Post Job Free
Sign in

Architect - site inspection,monitoring, implementation,safety

Location:
Doha, Qatar
Salary:
14,000
Posted:
July 16, 2020

Contact this candidate

Resume:

Leonardo MagallonaEsguerra Jr.

Qatar Mobile +974-********

*****************@*****.***

*************@*****.***.**

Site Architect Inspector

Position Applied:

CAREER PROFILE

To be in a position where I can effectively and efficiently utilize my skills in my field of my Specialization and to excel in the field of Architecture and Building Construction, Work with professionals, learn and integrate with them for the success of the firm involved.

SUMMARY OF QUALIFICATIONS

30 years’ experience in the field of Architectural Engineering Construction Management, work progressmonitoring, Site Inspection,Verification and Implementation, Supervision and coordination to all Engineering Discipline. Review design drawings, materials, execution of works in site, ensuring that the works are within the project standards, specification and project quality plan.Able to work with multi-cultural people, can easily adapt to the work, situation, fast learner, hardworking, having a flexible character, easy to get along with and can work under pressure,Positions held as Site ArchitecturalEngineer, Senior Site Architect, Project Architect Interior Designer, Service Engineer, In the country such as Philippines, Japan, Kingdom of Saudi Arabia and State of Qatar

PROFESSIONAL EXPERIENCE

GEIC, Doha State of Qatar

Site Architect Inspector April 2018 – May 31, 2020

Supervise and monitor actual execution of the Architectural FinishesWorks to ensure the work is carried out to the client’s standards and compliance with the approved drawings, specification, correct materials, workmanship and schedule.

Reviewing, responding to and acceptance of shop drawings, Material submittals,Inspection of Mock-up installation, review Architectural Method Statement, evaluation of manufacturer and supplier pre-qualification documents, respond to WorkInspection Request (WIR), Undertake the weekly progress and monitoring report of on-going works as assigned by the Sr. Resident Engineer (RE).Issuance of Non Conformance Notice (NCN), and Surveillance Deficiency Report (SDR), Attend weekly coordination and technical meeting with client and main contractor regarding the status and progress of the ongoing project, regularly interfaces with other engineering disciplines as well as other departments. Maintain standards of safety and comply with Company’s Health, Safety and Environment Management system

Project Involved:

DOHA PORT RE-DEVELOPMENT PROJECT QATAR (DPP)

Project Description:

Garden District-South &North, Admin, Building, Infra Streetscape, Sport Marina, South Marina, Floating Parks and Parking Building, Iconic Hotel, Mina District, Mina Basin and Grand Terminal and Diving pool.

His Highness Sheikh Hamad Bin Khalifa Al Thani, Emir of the State of Qatar, issued Emiri Decree No. 37, setting forth the creation of one of the world's largest green field port developments. A megaproject Strategically located south of Doha along cornice, the QAR 27 Billion (USD 7.4 Billion) megaproject.

QATARI DIAR VINCI CONSTRUCTION, Doha State of Qatar

Project Involved:

LUSAIL LIGHT RAILWAY TRANSIT (LRT –Depot Qatar)

Site Architectural Engineer Sept 2016 – Dec 2017

Responsible for day to day site monitoring, implementing Quality Assurance and control, conduct inspection of temporary and permanent works, Making sure that subcontractors are executing as the approved shop drawings. Prepare Inspection andTestingRequest (ITR) and follow up with the consultant and QC to inspect the site work. Preparing daily logs and report and maintaining records of inspection made, tests performed and work executed through. Observing, Implementing and ensuring that site safety practices.Supervise and oversee the installation of structural steel works andExecution of block work, Paintings, Gypsum board, Water Proofing, Screed, Cladding, Raise Floor and others architectural finishing works. Handle all electronic and hard copy archiving of documents ensuring that referencing of such is conducted with due diligence in order to enable access and future retrieval by users. Assist and support the Project Team in resolving any related quality issues / problems initiated by Consultant and Client at site. Ocular factory site visit regarding status of fabrication. Deliver on site, under paint, paint completed and pre planning stage. Support section engineer for daily site activities. Raising Cost Impact report or other damages to investigate any impacts result in more cost or work has to be done. Prepare MEP clearance for walls, ceiling and floors prior closures.

Project Description:

A CONSORTIUM of Qatari Diar Vinci Construction (QDVC) and Alstom was awarded a €2bn design-build contract by Qatar Railways for the Lusail light rail project at a ceremony in Paris on June 23 attended by President François Hollande of France and Sheikh Tamim Bin Hamad Al Tani, Emir of Qatar.

