Post Job Free
Sign in

NDT Inspector

Location:
Saihat, Eastern Province, Saudi Arabia
Posted:
July 30, 2020

Contact this candidate

Resume:

CURRICULUM VITAE

Name : Yayat Sutaryat

Place /Birth of Date : Bandung, 19 June 1977

Nationality : Indonesian

Address (home) : Perumnas Fanindo Blok L NO.17 Tg.Uncang, Batam,

Kepri - Indonesia 29422

Present Address : 5152 – Jubail City Center

Unit Number 952

Al Jubail 35514 – 7979

Kingdom of Saudi Arabia

Sex : Male

Marital Status : Marriage

Education : Diploma III ( Industrial Engineering )

Qualification : Welding /NDT TECHNICIAN (Inspector)

1.UT PCN LEVEL II 3.1, 3.2,3.8 & 3.9 ( PCN NO. 325523)

2.AUT ( ROTOSCAN (AUT of Pipeline Girth welds)) – Cerf

3.UT DNV LEVEL II

4.ASNT UT ALL Configuration Level II Cert.No : UT-AC-1257

5.ASNT MT Level II Cert.No : MT 1112/MT/Re/13

6.ASNT PT Level II Cert. No : PT 1068/PT/Re/13

Microsoft Office ( Excel,Word & PowerPoint )

Phone No. : +966-********* & +62-812********

Pasport No. : C 3480215

Safety Passport. : A 51300

BOSIET & TSbB Vantage No. : 1442795 (expiry date 24-01- 2018)

SEAMAN BOOK : 1056782 (expiry date 17-03- 2020)

International Cert Vaccination or Prophyiaxis :F00-031498 (expiry date 15-02-2026)

IMIST (OPITO) Cert No : 117153121601163009 (expiry date 16-01-2020)

Email Address : *********@*****.***

Skype : YAYAT SUTARYAT +966-*********)

EDUCATION BACKGROUND

1984- 1990 : Primary School at SDN Leuwi Bandung II,Bandung West Java

1990-1993 : Junior High School at SMPN Baleendah,West Java

1993-1996 : Technical High School at STM Penerbangan Bandung,West Java

1999-2003 : Diploma 3 Jayabaya University,Jakarta Mayor of Industrial Engineering

Certificates and Additional Training

NDT Qualifications

Methods

Level

EXPIRED DATE

Standard

UT

Ultrasonic Testing All Configuration

( 3.1, 3.2, 3.8 & 3.9)

2

10-02-2021

PCN

AUT

Automated Ultrasonic Inspection of Pipeline Girth Welds

2

14-11-2018

In House Applus RTD

UT

Ultrasonic Testing All Configuration

2

06-04-2017

ASNT

MT

Magnetic Particle Testing (Re-Cert)

2

28-10-2018

ASNT

PT

Penetrant Testing (Re-Cert)

2

28-10-2018

ASNT

Additional Training

Conducted by

CONDUCTED

Certificate Expired

OPITO IMIST ( International Minimum Industry Safety Training )

PROMETRIC Engineering and Inspection Services

16-01-2016

16-01-2020

Security Awareness Training

MSTS Asia SDN BHD

16-03-2015

16-03-2020

Course PMI

Applus RTD Australia

October 2014

H2S

MSTS Asia SDN BHD

March 2014

BOSIET &TSbB

M &O INDONESIA

Jan-2014

24-01-2018

Course and Exam UT PCN

A-STAR Training & Consultancy Pte Ltd

August 2014

Mock UP DNV

DNV Singapore

March 2011

Hazardous Waste Management Training

Pemko & Otorita Batam

May 2007

ISO 9001-2000

TUV International Indonesia

July – October 2004

EMPLOYERS HISTORY :

Company

Last position

From

To

Jubail Energy Services Company (JESCO)

Saudi Arabia

QC NDT Level 2

Desember 2016

At Present

PT. Java Velosi Mandiri( Applus Velosi )

NDT Technician ( PCN UT + AUT Tech Level 2)

October 2016

November 2016

PT. Tristar Marine

NDT Technician ( PCN UT Level 2 )

September 2016

Ocober 2016

Ultra Inspection Engineering Pte Ltd

NDT Technician ( PCN UT Level 2)

Desember 2015

July 2016

PT.Prospec Indo Pratama

NDT Technician ( PCN UT Level 2)

Oct 2015

April 2016

PT Singgar_RTD ( Applus RTD)

NDT Technician ( AUT Tech + UT /MT Level 2)

October 2013

September 2015

PT Hitek Indo Mulia

NDT Technician ( DNV UT + ASNT UT/MT Level 2)

April 2012

October 2013

PT Cast Laboratories Indonesia

NDT Technician ( DVN UT + ASNT UT/MT Level 2)

November 2010

August 2012

PT Mc Connell Dowell Services

Materials Controller

February 2009

May 2010

PT UT Quality Indonesia

NDT Technician ( ASNT UT + MT/PTLevel 2)

February 2008

January 2009

PT Ace Techindo Mechatronic

Asst.Supervisor

October 2003

December 2007

PROJECT ASSIGNMENT :

Year

Position

Project Details / Job Description

Contractor/Client

2016-Now

QC NDT Level 2

Advanced NDT ( UT Operator /LR UT -TUBOSCOPE/ & EMI /MFL Operator )

