RAJESH MEKALA
Dr.No:*-***/**A,Chengalarayudu thota
Bapatla, Guntur
522101, AP, India
**************@*****.***
****************@*****.***
CAREER OBJECTIVE
Put the hundred present effort to develop the company improve myself every day of working
Implement the new thoughts on projects for successful completion.
EXPERIENCE
TRIDENT ENGINEERS
ELECTRIC ENGINEERS
12th March2019 till on wards
I DID LAST PROJECT ICICI PRU LIFE INSURENCE OFFICE PROJECT FROM MUMBAI
KEY DELIVERABLE:
PROBLAM SOLVING IN PRODUCATION TIME.
TARGETS AS PER AGREED TIME LINE PROJECT COMPLETION
STRITLY OBSERVE THE PANEL INSTALLATION & MCB PLACEING
CABLE SIGE CALCULATION SCHEDULING & ITS ROUTE SELECTION.
PROPER PROTECTION SYSTEM FOR ALL ELECTRICAL INSTALLATION.
CLIENT COMMUNICATION AND CORRESPONDENCE
OVERALL RESPONSIBILITY OF PROJECT
RESPONSIBLE FOR HIGHLIGHTING FORESEEN PROBLEM & DEALYS IN ADVANCE ESCALATING TO THE PROJECT MANAGER
ESTIMATES AND PREPARE AND ASSIN THE RESOURCES SUCH AS MAN POWER,MATERIAL,EQUIPMENTS,TOOLS,ETC., REQUIRED FOR ALL ELECTRICAL & RELATED WORKS PRIOR TO EXECUTION.
UPDATING THE DRAWING DEPENDS ON THE SITE CONDITION.
MODIFICATION OF AUTOCAD DESIGN.
HANDLING OF ELECTRICAL LOADS AS PER REQUIREMENTS.
RSPONSIBLE FOR IMPLEMENTATIONS AND MONITORING OF ALL ELECTRICAL RELATED WORKS AT THE SITE.
DAILY & WEEKLY WORK PROGRESS REPORT PREPARATION AND KEEP THE RECORD & DAILY PROGRESS REPORT SUDMIT TO MY SUPERIORS.
I GIVE THE INSTRUCTIONS TO MY SUB ORDINATES
COORDINATION WITH WORKERS
MAN POWER CONTROLLING AND SOLVE THE PROBLEM
UPDATING OF MATERIAL STOCK
FINALLY I WIILL HELP TO MY SENIOUR MANAGER FOR BILLING
WEEKLY MATERIAL REQUIREMENT TO BE SEND BY EMAIL TO DAILY MAINTAIN ATTENDANCE PROPERLY.
STRTILY FOLLOW SAFETY PRECATIONS ON THE SITE.
MAK AWARENESS TO ALL PEOPLE. HOW TO SWITCH OFF POWER IN CASE OF ANY ELECTRICAL ACCIDENT.
REVIEW INSPECTION AND TEST PLANS IN ORDER TO PERFORM ALL REQUIRED INSPECTIONS AND WITNESSING ALL REQUIRED TESTS AND WITNESS AND HOLD POINTS FOR THE CLIENTS INSPECTION.
SITE ISSUES HIGHLIGHTING AND SEND TO CONSULTANT.
SITE ADDITIONAL WORK PREPARATION AND SEND TO QUATATION.
CHECK AND PLAN THE DATE AND SCHEDULE OF THE PROJECT.
EVERY TWO WEEKS ONCE ATTEND THE SITE TECHNICAL COORDINATION MEETING.
MONTHLY ONCE ATTEND THE SITE SAFETY COORDINATION MEETING.
ENSURE POWER SUPPLY AVAILABLE . SAVE ENERGY BY DISCONNECTING UN WANTED LOADS.
AL-Ahleia Switchgear Co.k.s.c.c, KUWAIT.
Assistant Production Planning Engineer
4th April to 7th October 2018
KEY DELIVERABLE:
Problems solving in production time.
Panels deliver on time.
HV switchgear Mechanical and electrical checking.
Panel interlocks checking.
Intermediate interlock checking.
All chamber clearance like (IP, VCB, BUS BAR, and REAR).
Paint quality checking and R Y B colors checking.
Earth switches clearance.
Material management.
VCB Rack in-out & VCB charging.
Shutter opening clearance by using trolley.
HV test arrangement.
Function Test.
CT Ratio Test.
CR(contact ratio) test.
Report work for delivery panels.
Panel final clearance.
Solve the problems at panel locking time.
HV switchgear for 11kv, 225KVA in 3Sec Feeder & Transformer panels.OC and E/F PROTECTION.
SSR ENTERPRICES
Electrical Engineer
August 1st 2012 to April 1st 013
KEY DELIVERABLE:
TO CHECK THE ATTENDACE PROPERLY.
STRITLY FOLLOW THE SAFETY PRECATIONS.
TO VISIT EACH AND EVARY POINT ON SITE TO CHCK THE WORK.
AND THEN CHECK THE MATERIAL(MATERIAL MANGEMENT).
TO READY THE DAILY REPORT.