Depot Plot Area: Buildings Area: Administration and OCC Building 7,396 m2. Maintenance Facilities Building Maintenance Building 9,095 m2, Stabling Building 10,975 m2, Service Station Building (Daily Inspection and Washing)2,021 m2, Security Building 1 & 2 62 m2.Technical Buildings Under Ground Water Storage (Including Pump Room)649 m2, Central Chilled Water Plant 1,627 m2, Combined TPS and LPS 1 - 584 m2, Stabling Building MEP Plant (Including LPS 3) 408 m2, LPS 2 – 279 m2, Energy Equipment Storage Building 279 m2 and Trash Pickup 237 m2

KEO International Consultants (PM/CM International) State of Qatar

Site Architect June 2006 – June 2016

Responsible for site condition prior to start of construction activities, Verify the compatibilities of the site designed permanent works. Check for obstruction photograph & document the condition of existing Property that might be damaged by the work and make sure all existing structure, property, utilities and landscaping are properly protected.Perform works with accordance with the contract administration procedure manual. Observe site safety practice and the progress of the work and Report any concern, reviewing, responding to andacceptance of shop drawings, material submittals and design related questions. inspection of Mock-up installation review of project specifications and architectural method statement, issuance of Non Conformance Report (NCR), and Surveillance Deficiency Report (SDR), evaluation of manufacturer and supplier pre-qualification documents, respond to Request for Inspection and Testing (RFIT), monitoring of work progress, room snagging, Undertake the progress and monitoring report of on-going works as assigned by the department head.Attend weekly coordination and technical meeting with client and main contractor regarding the status and progress of the ongoing project. Ensure all architectural drawing is fully coordinated with MEP drawings to avoid discrepancy on site implementation.Regularly interfaces with other engineering disciplines as well as other departments.

Project Involved:

Qatar Foundation Education City Project (State of Qatar)

BP# 8A Texas A&M College of Engineering

BP# 6B Qatar Foundation Housing Development Project,Lot B

BP# 4A Qatar National Convention Center (QNCC)

BP# 19.4 Central Plant (CP2)

BP# 7B1 Student Centre (Enabling Work)

BP# 9A Sidra Medical &Research Centre (SMRC) (Enabling Works)

BP# 7B Student Center a mixed-use complex

BP# 9 Sidra Medical & Research Center (SMRC)

Sidra Medical & Research Center

Project Description:

Sidra Medical and Research Center is the most ambitious healthcare project in the Gulf Region today. The project is funded by a $7.9 billion USD endowment from Qatar Foundation, the largest for a medical and research center anywhere in the world. It represents the vision of Her Highness SheikhaMozabint Nasser, Chairperson of Sidra, to provide the highest standards of patient care, medical education, and biomedical research in the region.

Sidra Medical and Research Centre is a turnkey contract includes the design, engineering, construction and outfitting of the hospital as well as conservation and maintenance. The medical centre will have the most modern and advanced medical technologies and operate under a paperless system. The objective is to create a medical environment backed by an image of quality and modernity to attract the best medical talent in the world. The complex will be comprised of six buildings occupying a total built-up area of 332,450 m2 approx. plus an infrastructure and grounds of 360,000 m2 approx. The buildings are as follows: A 190,000 m2 adult and children’s hospital comprised of seven floors plus a basement and holding 382 beds. A 42,000 m2 clinic comprised of six floors plus a basement. A 57,000 m2 underground parking garage andA 30,000 m2 above ground and fivefloors multi-level parking garageA 13,000 m2 general services building with two floors, A 450 m2 mosque, with total completion project cost of $3.3 billion USD

Bader H. AL Hussaini& Son Co.

AL-Khafgi Joint Operation (KJO) Kuwait Gulf Oil Co. & Saudi Aramco Built Govt.

Kingdom of Saudi Arabia

Site Project Architect Engineer, Nov.2002 – Nov.2005

Prepare complete details of estimated for new construction project comprising of scope of work, quantity of materials and man power calculation, man power rate schedule, bar chart, summary of estimated cost. Conduct ocular site inspection on-going new building construction project, Assigned in base maintenance department as Architect Engineer and other related works Joint inspection for all buildings, offices and housing facilities inside and outside of AGOC-KGOC request by routine and general maintenance regarding renovation and newly construction works

Project Involved:

Residential,Villas, Offices Building and Government Schools

P.C. Eugenio Construction

Manila, Philippines

Project Site Architect, Feb.2002 – Oct.2002

Prepares accomplishment report as per required by the management. Attend weekly coordination and technical meeting regarding the status and progress of the ongoing project. Estimating quantity of materials needed in the project job site. Responsible for the schedules of work to be done in daily basis, Coordinate with Engineer and workers, prepare progress billing.

