Post Job Free

Resume

Sign in

Manager Construction

Location:
Torrance, CA
Salary:
$102,000/annual
Posted:
July 17, 2020

Contact this candidate

Resume:

(Henry ) Shing Chiang

**** ***** ** **** ** Lomita, CA 90717

Contact Mobil: 323-***-****

P. 6 - 1

Skills:

Perform CAL OSHA safety and health regulations as required as well as 2008 16 hr Safety compliance company,2009 8 hr construction safety training of U.S. Department of labor Occupation Safety and Health Administration and plus 2009 "First Aid" 8 hr training of EMS Safety Services with certificate on files. Use Microsoft Office "Project "and CPM for scheduling.

English, Mandarin, and little Spanish

Working Experience:

2019 July~ Now H. T&E Inc. Torrance, CA

Property Manager /Project Superintendent

Remodel and completed a custom spec home ($3,785,000) in Arcadia included outdoor swimming pool refinishing, and 3 single family houses, plus a child preschool, a Chinese tea house restaurant, and a fast hamburger restaurant in Disneyland sightseeing circle area.

Meanwhile to deal for company to manage and buy a lot for 16 units of single family in city of Cerritos. Also handled the construction planning, subcontractor selection, and budget analysis and preconstruction

management, included select Architect, Consultant, review the designed blueprint, and apply the pemits, etc.

Owner (Supervisor): Karen Lu, Address: 2427 Torrance Blvd., Torrance, CA 90501; Tel.:310-***-**** (44hrs/ week)

2018Apr.~ 2019 June GLC Construction Inc. Monterey Park, CA

Construction Superintendent / Assistant Manager

Worked for Home of Christian Phase II new church site management and supervising, construction

Worked for Home of Christian Phase II new church site management and supervising, construction submittals of foundation, structure' (Structural Steel, Framing raised up ceiling details, Roof solar

panel installation details, and Baptistery pool installation details, Sound control wall and ceiling details, etc) and finish work shop drawing of 3 residential projects.

2016 Jan.~2018 Apr.. R.I.C.E. Construction Co., Los Angeles, CA

Project Field Superintendent

Worked for A 812 room LAX GATEWAY SHERATON 5 STAR HOTEL renovation construction as the Project Manager responsibilities included 1st FL LOBBY BAR, POOL SIDE AREA, Star- Buck Coffee Store, and Paparazzi Restaurant remodeling total 100,000sf (under hotel business opened condition to perform all construction management), additional to remodel 3rd FL & 4TH FL and Pen House guest rooms and office construction, included guest rooms renew construction and project design review and correction suggestions ( Especially the Electrical facilities revision to discuss and got approval with inspector of city of Los Angeles.) with project owner representative, cost estimate & predict budget. site management, all inspection items management and administration for building items and Green Engineering, project material and performance submittals, project cost analysis, sub-contract line-up and contract condition negotiation, overall schedule (Microsoft project) and mile stone, bi-weekly working schedule submit, bi-fold store front window installation trouble – shooting, make sure millwork & white oak with stain to match architect's selection. Room furniture selection with hotel owner representative and hotel management team for mock - up single bed room, double bed room, family rooms final decision, pen-house special room and interior designer study, LAX city permit and inspection administration and management, project risk management and control monthly payment & cost analysis, site construction planning & management, site problems trouble-shooting, etc.

Supervisor: Leo Yao, (President of R.I.C.E. Construction Inc.,); Address:1613 Chelsea Rd.,#286, San Marino, CA 91108 Tel..:626-***-**** ( 40hrs/ week)

P. 6 - 2

2010 Jul.~ 2011 Jun ; 2014Nov.~2015 Dec. H. T&E Inc. Torrance, CA

Property Manager /Project Superintendent

Remodel and completed a custom spec home ($1,785,000) and 14 single family house($ 780,000/each) in Torrance, CA included property management, and take over, remodel over-all schedule (Micro soft project), cost estimate & predict budget, bid and invited for bid, prepared standard contract, signed contract and line -up the contract per work sequence. design review meeting, public hearing, and pull permit and in advanced quality control, site management and supervising, included site fence & false work of site office & meeting room and storage, site utilities removal and public work, site telephone, temporary power, water application and installation kick-off, site level control and check, import the dirt per approved civil plan & grading work, site measurement and layout with civil engineer surveyor team, city inspection management, retaining wall application, footing and slab excavation, electrical grounding & UFO installation & inspection, plumbing and Drainage main inspection, water pressure testing & inspection, Framing contractor double check the hole down, column base locations, and other insert