Seamless pipe / OCTG Pipe Company at Jubail Industrial City Saudi Arabia, with job descriptios as below

1.To perform size change

2.To perform calibration of the NDT equipment according to procedure and work instruction

3.To perform Prove-up activity

4.To record calibration data ( diagram and calibration data sheet

ARAMCO, NPCC

DUFERCO,MARUBENI

PETROFAC

CUNADO

2016

NDT Technician/Inspector

*.Assigned as UT Flaw Pcn inspector at OFFSHORE at FPSO BAOBAB IVOIRIEN MV 10 ( Ivory Coast Sea ) Africa

*.Assigned as PAUT & UT PcnTechnician at 7153 Maintenance Project ( RB3 )

*.Assigned as UT Pcn Technician at LCP Badamyard Project ( Grillage & Sea fastening )

Modec Managements Services

PT.RAPP Pelalawan Riau

PT.DDW – PAX OCEAN Batam

2015

AUT Technician & NDT Technician

Assigned as Scanner Technician & NDT Technician at Offshore Vietnam Sea .48”x34.5 km Pipeline -1 and 2 Nghi Son Refinery and Petrochemical (NSRP) Marine Work-1Crude Oil PipeLine Project

Assigned as UT PCN and MT Inspector for SK-316 Fabrication of Installation Aids at PT.Global Industries Asia Facific, Technip Base Batam

JGCS / NSRP LLC

(HD 2500 Barge )

Petronas Carigali Sdn.Bhd.

2014

AUT Technician & NDT Technician

Assigned as Scanner Technician & NDT Technician at Offshore South China Sea for 20”x30km F14R-A To F23DR-A

12"x22km F29 to F23DR-A PipeLine Gas Field Development

Sapura Kencana Petroleum (SK2000 Barge)

Serawak Shell Berhad

2013

AUT Technician & NDT Technician

Scanner technician& NDT Technician for Onshore Siakap North petai Project Spole Base and Pipe in Pipe Insulation at PT Mc Dermott Indonesia.

(Received Certificate of Appreciation from Mcdermott)

PT Mc Dermott Indonesia

2013

NDT Technician

Assigned as UT TKY Inspector for South Belut Sub sea and top Side Facilities

PT Profab Indonesia

Assigned as UT DNV Inspector for BUKOM SBM 48” Pipeline- Repair project

PT Profab Indonesia

Assigned as UT TKY Inspector for Iraq Crude Oil Export Expansion Project (ICOEEP) Phase II-LSF Support.

South Oil Company (SOC) PT Saipem Indonesia KArimun Yard

Assigned as UT Thickness gauging, Laminating and Disbounding for Barzan offshore project (Ras Gas Company Limited)

PT Cladtek Bimetal Manufacturing

Assigned as UT Thickness gauging, Laminating and Disbounding for Shah Gas Development (Abu Dhabi Development Company Limited)

2012

Assigned as UT Thickness gauging, Laminating and Disbounding for Perla Field Early Production Development for Tenaris Global Service SA

NDT Technician

Assigned as MT/PT and UT Inspector for Deck Landing Platform B under MacDow Geosea JV

PT MC Connell Dowell Indonesia

Assigned as MT/PT and UT Inspector for ship unloader Jurong Port under IBAU HAMBURG

2011

Assigned as MT/PT and UT DNV Inspector for various project under PT Profab Indonesia:

●FPSO OSX-2 of ODS METERING SYSTEM

●Compressed air 5 & 22 CUM project, PT MC Dermott Indonesia

●ONGC D-1 Development project Anchor Contracting.

●HAI THACH STL-BUOY & TURRET project for APL (Advanced Production Loading AS).

●Stock Bouy 09 project for Blue water energy services by (BES).

●PL2 LIFE EXTENSION PROEJCT for Emas Offshore Construction & Production.

●Woodside NRB – Substructure project for HEEREMA Marine contractors australia

PT Profab Indonesia

2010

NDT Technician

Assigned as UT Inspector for Various project located in PT BATAMEC SHIPYARD:

●H 7050, H 7049, H 7048 Project for Mosvold supply.

●H 7063 project for NORSHORE

PT Batamec shipyard

Assigned as UT Inspector for CEC (Nucoastal Thailand) Project, Pertamina project & Oil Country Technology Project of Oil States Industries asia

PT INDO KAYA Energi

2009-2010

Materials Controller

Assigned as Materials Controller for Singapore Parallel Train Pipe Rack Project with Responsibility :

Daily Checking after QC Release

Daily Up date Raw Material – Proses -Fit up – Finishing

Checking Spool and Structure asper Drawing and name tag

Daily Report to Materials Controller Manager

PT Mc COnnel Dowell Sevice Batam

2008-2009

NDT Technician

Assigned as MT/ PT Inspector for Tanker Pasific Offshore Terminal MOntara Filed Development Project

PT Global Process System

Assigned as MT/PT and UT Inspector for B1 1 Re-Development (Serawak sheel Berhad) Project and Harwell Cluster-Phase 2 Project

PT Cladtek Bi Metal Manufacturing

2003-2007

Asst.Supervisor

Assigned as Asst.Supervisor with Responsibility :Lead Auditor for ISO 9001-2000 as Management System

Keeping Quality and Productivity as per Company Goal

Arrange Man Power for get productivity and Safety.etc

PT Ace Techindo Mechatronic

Best Regards

YAYAT SUTARYAT



Contact this candidate