ElectricalDesign Engineer,ElectricalSite Engineer with 12 Years
professionalexperienceinElectricalEngineering.
PersonalInformation
Nationality:Iraqi
Dateofbirth:1972
Languages:Arabic,English.
DrivinglicensefromUAE
Education
B.Sc.inElectricalEngineering,Universityoftechnology,2003-2007 ProfessionalExperience
1-(2007-2008)Al-JUTHOORCOMPANY(BAGDDAD).
2-(2008–2011)Al-BayatyArchitectsConsultants.
3-(2011–2016)BAINONAEngineeringConsultants.
4-(2016–2018)UniversalConsultancyServicesConsultants. 5-(2018–2020)SEREXInternationalFranceEngineeringConsultants. 6-(2020–Tillnow)TechnicalConstruction&Electromechanical. A)OfficeWork
Designingvilla,Tower,Hospital,Hotel,forallthefollowingservices: 1-Power.
2-Lighting.
3-Telesystem.
4-SMATVSystem.
5-Lightningprotection.
6-FireAlarmSystem.
Mobileno:050*******
Email:*********************@*****.***
HarithJabbarTaha
7-PublicaddressSystem.
8-CCTVSystem.
9-ACCESSCONTROLSystem.
10-BOQEstimationfortheprojectswithspecs.
11-UTT.
12-ITSYSTEM.
13-LightingCalculation.
14-VoltageDroopCalculation.
JobsrelatedtoMEPinvariousprojects,includingthedesignoflighting,lightning arrestors,telecommunications,firedetection,etc.
o FoodControlAuthorityCenter(FCAC)(4basements+G+27floors) o DubaiLandProject(21Bldgs.)(G+4)
o MoonFlowerTower
o AlAinOasis(13Bldg.)(G+5)
o GoldenFishTower
o PoliceHQ
o 19–Villasproject
o NumberofPrivatevillas
o 2TowersinMBZtown(KEO)
o Laborscamps(5000Residents)
o LuluIslandHotel
o Shbahatplaza(ESTIDAMA)
o ZAYEDSunCity (ESTIDAMA)(4BUILDINGS&365VILLAS).
o Numberofprivatevillas(ESTIDAMA)
o PoliceHQ(ESTIDAMA)
o ALAINairport.
o CAMP(ESTIDAMA)
o Restaurant
o ALMinaFactory(ESTIDAMA).
o ZayedSunCity(ESTIDAMA).
o MarinaFactory.(30000m2)
o Clinic(DAS).
o N.P.C.C
o ADEC(ALAin)(Musanda).
o ALRODA-1(ESTIDAMA)(UTT)(15floors)(REEMDEVELOPERS). o ALRODA-2(ESTIDAMA)(UTT)(5floor)(REEMDEVELOPERS). o ALRAHA-1(ESTIDAMA)(ADCE)(UTT)(11floors).ALDAR(ADCB) o ALRAHA-2(ESTIDAMA)(ADCE)(UTT)(8floors).ALDAR(ADCB) o RedCrescent.(ESTIDAMA)(ADCB).
o SARAYATower(42Floor).
o ALAuolaqeeBldg(ALAin).
o Store&WorkShop(ICAD,2).
o N.P.C.C.ICAD4.(14MW).
o ALNOORTower(REEMIsland)(UTT).
o Laborscamps(HAMEEMCAMPS)(15000Residents).
o MarinaMall–DomeRetail.
o MarinaMall–BOUNCE.
o ALMosasaffahAccommodationVillage(arabtec-13MW).
o RABDANACADEMEE.
o INTERCONMAJLIS(sheikhAbdullahBINZAYED).
o MAJLIS(sheikhMANSOERBINZAYED)(ROYALGROUP).
o SHININGTOWER(ADCO).
o SARAYATOWER(42FLOORS).
o BLUSKY(MANCHESTER-CAFE).
o ICEFACTORY.
o READCRESCENT–MEDICALOFFICES.
o YASHEALTHCLINIC-1.
o MUSANDAZAYEDHIGHERORGANIZATIONHEDQUARTERS.
o ALFLAHSCHOOL.(MUSANDA)
o ALRODA-3(ESTIDAMA)(UTT)(9floor)(REEMDEVELOPERS). o YASHEALTHCLINIC-2.
o DOLPHINENERGY-KIZAD.
o RAWDHATABUDHABI(C101&C89)
o RADIANTTOWER.ROYALGROUP.(G+19FLOORS).
o HighnessFatmapalaceSADIYAT.
o CapitalGate(Lightfitting)ADNEC.
o All(ADNEC)project.
o Mangroveprojectwith(MODON).
o AMCprojectfit-out.
o 2TOWERSinALREEMIsland.
o ALSHAMSEYTowerABUDAHBI.