items per plan, purring concrete per pouring plan, framer layout the wall locations, framing exterior side of wall, installed insulation & material inspection, EMP rough - in correction and completion inspection per approved plans and code requirements, framing inspection, roof inspection & ventilation screen, and total height check, interior shower pan leakage testing and inspection, exterior stucco black paper and lath inspection, ceiling and roof insulation installation, dry wall installation, Conner beads & and tapping, interior door jamb installation, roof tile lay on roof, light weight concrete installation, stair railing installation, window and waterproof foam sealed, install font entrance door & metal framed fire rated back door, finished work per mock-up units, EMP panel, meters & fixture installation finish operation test & inspection -including electrical main panel hook-up, landscape, street lights & exterior parking asphalt paving, signage & stripping, cub and gutter, driveway approach, park drains and catch basin of yard drain line per civil plan., landscape construction & inspection, final inspection, certificate of occupancy, go through with buyer and corrections, and hand-over to the buyer.

Worked for property investment planning & risk management and conducts property audits, provided guidance on government regulations pertaining to property accountability, develops, property

administration policy; assists on inventory process, overseen the commercial office & residential property purchasing contracts & price dealing, property evaluation, utilities examination and building inspection, re view the property recording and grant, review the legal description, and property line, insurance management, rental or leasing operation & contract close-out & coordination, property maintenance arrangement & services contract administration, accounting ledger and tax management. Meanwhile handled 3 units of 2 million custom homes in Polo Vedas / Torrance construction bid and

AIA contracts. Also handled 2 single family house property, 1 multiple-unit commercial and 1 multiple-unit residential property all removal and refinish included select architect and consultant, interior design, pull permit, cost estimating, bid and contract management & administration, construction site management and supervising, inspection management, etc.) for sale, completed with the budget & tight schedule control to hand over the property on time.

Owner (Supervisor): Karen Lu, Address: 2427 Torrance Blvd., Torrance, CA 90501; Tel.:310-***-**** (44hrs/ week)

2013 Dec..~2014 Oct. Syncept Real Estate China Pe-Jing, Hi- Nan/ Walnut, CA

Construction Manager

Worked for HAI-NAN BO-AU project (In Hai-Nan Province, China), a group building construction project, included a high rise group multi-family housing (existing 22nd story structure completed and a-2 story high round shaped association office, 1- 44 story high 5- star Hotel and retail complex, 1-44 story high hospital and senior care institute, and 814 units of 2 story villas( Total project value is U$3,750 million) construction. Total lot size is 292,022 Square Meter. Also to select project main contractor and finishing main contractor, The Architect from Hong Kong. Landscape consultant and

P.6 - 3

contractors( From Wan Ling city has 3 time capital amount and 3 time experience compared to our existing one) for the project. project cost estimating, budget, construction method, construction facilities selection, and design contract fee estimating, quality control planning, scheduling by Microsoft Project, etc.

Furthermore handled the existing 22 story high-rise residential( w/1story high basement) re-planning from 120 SM/per unit into 2 units @60 SM/per unit and project under high salty corrosion special prevention study& program (Included all metal stuff, and structural materials) to main contractor & architect, plus to the basement construction study under sand soil condition and hotel franchiser invitation. Search the China & International potential partner of Senior care chain institute in Hainan Bo-Aou, Pe-Jing, and Los Angeles. Prepare all of those related contracts. Design review reports for 167 unit senior care institute in city of Walnut. Cost estimate & predict budget and cost control planning

(including hard cost and soft cost.), find qualified and quality contractor in area, construction schedule, material vender screened and selected. Meantime select and study the major project material venders.

The duties included a senior care construction in City of Walnut, included land property purchasing, and deal with architect, overall schedule (used C.P.M. method)review the design plan and report to Pe-Jing Headquarter for approval, main contractor research, material vender check. But this project is too early to invest the Hai-Nan is still waiting for more developed, therefore whole project is delay a lot now.

