Date of Birth: 13th of October, 1990
• Married
Education
• An-Najah Nation University 2008-2013
Bachelor’s in Civil Engineer
Experience
• Consolidated Contractors International Company Oct 2013 – present PMV & Camps Cost Engineer at Ar-Riyadh Metro Project (RMP) BACS Consortium - KSA:
Fully understood cost breakdown structure CBS and cost code.
Studied the cost estimate and prepared the budget and forecast for the PMV.
Prepared Construction Equipment Schedule (CES).
Issued monthly PMV cost report.
Monitored and tracked actual spent, and suggested correction actions where needed.
Monitored any chances for made some budget savings and reported them to PMT.
Extracted fuel consumption for all subcontractors on a monthly basis.
Forecasted all PMV inhouse and hired equipment, taking in consideration all expenses (Fuel, Spare Parts, Oil,…)
Prepared change in law claim for the fuel price, and prepared the full backup accordingly.
Created and updated equipment log, shows each equipment horsepower, classification, location of work and monthly odometer reading, …
Analized actual camps expenses (three camps), and issued monthly cost report for them.
Made cost re-allocation between camps, to have clear picture on the actual cost and compare it with budget.
Project Controls Engineer at Ar-Riyadh Metro Project (RMP) BACS Consortium - KSA:
Prepared weekly construction progress report and analized actual with planned figures.
Created weekly performance report, forecast quantities and forecast man-hours.
Understood and analized the project budget, and their cost elemnt.
Monitored weekly performance and progress, reviewed them with site teams and suggested actions to avoid bad performance and miss targets.
Linked the engineering BOQ quantities with their corresponding cost code and commodity, and used them in the various reporting systems.
Prepared the weekly / monthly progress forecast for the project with man-hours and quantities and issued commodities curves, plan vs actual quantities charts.
Site visits for all deliveries (Tunnels, Viaduct, Stations and Depot) to explain quantity reporting and targets.
Implemented PowerBI for RMP with guidance from PC Manager, which is a first for CCC world wide.
Publish Ar-Riyadh Metro Project Dashboard using Power BI program, that shows a full information for percent complete, actual quantities, plan figures, actual unit rate, focus curves, performance factor, sub-contractors workpackages, and testing & commissioning progress.
Helped implement PowerBI dash boards for direct / indirect cost, back charge program and invoice tracking.
Provided training to several project personnel including project controls, subcontracts and accounting departments.
Project Controls Engineer at Abu Dhabi Airport Project (MTB) – UAE
Construction Progress Monitoring.
Monitored and updated all steel structure, mechanical, and Baggage Handling System (BHS) actual quantities.
Prepared the project’s cost loading by linking BOQs to their relative planning activities.
Prepared weekly project earned value (EV) reports.
Used SQL Database to prepared customized reports when required.
Attended subcontractor progress meetings.
Two months training on project controls systems at CCC Regional Application Support Office (RASO).
• AL-Majaz Consultant Engineer May 2013 - Sep 2013 Site engineer for a commercial building
Checked and worked on the engineering design for the project.
Quantities surveying for the project using the engineering drawings.
Requested the material for the project and made sure that they met the specifications.
Supervised the construction works on site, and explain the drawings to the foremen.
• HAWWA Association Feb 2013 – May 2013
Site engineer in "AL BAIT AL KANA'ANI" project.
Supervised the construction works on site.
Signed the works approval form for the contractor.
Checked the quantities performed on site on a daily basis.
Supervise the muck up area for the project and prepare the different samples that we got for the project.
• Al Hamad Contracting Company Jun 2012 – Aug 2012 Internship in two projects as a site engineer
Checked the manpower that we got for site works and distribute them on the activities to be performed.
Made sure that the material needed is available for the ongoing activities.
Checked the engineering design and quantities that we got from the consultant.
Supervise the construction works on site and explain the engineering drawing to the teams.
Update and maintain the project schedule.
Closing the project checklist items.
Academic Projects
• Graduation Project
Measuring Palestinian Labor Productivity Rates For Block, Reinforcement and Excavation Works.
• Geographic information system project
Mapping Nablus City for Earthquake Evacuation.
• Primavera Project
Estimate the engineering quantities and man-hours to build a Villa of 195 M2, then identify the needed resources and prepare the schedule for it using Primavera (P6) software. Skills
• Computer programs: Power BI, MS Office (Excel,Word and PowerPoint), Primavera, AutoCAD, SAP, GIS,SQL Database,SSRS.
• Analytical Skills.
• Reporting Skills.
• Communications Skills.
Languages
• Arabic: Mother language
• English: Good
Certification and Professional Training
• Primavera P6
• AutoCAD 3D Civil
• Geographic Information System (GIS)
• Construction Scheduling Workshop
• Site Walk Analysis Program
• Risk Management
• Construction Planning and Scheduling
• Direct / Indirect Estimating & forecasting
• Trend program
References
• Will be provided upon request.