Project Involved:

City Land Vito Cruz Tower (40 Story Offices & Condominium Building)

Premier Ready Mix Concrete Inc.

Manila, Philippines

Service Engineer, Oct-2001 – Jan.2002

Supervise the actual structure of pouring and joint Ocular site inspection. Give instruction to pump Crete operator and crews. Coordinate plant supervisor for dispatching of the ready mix trucks Consultant of the actual Estimate volume of concrete with site concrete engineers in the process of design configuration.

Project Involved:

Leighton Philip Morris Greenfield Project, Malabon City Hall, Makati Fly Over, Sheraton Marina Tower, Mega World Tower, City Land Mansion Tower, SM Corporate Building, Jollibee Food Chain, Mondragon Building, MRT 2 Main Station, Bliss Housing Tenements, Town Houses and Apartment

Millennium Erector Corporation (MEC)

Manila, Philippines

Resident Architect, Feb.2000 – Sept.2001

Assistant of the head engineering department, Attend bid conference with client and other participated contractors, estimate architectural plan and quantitiesmaterials needed in the project. Conduct site inspection for the project to be bid. Coordinate with site engineer and site architects. Coordinate with allsub-contractors. Monitoring monthly report of all projects, check all the accomplishment works of all sub-contractor based on the specification & plans.

Kenneth Construction & Management Corporation (KCMC)

Manila, Philippines

Site Project Architect, Jan-1998 – Feb.2000

Attend biding conference, estimating the quantities of materials needed in the project job site. Conduct site inspection for the project to be bid. Coordinate with site engineers and site architects. Recommend the sub-contractor progress billing, regularly update accomplishment report.

Project Involved:

IBM PLAZA (30 Story office Building)

LAND BANK General Head Quarters (35Story Office Building)

SM IBM (12 Story computer School Building)

Dynamic Advertising

Manila, Philippines

Structural Field Supervisor, Aug.1996 – Dec. 1997

Visiting all project job site check all the structural steel frame if they are all in proper installation and proportion. Direct supervisions to his workers and sub-contractors check the accomplishment work of the workers. Coordinate with the owners. Coordinate with the workers.

Tokyo kompo Co. LTD

13457-15 OazaIshioka City

Ibaraki-ken Japan

Designer / Supervisor, Oct.1989 – Oct.1995

Direct supervisions to his workers and check the accomplishment work of the workers, Scheduling work orders to be done in daily basis make accomplishment report Prepare new design of drawings to be used for new project.Coordinate with the workers. Responsible for determining the quality & suitability of materials needed for a particular job. Conduct actual field survey for the preparation of the new design.

Market Monitoring Company (MMC)

Manila, Philippines

Draftsman, Sept.1987 – Aug.1988

Prepare drawings for Architectural plans & Civil, Structural details. Coordinate with office workers.

City Club Boutique

Manila, Philippines

Interior Designer, Dec.1986 – Sept.1987

Design new Boutique store, coordinate with store managers and present new concept design, conduct site inspection for all new projects and provide accomplishment report. Check all accomplishment works complete by sub-contractor. Verification of existing works for modification & proposed project

Project Involved:

SM Shopping Malls (Makati City & Cebu City),Cinderella Boutique (Makati City)

Ali Mall Shopping Mall (Quezon City)

EDUCATION

Bachelor of Science in Architecture(BSAR)

National University

Manila, Philippines 1987

PROFESSION

Architect

NATIONALITY

Filipino

MEMBERSHIPS

United Filipino Architect Qatar (UFA-Q) Auxiliary (UAP-Q)

131st Infantry Division, (AFP)Philippine Army (PA) Officer

Fort Bonifacio, Taguig, Philippines

TRAINING&SEMINARS Attended

How to secure Building Permit Feb. 05, 2008

Doha State of Qatar

Preparing for Uncertainly during this Economic Crisis April 12, 2009

Qatar Green Building Guidelines March 29, 2010

The Application of LEED in Qatar

Understanding the challenges of sustainable building May 18, 2011

Student Center - Education City

New Modern Method of Design & Construction Feb. 24, 2014

LH238-Texas A&M University - Education City

LRT – Leading IIF (Injury & Incident Free)

Non-Electrician Operating in Low & High Voltage APAVE ELB080

Engineer WMS

LANGUAGES

English, Tagalog



Contact this candidate