Supervisor: (48 hrs/ per week); U.S. Branch CEO: Fred Jiang; Address:17700 Castleton Street, #468, City of Industry, CA 91748;Tel.:626-***-****. (40hrs/week)

2002Apr.~2003,Jan;2013Feb.~2013Dec. Landwin Management Corporation San Gabriel, CA

truction Project Manager / Superintendent

Assigned Construction Project Manager for Marriott Hotel and Retail Complex project( upgrade 7 story high) handled project budget set-up and the basement construction (2 story x 90,000 SF), total 500,000

SF post tension concrete deck, construction method planning, cost estimate & predict budget, invitation for bids, standard contract preparation, schedule ( Micro-Office Project), etc. As well as to maintenance the existing Hilton Hotel and Plaza for refinish the swimming pool, boiler and hot water pipe maintenance, and managed the remodel of 222 rooms finish work and bath room, furniture, and decoration and discussed with the Interior design, Plaza retail electrical meter expansion, basement led lighting new installation project and energy saving control, etc.

Supervisor: Sunny Chen ;Tel.:626-576- 8000; Address:227 W. Valley Blvd,. Suite 308, San Gabriel, CA 91776 (40hrs/weeek)

2011June ~2015 Jul.. U.S. Small Business Administration (SBA)/ Herndon, VA/ Torrance, CA “Construction Analyst & Construction Inspector” and Building Inspector of Damage Verification Center (Term)

Supervisor name: Susan Simon, Tel.: 716-***-**** x 1346 ; Operation Manager: Laura Crielly, Tel.:703-***-**** x 6712 ; Address:13221 Woodland Park Road, Herndon, VA 20171.

2007Nov ~2010 July Pan Construction Incorporation San Gabriel, CA

Superintendent / Project Manager

Worked for The Atlantic Shopping Time Square Mall Construction that is a city redevelopment commercial & residential complex. The total construction cost is U$128,000,000.00. Construction on site

P.6 - 4

superintendent and supervising of 4 story@300,000 SF basement construction, included cost estimate & predict budget, layout and elevation & floor height control, grading and dirt export, public works, and lagging and solder piles, caisson piles, post - tension, shot-crete, meridian water drain waterproofing, grouting, structure steel, concrete work, underground, utility removal, crane – tower, grease tank, parking ventilation system, etc. continue to supervising the metal stud framing, insulation, dry wall, stucco, iron work, window and fire doors, and roll-up doors, store-front, hotel entrance lobby wood finish work, restaurants and kitchen equipment, roof exhaust fan units, A/C system, and roof cooling tower, escalator, lifts and grease pit, ramp drive way & approach, side work and quarry –stone paving, asphalt paving, signage & stripping, 1st and 2nd floor store and mall area E&M, fire sprinkler, and low voltage, and finish

carpentry, stone finish work, tile, pluming fixture, electrical fixture (Passed final EMP inspections), planter box, painting work, and store IT work, 14 screens AMC cinema theater, etc. Complete 3 mock-up units and 210 units of high quality condos of 2nd ~ 6th floor.

Also the project manager for 60 tract – homes, planning & construction project in city of Los Angeles. Project planning Included the architectural & structural drawings, site plan, and E&M designed

drawing review & check, permit drawings and calculation review, grading revised permit plans and soil

report review, bond, and all clearances. Construction management included the site preparation, bid and

contract line-up, cost estimate & predict budget, grading pre-construction meeting, erosion control, construction method, material research and work with 4 interior designers. Grading (import dirt 17,000 cu

yd), retaining wall, 3 model homes included interior design review the style, material and furniture selection, and another 23 unit construction, from grading to roofing, from structural to finish work, and from site management to inspection management for all inspection items as city requirements. Besides handled the A and B-permit all plan- check and permits of the 7,000 ft long off-site work and DWP joint trench work included pavement and stripping, parkway, sidewalk, underground, DWP water & power, joint trench with power, gas, & telephone, bus stop bay, oil pipe, gas, & telephone line removal, street lights, traffic lights, 23 feet deep sewer main and house sewer lateral connection, street trees, traffic control plan, site trouble shooting. Total project value is U$ 78 million. Meanwhile handled request for proposal and contract, schedule control, AIA format budget control, RFI review & change order, monthly payment request review and approval.

