APPLICATION FOR THE POST OF LEAD PROJECT COORDINATOR /

SENIOR MATERIALS EXPEDITING ENGINEER / PROCUREMENT MANAGER

Highly educated, hard working, disciplined, motivated, fast learner and responsible Engineer.

Gold Medallist in Masters Degree in Electrical Engineering. Completed 3 years of Ph.D research in Electrical Engg.

Professional experience of more than 22 years in Construction Industries / Oil and Gas Sector of Pakistan and Saudi Arabia.

Very rich vast materials procurement experience working for SAUDI ARAMCO / SABIC / MAADEN AND OTHER PRIVATE ORGANIZATIONS LIKE TASNEE, ETC. Well versed with Saudi Aramco materials procurement norms and procedures.

Looking forward for a suitable job as per my educational qualifications / professional experience with an aim to serve your reputed company for the post of Lead Project Coordinator / Senior Materials Expeditor / Procurement Manager. Detailed CV is attached.

Farhan Khurram

009**-*********

009**-*********

0092-213-***-****

0092-321-***-****

adeu3z@r.postjobfree.com;adeu3z@r.postjobfree.com RESUME

FARHAN KHURRAM

Contact Nos : 00966- 505331759, 009**-*********

E - M a i l : f a r h a n k @ a l s u w a i d i . c o m . s a APPLICATION FOR THE POST OF LEAD PROJECT COORDINATOR / SENIOR MATERIALS EXPEDITING ENGINEER / PROCUREMENT MANAGER

KEY QUALIFICATIONS

Highly dedicated, hard working, disciplined, motivated, fast learner and responsible engineer. Gold Medallist in Masters Degree in Electrical Engineering. Completed 3years of Ph.D research in Electrical Engg.

PROFESSIONAL EXPERIENCE 22 YEARS (1998 - 2020)

(From Present to Previous)

AL-SUWAIDI INDUSTRIAL SERVICES, SAUDI ARABIA 2008 to date M.S. Al-Suwaidi Industrial Services is a leading construction company in the Kingdom of Saudi Arabia, providing services to the Petroleum and Petrochemical Industry.

Present Position : Looking after Supply Chain Management Department as Procurement Head. Client: ARAMCO

Project : WASIT Lateral Lines (Berry Gas Plant and Khurasaniyah Gas Plant) Position : Senior Materials Expeditor and Lead Project Coordinator In this regard, my key responsibilities includes :

Arranging the material deliveries and distribution of supplies and parts in order to expedite flow of materials and meet production schedules.

Confer with vendor and SIS site personnel to co-ordinate production and shipping activities and to resolve complaints and to eliminate delays.

Contact suppliers to verify shipment details.

To maintain the record of requisitions, inventories of materials and supplies necessary to meet production demands.

Client: ARAMCO

Project : Bulk Plants

Position : Materials Expeditor

Involved in expediting the materials availability for the following bulk plants of Aramco, all over the Kingdom.

1. Al Hassa

2. Qatif

3. Qassim

4. Duba

5. Al Jouf

6. Turaif

7. Tabuk

8. Yanbu

9. Rabigh

10. Jeddah

11. Jizan

12. Abha

13. Riyadh

14. Sulayyil

Besides that, I have also worked for :

Client : SABIC

Contractor : Saudi Kayan-Daelim

Project : Saudi Kayan Polycarbonate Project

Place : Jubail, Kingdom of Saudi Arabia

As Senior Engineer in Al-Suwaidi Services, reporting to the Construction Manager (E&I), my major job responsibilities include:-

1. Coordination and execution of construction activities in a professional manner, with particular emphasis on HSE, technical integrity, planning and cost control for Electrical works.

2. Provide technical leadership in all project activities related to electrical in coordination with the consultant/client.

3. Coordination with planning and construction departments for the successful implementation of project.

4. Liaise with the equipment / instrument supplier for erection/commissioning/modifications/ rectifications etc., where required.

5. Submitting Construction Method Statements, Erection Sequence and Execution Plans for client approval, prior to start any activity.

6. Supporting the Testing team for Pre-Commissioning activity of 132 kV substation. 7. Develop procedures for smooth execution of project at every step. 8. Smooth Co-ordination with Consultant / Contractors and other related departments. NATIONAL UNIVERSITY OF SCIENCES AND TECHNOLOGY (Pakistan) JAN’2002 – APRIL’2008 I joined PNEC, National University of Sciences and Technology, NUST in January, 2002. I was involved in the constructional and maintenance projects of 11kV substations. In addition, I also conducted lectures on Electrical Engineering Courses to B.E under graduate service and civilian students at PNS Jauhar, Pakistan Navy Engineering College, Karachi. The main subjects taught included:

Power System Protection

Power Transmission

Power System Analysis

Electrical Machines

NUST to pursue higher education from Tsinghua University, Beijing, China. During my stay in China from Sept. 2003 to Aug.2007, I was involved in high quality projects in the field of Electrical Engineering. Research assistantship was also carried out under supervision of a Chinese professor to many graduates and Master level students in the following research projects:

1. Electrical Power Load Modelling

2. Influence of Load Modelling on Voltage Stability. 3. Synthesis Load Modelling.

To complete these research projects, I was actively involved in the construction of Electrical Industries located in remote areas of Beijing, China for 4 years. PAK ARAB REFINERY LIMITED, PARCO (Pakistan) AUG’1998 – JAN’2002 I started my professional career by joining Mid Country Refinery Project (MCRP) department at Karachi, Pakistan in the capacity of Trainee Engineer (Electrical) in August, 1998. I was highly privileged by the PARCO administration to avail an opportunity to participate in the Attock Refinery Up-Gradation Project Limited at Attock Refinery Limited (ARL), Morgah, Rawalpindi, Pakistan, from February to July, 1999 during which my principal responsibilities were to get involved in the Electrical Installation activities of Heavy Crude Unit and Boiler Sections. This project gave me an opportunity to work in close consultation with:

Mitsui Engineering and Ship Building Company, Japan.