THEN TOMMROW WORK ALLOTED .YESTERDAY EVENG TO MY JUNIOR ENGINEERS
DAILY GIVE INSTRICTIONS TO MY JUNIOURS TO INCREASE OUTPUT.
FOLLOW MY SUPERIORS INSTRUCTINS
RSPONSIBLE FOR IMPLEMENTATIONS AND MONITORING OF ALL ELECTRICAL RELATED WORKS AT THE SITE.
DAILY & WEEKLY WORK PROGRESS REPORT PREPARATION AND KEEP THE RECORD & DAILY PROGRESS REPORT SUDMIT TO MY SUPERIORS
GANESHAN BUILDERS
TRINE ENGINEER(ELCTRICAL)
15TH NOV 2012 TO 1ST MAY
KEY DELIVERABLE:
Observe the work location.
Material checking.
TO IDENTIFIY THE FAULTS
THEN FIND OUT RECTIFICATION TECHNICS.
TO MAINTAIN DAILY REPORTS.
EVERY DAY EVNG I SUDMIT MY REPORTS.
APSPDCL(CONTRACT)
ELECTRICAL SUPERVISOR
1TH JUNE 2012 TO 1TH JULY 2013
KEY DELIVERABLE:
TO CHECK THE ATTENDANCE.
Material checking.
OBSERVE THE WORK LOCATION.
OBSEVE MAN POWER.
CHECK THE WORK PROGRES.
MAINTAIN THE DAILY REPORTS.
ACCHIVMENTS
I got first prize in state level Robotics championship conducted by NRC India Robotics championship in 2016 IIT MADRAS
My team select the Grand finale of NRC India Robotics championship in 2016 IIT MADRAS.
Stood 1st in project expo conducted by Acharya Nagarjuna University
Won 1st prize in national level technical quiz
Won 1st prize in power point presentation.
Stood in 1st place in Project Expo competitions at five colleges during technical fest.
I attend the Fire & Safety work shop conducted by KING’S Institute of Fire & Safety Engineers, HYD.
Senior Under Leader of my college NSS teem @2016.
Given project completed within time.
Conduct the departments Events in second year.
Student Disciplinary comity number.
Participated in many national level technical fests and won 1st prizes.
Participated in many State wide and town wide Talent test during school day
STRENGHTS
Traubel shooting the problems
Solve the problems.
Project completed within time.
Ability to work in a team.
Good Analytical and problem solving ability.
Quick learning.
Honesty and Patience.
Flexibility and Adaptability.
Stress Tolerance.
Creative thinking on project.
EDUCATION
B.Tech in Electrical and Electrical Engineering from Chirala Engineering College,CHIRALA recognized by J.N.T.U,KAKINADA during the period 2013-2016with 74.04%.
Diploma in Electrical and Electrical Engineering from Bapatla polytechnic college, CHIRALA recognized by State board of Technical Education, during the period 2009-2012 with 75.35%
S.S.C from A.V.V HIGH SCHIOL, BAPATLA recognized by Board of Secondary Education, during the period 2009 with 77%.
ACCADAMIC PROJECTS
PROFICIENT ENERGY METER.
Role on project: Team Leader
ABSTRACT:
The main objective of the project is to save the SAVE THE ELECTRICITY.
Role on project: Team Leader
ABSTRACT:
The main objective of the innovation is to develop an energy meter that informs the
consumer about exact consumption and billing of load consumed, through SMS and to
protect the home appliances and equipments from over load conditions. It also has a special
feature of interior circuit breakdown alert.
EXTRA CURCULAR ACTIVES & HOBBIES
Successfully completed 6 months training in Satya maharishi power corporation limited
Can troubleshoot minor software and hardware problems of computers
Participate the many college fests.
Co ordinate the NSS camps
Field of Interest About Electrical equipments and its operation
Co ordinate the Medical cams.
ACHIEVEMENTS
Stood 1 st in project expo conducted by Acharya Nagarjuna University
Won 1 st prize in national robotics workshop
Won 1 st prize in national level technical quiz
Won 1 st prize in power point presentation
Stood in 1 st place in Project Expo competitions at five colleges during technical fest.
Participated in many national level Technical fests and won 1 st prizes
Can speak English, Tamil, Malayalam,Hindi and Telugu languages fluently.
Participated in many State wide and Town wide Talent test during school days
TECHNICAL SKILS
House wiring.
House appliance installation.
Ms-office.
Operating system Windows& Len-X.
Proper using system.
Ms-office.
PLC programming.
Diploma in Computer applications.
PERSONAL DETAILS
Date of Birth : 25thJune 1994
Language Abilities : English, Telugu, Hindi, Tamil, Malyalam
Gender : Male
Father’s Name : Koteswara rao
Mother’s Name : Mariyamma
Religion : Hindu
Nationality : Indian
Marital Statius : Un-married
Pass port No : R4558449
Permanent Address : D.No.6-233/37A, Chengalarayudu thota, Bapatla.
(Mandal) Guntur (district) AP-522101.
Declaration
I hereby declare that all the above information furnished is correct and true to the best of my Knowledge.
Place:
Date:
(RAJESH MEKALA)