Besides the project manager to manage a 2 – story height Garfield Medical Center in city of Monterey Park, including overall schedule control (Microsoft project) bid & contract line –up, site management & supervision, included grading, footing & slab, structure steel column and beam dimension check, block wall and floor & roof ledger and angel bolt location calculation and floor height control, framing, panelized roofing, sky light and roof drain check and determination, EMP rough–in and ceiling height control and finish determination, elevator “coordination and roof tower” and headroom check & determination, dry wall and metal stud system study and determination, insulation, window installation, store front and waterproofing deck detail determination, gyp-create floor, T-bar ceiling, and determine the application method to prevent from the cracks on the floor in the bathroom, finish carpentry work of door frame installation, plastic base, window & door casing & molding for dropped ceiling and door opening, window stroll, closet, install all doors included solid wood doors, hollow wood doors, roof hatch door, trash bin metal gate, wood louver door, metal doors, fire rated door, and bi-fold door, fire- place & wood mantel, painting, cabinet, tile and granite countertop, plumbing fixture, electrical panel, switch board, elevator cart install and finish work, lighting fixture & exhaust fan installation, A/C fan coil unit installation per mechanical drawing, fresh air make-up unit, ceiling diffuser, exhaust grille, and thermostat installation, make sure the application method of stucco to prevent from cracks, exterior color aluminum panel finish, fire alarm, fire protection &double- check valve installation location check and determination, yard drain and catch basin with filter, water meter relocation and street improvement work per city request, sewer connection, landscape, walkway and handicap ramp, parking lot sub-grade compaction and CMB for curb and asphalt paving, stripping & signage, final check and testing.

P.6 - 5

completion report & the certificate of occupancy. Plus RFI and change order review and bid and contract for the project. Total construction cost is $1,200,000; included bid & contract line –up, site management & supervision for dentist, internal medicine, senior cares, eye clinic, family doctor clinic, pharmacy, etc.

Meanwhile handled the owner contract per AIA format, specification and bid cost for 80 unit apartment of bank fore-enclosure project in city “ West Wechsler area ”of Los Angeles.

Mr. T.C. Pan (President), Tel.: 626- 780-2314; Address: 404 South San Gabriel Blvd., San Gabriel,

CA 91776. (44 hours/week)

2006Apr.-2007Nov. Renovation Construction Project Manager & Facilities Maintenance Supervisor TAWA (99 Range) Supermarket Inc. Buena Park, CA

Project manager for building evaluation & title I underground testing, prepare owner program, renovation construction contract, scheduling(Microsoft Project) and budget management (Included Consultant selection, pull permits, bid & contract administration, construction supervision, and project management for a new store 168 whole-sale supermarket store in the City of Alhambra, 2 new (For plumbing, sewer, water, gas, fire protection underground, air conditioning, refrigeration system and case, check stand, merchandise stock shelving, fish tank, hood, kitchen, hot food and flooring, framing, dry wall work, FRP

& stainless wall panel, roofing, store front, roll-up door, loading dock, sky lights, epoxy floor, painting work, signage work, asphalt, C.U.B. wall pavement & stripping, flat concrete, park- lot lighting, landscape, signage, etc ) stores North California (San Jose and Oakland), and a shopping mall (retails) with a new supermarket store in the City of Chino Hills. Also contact the project designer, architect office for permits, and prepare construction site supervision and management of DS Bakery Central Kitchen of

walk – in freezer and cooler, roof equipment loading structure-check and reinforcement, and 1500 gal grease tank installation, custodial services & office equipment rental management.

Maintenance supervisor for 24 existing supermarket store and 6 distribution center (Chicago, Huston, New Jersey, San Francisco, Orlando, San Diego),except California there are 2 stores in Seattle. Also repared owner Program (Used Auto Cad 2003), equipment list, fixture list, equipment list, and the scope of work, cost analysis, interior design, signage design and exterior, renovation construction management,

and schedule control, bid and contract management and administration. Also handled a head office computer center relocation project with Halon fire protect system. Meanwhile handled and solved the Irvine store #2 EPA issue of drainage discharge problems with community property association "Irvine Company", also to solved the Safety and Hygiene of Rowland Height store successfully relocated the rain water pipe out of store warehouse area. and connected to local rain water main on records.

Supervisor: Vice President Mr. Harry Sun; Tel. 714-***-****; Address: 6281 Regio Ave., Buena Park Orange County, CA 92620 (40hrs/week)

2003 Jan~2006 Apr. Construction Project Manager & Superintendent San Polo. Development Corp.

Baldwin Park, CA.