Sanzo Engineering and Construction Company, Japan.

Descon Engineering Limited, Pakistan.

Upon my successful return to PARCO Headquarters at Karachi, from ARL, Rawalpindi, I was promoted to the post of Engineer-III and was then transferred to PARCO’s Mid Country Refinery Project site at Mahmood Kot, Muzzarfargarh. During my stay at MCR, PARCO, I was actively involved in performing the following duties :

Construction work supervision, testing and commissioning etc.

Performed installation of all electrically operated equipment such as motors; transformers etc. according to the standard specifications by utilizing minimum manpower, material and time to ensure least amount of down time.

Monitored work carried out by subordinates to ensure adherence to standard quality.

Maintained installation record of electrical equipment.

Maintained close liaison with WAPDA and local govt. authorities regarding monthly electricity bills.

Performed duties of Shift In-charge.

Performed any other work assigned by immediate supervisor. APPRENTICESHIP AND TRAINING

1. Attock Refinery Limited (ARL), Morgah, Rawalpindi, Pakistan. Sent by PARCO in the capacity of Trainee Engineer (Electrical). February-July, 1999.

Functions Performed :

Equipment/Material Installation

Cable Laying/Termination

Punch Listing /Pre-Commissioning

Commissioning

Grounding Mesh Networks

HT/LT Motor Control Centers

Motor Start up Tests

Protective Relay Operations

Testing of Local Control Stations, Welding Outlets and Receptacles

Earthing of Tanks

2. Pakistan Water and Power Development Authority (WAPDA) Sent by N.E.D University of Engineering

& Technology, in the capacity of Final Year student. July 11- Aug 11, 1994. Training in Power Distribution, Line and Lab Practicals, Grid System Operation, Lab. Experiments, Gas and Steam Turbine installation and commissioning.

PROJECTS

1. MS Project Thesis: Design and Development of a PC Based Temperature, Humidity, Flooding and Smoke Monitoring System for a Remote Compartment Onboard PN Ship. The project was presented before the High Command of Pakistan Navy and was organized by Pakistan Navy Engineering College. The presentation was highly appreciated and it was recommended that the project would be installed at onboard PN ships. 2. B.E Project Thesis : Design and Feasibility Assessment of Medium Voltage Distribution Networks. EDUCATIONAL QUALIFICATIONS

Ph.D (ELECTRICAL ENGINEERING) ONLY COURSE WORK (No Degree) Completed 3 years of research for PhD Electrical Engineering from Beijing China. MASTERS DEGREE (ELECTRICAL ENGINEERING)

Pakistan Navy Engineering College, PNS Jauhar, Karachi, National University of Sciences and Technology

(NUST) Rawalpindi. Whole MS studies was sponsored by Pak-Arab Refinery,PARCO. Secured FIRST POSITION by achieving highest accumulative GPA of 3.63/4.00 (86%) throughout Pakistan. Awarded GOLD MEDAL by then President of Pakistan General Pervaiz Musharraf. Passing Year 1999. BACHELORS DEGREE (ELECTRICAL ENGINEERING)

N.E.D University of Engineering & Technology Karachi, Pakistan. Secured A-1 Grade (83%) 1996. INTERMEDIATE

Pakistan Steel Cadet College, Karachi, Pakistan. Secured A-Grade (77%). Passing Year 1990. MATRICULATION

Pakistan Steel Cadet College, Karachi, Pakistan. Secured A-1 Grade (81%). Passing Year 1988 AWARDS / SCHOLARSHIPS

Awarded GOLD MEDAL by the President of Pakistan on securing FIRST Position throughout Pakistan in MS Electrical Engineering Examinations 1998 from National University of Sciences and Technology, Rawalpindi, Pakistan.

Awarded Scholarship by Pak Arab Refinery (PARCO) Karachi, Pakistan, for MS Electrical Engineering Studies.

Awarded Shield on the successful completion of the training of Attock Refinery Up-Gradation Project.

Awarded Scholarship by Pakistan Steel Mills, Karachi, Pakistan on securing A-1 Grade in Matric Class. PERSONAL

Father’s Name : Shakir Khurram

Date of Birth : February 23, 1973.

Marital Status : Married

Nationality : Pakistan

NOTE : I AM EXTREMELY HARD WORKER AND HAVE VERY GOOD VAST EXPERIENCE IN THE FIELD OF MATERIALS PROCUREMENT / PROJECT COORDINATION / MATERIALS EXPEDITOR. IF GIVEN CHANCE TO SERVE YOUR REPUTED COMPANY, I WILL PROVE IT. IF SELECTED, VISA FOR MY SELF AND FAMILY (Wife plus one daughter) WILL BE REQUIRED. PRESENT SAUDI IQAMA IS NON-TRANSFERABLE.



Contact this candidate