Post Job Free
Sign in

Piping Construction Manager

Location:
Stuttgart, Baden-Wurttemberg, Germany
Salary:
5500
Posted:
July 18, 2020

Contact this candidate

Resume:

CAREER OBJECTIVE

I am a professional with ** years of rich experience in the fields of Piping & Support Fabrication, Erection and Installation of Pipe, pipe support and structure, revision and modification,well hookup, punch list, testing & commissioning, shoutdown of pipng and static equipment in Offshore & Onshore experience and a proven track record of success within EPC working environments. Results orientated & quality focused with Training management & supervisory skills but equally comfortable working in a ‘Hands-On’ or Training role. Able to read and Interpret drawings such as Isometric drawing, GA drawing & P&ID.

TECHNICAL QUALIFICATION

Diploma in Mechanical Engineering MS Office, Excel Internet

PTW AND OFFSHORE TRANING COURSE

PTW Traning Adma Abu Dhabi (Job Performer)

PTW Traning North Icland Adnoc Abu Dhabi

PTW Traning Orpic Oman

PTW Traning Sabic Saudi Arabia

TBOSIT Vallied 23 April 2023 and H2S Vallied 26 April 2021

Coad & Standards

Exposure to ASME, ANSI, ASTM, API

.EXPERIENCE SUMMARY

1.Worked at Arabian Industries LLC (Abu Dhabi) as a Piping Supervisor from 21 April 2019 to until now in Umm Saif Super Complex in ADNOC Offshore.

Responsibility:

Monitoring of well hookup activities such as fabrication, erection and Installation of piping & support required for the construction Activity and shutdown of piping and static equipment.

Reporting daily progress reports and inspections of task activities to Adnoc const engg.

Participating and preparing of Job Safety Analysis for the given Job to categorize and measure the Precaution for the task to Carryout job safely without LTI.

2.Worked at Inco International Company (Sohar Oman) as a Piping Supeevisor from 20 July 2018 to 30 Nov 2018 at Liva Plastic Project.

Responsibility:

Fabrication pipe spool of CS, LTCS, SS & ALLOY STEEL.

Daily progress reporting and meeting attendance to communicate.

Inspection of spool and all type material codas with Clint vendor and contractor.

Modification as per test packs requirements producers

Preparing as built Isometric as per site condition

Fabrication and Erection Pipe spool in site location.

3.Worked at National Contracting Company (Jeddah Saudi Arabia) as a Piping Supervisor from 3 Oct 2015 to 16 Aug 2017 Naphtha & Aromatic.

Responsibility:

Organizing, coordinating and controlling the erection and instolation work both performed by direct hiring, ensuring the management of interfaces with production, engineering and methods disciplines.

Preparing and monitoring of fabrication sequencing as per codes and standards during Fabrication work is performed in accordance with the approved.

Preparing as built Isometric as per site condition

Fabrication of pipe and support, Erection and instolation of Pipe spool, pipe support and structure as per site location controlling manpower and reported daily progress report

4.Worked at Samsung Engineering (Uzbekistan Russia) as a Piping Foreman from 02 Feb 2015 to 30 May 2015 UGCC, GSP, & Polymer Project.

Responsibility:

Spool erection and modification as per test pack

Atand the punchlist of cetegray type A, B and c.

Monitoring manpower every location, makng progress report and manage of time sheet.

5.Worked at NBTC. (Ruwais Abu Dhabi) as a Piping Supervisor from 06 Nov 2013 to 24 Nov 2014. Bhruj 3 in PP3 & PP4 Project.

Responsibility:

Preparing and monitoring of fabrication sequencing as per codes and standards during Fabrication work is performed in accordance with the approved.

Fabrication pipe spool and related of pipe support in yard.

Monitoring foremen, daily production fit up and welding records and report Status Performed to The Construction Manager. Participating and preparing of Task Risk Assessment for the given Job to categorize and measure the Precaution for the task to Carryout job safely and without LTI.

6.Worked at AYTB (Jubal, Saudi Arabia) as a Piping Supervisor 07 Feb 2011 to

17 Aug 2013 Sipchem Project.

Responsibility:

Coordinating and controlling the fabrication of pipe and related of pipe supports works in fabrication yard, both performed by subcontractors or ensuring the management of interfaces with production, engineering and methods disciplines.

Promoting safe works practices and environmental protection, ensuring that safety standards are respected.

Sending feed backs to the line managers for maintaining the project schedule on time. Having a Working knowledge in gas and oil field with all kind of Fabrication and Erection inspection Techniques for various applicable Standards

Performing construction and scrapping activities. Clearing the punch list construction Activities

And site modifications advices from client & Quality Control Department as well.

Inspection of spool and all type material codas with Clint vendor and contractor.

Modification as per test packs requirements producers

7.Worked at Gulf Petrochemicals Company (Safa, Oman) as a Piping Foreman Forman from 05 Nov 2009 to 09 Nov 2010. Methanol Project.

Responsibility:

Piping spool fabrication and erection as for standards.

All type valve installation and replacement at site.

All location manpower location monitors work

Co-ordination with Clint vendor and Clint

Comprehensive problem solving abilities, Interested in team working.

Performing construction and scrapping activities. Clearing the punch list construction Activities and site modifications advices from client & Quality Control Department as well.

Preparing and monitoring of fabrication sequencing as per codes and standards during Fabrication work is performed in accordance with the approved.

Responsibility

8.Worked at Newton Eng. & Const. Co. Cochin Refinery as a Fabrication Forman from 17 Nov 2002 to 16 Sep 2005.

Fabrication pipe spool and related of pipe support in yard

Piping spool and support erection and installation as for standards.

Co-ordination with Clint vendor and Clint

Comprehensive problem solving abilities, Interested in team working.

9.Worked at Petron Eng. Const. Co. RPCL Motikhavdi Jamnagar as a pipe fabricator from 15 May 2000 to 08 Aug 2002.

PERSONAL INFORMATION:

Father’s Name : Late Rajendra Singh

Date of Birth : 12 OCT 1983

Religion : Hindu

Nationality : Indian.

Marital Status : Married

Languages Known : English & Hindi

PP DETAILS:

Passport detail : ECNR

Passport Number : M 3594584

Date of Issue : 12 NOV 2014

Date of Expiry : 11 NOV 2024

Place of Issue : LUCKNOW

I hereby declare that the above-mentioned information is true to the best of my knowledge.

REFERENCES Yours Faithfully,

Place: PADRAUNA KUSHINAGAR, UP. INDIA (SAHRADA PRATAP SINGH)



Contact this candidate