Completion a (Hacienda Height 35 acre hill-side) 30 High -end gate custom - home projects planning, design review with owner, designers, and consultant; bids & contracts management and administration, site construction supervising and management cost management and set-up budget, scheduling (Microsoft Project) review and decide all of details. Prepare sub-division, zoning, hydraulic calculation and drainage planning, environmental survey, rough grading, State Fish & Game permit, raw material (dirt) hauling trucking route planning, oak trees permit and protection, American Water board and Army Corps permit, erosion control plan, flood restrict area planning and lot plan review, soil & geology report of rough grading, rodent control, irrigation and landscape planning, junit net & ground-cover of filled and cut slope protection proposal, and construction supervising 2 model homes, and plan other of 18 units' designs and 35 acre hillside grading, with road improvement, utility and underground relocation (included gas, SCE, telephone, make the mock -up with company interior designer sewer, water, storm water, drainage, site concrete, retaining walls, bus stop and Shot-create swales etc.), and 100,000 cu yd

P.6- 6

dirt export and construction problem trouble-shooting ; periodical to trim weeds, bushes, and to clean tribes and weeds with Engles Shen Associates,Inc. & Engineering and Geotechnology Laboratory Inc. two consultants about 13 months; Also planning and supervising 35 acre hillside grading, with road improvement (paving and stripping ), utility and underground relocation (included gas line, Edison, telephone, sewer, storm water, drainage, water, fire-hydrant, site concrete, retaining walls, bus stop and shot-crete swales - terrace drain, slope down drain, rip- rap, splash wall etc.), and 100,000 cu yd dirt export management, and construction problems trouble-shooting. Also to discuss with Los Angeles County public works Department, Regional department, State fish & game office, Army Corps, and

American Water Board for permits of above mentioned construction submittals and proposals. Also manage the road asphalt pavement, stripping, and signs (Total 171,390 SF) of La Verne Business Park.

for the City public works department. Site management included layout, excavation, from footing to roof, from finishing to structure from grading to landscaping & pools.

Supervisor: (President) Johnny Mohr- Tel.: 626 - 814 - 9556, Address: 13457 Brooks Drive, Baldwin Park, CA

Citizenship: I am U.S. Citizen.

Certificate and License: 1.) I have California State Contractor License no.: B – 7657000 ( from 07/13/1999).

2.) I also have I.C.C. issued Building inspector certificate no.: 1139774( from 05/22/2004)

Education: 1.) Major in Architectural Engineering (Awarded the bachelor Degree of Science) of Feng -Chia University

2.) I also have the MBA master degree of California American University

Training: I have attended “J Shen Real Estate Shool,” in city of Walnut and passed “Real Estate Principle, Finance, and

Pratice” 3 courses, and ready to application for State Real Estate sales person examination.

My 3 references listed as below:

1.) Mr. Rick Smith, Senior Project Manager /estimator of A. J. Harrison (Roofing) Inc.;

(Cell): 909-***-****

2.) Can's Plumbing Corp. Mr. Can, The owner of Can plumbing. Tel.:310-***-****

3.) Winsor Painting, Mr. Charlie Yu, The owner of the company; Tel.: 818-402- 0384

Attachment:

1999Apr.-2002Apr. Assistant Manager/Project Manager & Facilities Manager San Polo Development Corp.

Baldwin Park, CA

Project planning, design review and comments, bids & contracts administration, budget administration, project construction management, technical study and decision, train new superintendents, site clerks, completion for a 39 new tilt-up buildings of the business park in the city of La Verne. Responsibility for: Meeting with City building and planning department, job-site construction problem's troubling- shooting, bids, negotiation price & conditions of all trades' contract,(With main contractor) project cost summarized, submittal drawing and document, comment filing and follow-up, change- order review, select qualified & quality contractor & vender for the projects, coordinate with designer and consultant, specification and detail drawing check. Project planning and management for 12 units and construction management & supervising and completed on schedule. Solve the foundation of structure issue, and interior design for marketing principles with landlord, select and screen the line up work item contracts independently. Have 39 unit tilt up budget and construction planning, and overall project budget and schedule administration. Also supervise and 8-unit condos w/ subterranean garage & retaining wall.



Contact this candidate