B)Sitesupervision(ElectricalSiteEngineer)
1.P9ComplexBldg.(DUSITTHANI)
ComplexBuildingsHotel(G+35),UnfurnishedApartments(G+18)&Offices(G+16) UAE,AbuDhabi
Duties:
SeniorElectricalengineering
a.InspectionandTestRequirements.
b.ControlofEquipmentandMaterialRequisition.
c.ScheduleControl.
d.EnsuringQualityofWorks.
e.Sub-contractorReviewandControl.
f.Reporting.
2.ThreePoliceStations.UAE,Tareef,Mezairaa&ALMAFRAQ Duties:
SeniorElectricalengineering
a.InspectionandTestRequirements.
b.ControlofEquipmentandMaterialRequisition.
c.ScheduleControl.
d.EnsuringQualityofWorks.
e.Sub-contractorReviewandControl.
f.Reporting.
3.HameemCamp.
a.SeniorElectricalengineering
a.InspectionandTestRequirements.
b.ControlofEquipmentandMaterialRequisition.
c.ScheduleControl.
d.EnsuringQualityofWorks.
e.Sub-contractorReviewandControl.
f.Reporting.
4.PrivateBeachHouse(SaadiyatIsland,AbuDhabi).
SeniorElectricalengineering
a.InspectionandTestRequirements.
b.ControlofEquipmentandMaterialRequisition.
c.ScheduleControl.
d.EnsuringQualityofWorks.
e.Sub-contractorReviewandControl.
f.Reporting.
5.Agthia(AbuDhabi).(28,000m2)
SeniorElectricalengineering
a.InspectionandTestRequirements.
b.ControlofEquipmentandMaterialRequisition.
c.ScheduleControl.
d.EnsuringQualityofWorks.
e.Sub-contractorReviewandControl.
f.Reporting.
6.ASMAK(Dubai).(30,000m2)
SeniorElectricalengineering
a.InspectionandTestRequirements.
b.ControlofEquipmentandMaterialRequisition.
c.ScheduleControl.
d.EnsuringQualityofWorks.
e.Sub-contractorReviewandControl.
f.Reporting.
7.HighnessFatmapalaceSADIYAT.
SeniorElectricalengineering
a.InspectionandTestRequirements.
b.ControlofEquipmentandMaterialRequisition.
c.ScheduleControl.
d.EnsuringQualityofWorks.
e.Sub-contractorReviewandControl.
f.Reporting.
8.CapitalGate(Lightfitting)ADNEC.
SeniorElectricalengineering
a.InspectionandTestRequirements.
b.ControlofEquipmentandMaterialRequisition.
c.ScheduleControl.
d.EnsuringQualityofWorks.
e.Sub-contractorReviewandControl.
f.Reporting.
9.Mangroveprojectwith(MODON).
SeniorElectricalengineering.
a.InspectionandTestRequirements.
b.ControlofEquipmentandMaterialRequisition.
c.ScheduleControl.
d.EnsuringQualityofWorks.
e.Sub-contractorReviewandControl.
f.Reporting.
3-From2007–2008ALJUTHOORCompany.
A)OfficeWork
Designinguniversity&Villaswithfollowingservices:
1-Power.
2-Lighting.
3-Telesystem.
4-SMATVSystem.
5-Lightningprotection.
6-FireAlarmSystem.
7-PublicaddressSystem.
8-BOQEstimationfortheprojectswithspecsOtherSkills: OtherSkills:
1.Maintenanceofelectricaldistributionsystem includingmaindistributionboards,air circuitbreakersandL.V.switchgears.
2.Installationofdieselgeneratorset(rating250-1500KVA)includingcabling,ATS
(automatictransferswitch),andautostartingsystem.
3.Maintenanceandinstallationofpowerfactormultistageautomaticswitchingpower factorcorrectionsystem.
4.Installation of streetlightingpolesandassociatedcablingandtheneeded infrastructure. Theworkwasincludingautomaticswitchingcontrolboardsand sensors.
5.InstallationofsubstationH.V.(11KV)switchgears.
6.Supervisionontheinstallationofthewholeelectricdistributionsystem of6story buildings,includingallwiring,distributionboards,powerfactorcorrection,metersand finalloadsandlighting.
7.Designofelectricalandtelecommunicationsystem ofmultistorybuildingandvillas, includingallpowerdistribution,sizingofequipmentandrelatedlayouts. 8.ExteriorandInteriorlightingdesignofbuildingsandvillas,thejobincludesselection of
Lightfittingsanddistributionaccordingtostandards,usingrelateddesignsoftware's. Officeskills
1-AutoCAD
2-MSOffice
3-GeneralComputerSkills
4-Electricalcalculationssoftware(Designo)
5-Firealarmcertificate.
6-EstidamaTrying(certificate).
References
- UponRequest