OVERVIEW

Project Manager (can also fulfill a Superintendent role) able to communicate and establish a strong collaborative environment with all parties involved on the project (Owner/Developers, Partners, Architects, Engineers, Investors/Representatives, City Personnel & Contractors) from front-end to close-out.

QUALIFICATIONS

Construction - Multifamily Construction > Wrap, Podium, Garden Style, High- Density, Mixed-Use, etc.

- Currently fulfilling a Superintendent role as well as became the company’s first on-site APM to actively & successfully perform this hybrid role.

- Started out as an APM in my transition from Architecture to multifamily construction over 8 yrs. ago & have worked in the field 7 of the past 8 yrs.

- Experience with multifamily construction permits in the following cities:

o City of Richardson, Dallas, Mansfield, North Richland Hills, Allen, Plano

o City of Houston, Katy

o City of San Antonio

- Proficient, confident & strong from the front end of a project to the end of a project.

- Front End > Proposals, LOIs, Buyout, Contracts, SOW’s, P&P Bonds, SOV’s, W9’s, Cost-Coded Budgets, Submittals, RFIs, RFPs, RFQs, COR’s, CO’s, PO’s, etc.

- Middle > Scheduling, Look-Aheads, Sequencing, Job Cost Reports, Sub Meetings, Safety Meetings, Logs, Weekly Reports, Inspections, Monthly Draws, etc.

- End > Final Inspections, TCOs, C of O, Material Recaps, Closeout Docs, Final Releases & Affidavits, etc.

Architecture

- Project Coordinator of a Collaborative Design Team - Tilt-Wall, Metal

& Wood Frame Designs, Podiums, etc.

- Athletic Complexes & Remodels

- Site > Research_Field Verification_Design Development

- City Code > Planning_Zoning_Permits

- Schematics > Collages_Sketches_3D Modeling

- Program > Cost Estimate_Bidding_Schedule_Con Docs

- Construction Admin > Submittals_Field Reports_Punch Lists

- Urban Design > “People First”_Infill_Structure_Streets_Form

- Interiors > Design_Demolition_Remodeling_Flipping

- Building Information > Modeling_Technology

- Submittals, RFIs, RFPs, RFQs, ASIs

Technology

- Adobe > Photoshop_Illustrator_InDesign

- Autodesk > Revit_ArchiCAD_AutoCAD_Sketchbook_3ds Max

- AutoDesSys > Bonzai3d_Form-Z

- Rhinoceros > Flamingo_V-Ray

- Google Sketchup > Shaderlight Pro_V-Ray

- Marketing > Website Design _RFQs_RFPs

Tradesman

- Foundation > Concrete_Footers_Drives_Piers/Podiums

- Masonry & Stonework > Veneer_Brick_Flagstone

- Framing > Insulation > Drywall > Tape/Bed > Texture > Paint

- Insulation > Spray Foam_Batt

- Welding

- Landscaping

- Roofing

EXPERIENCE

TX Morrow – Dallas, TX

2018 – Present Superintendent / APM

• On-site APM / Superintendent of a collaborative team, involved on the following multifamily project:

o Galatyn Station – Richardson, TX

6-Story Wrap with 242 Units, 7-Story Cast-in-Place Garage with an Amenity Deck

& Pool at the 7th level, Clubhouse, 3 Elevators, Skybridge, Courtyard & Grille House.

7-Story Podium with 130 Units over 2 Levels of Parking, Courtyard, 1 Elevator, Skybridge & Dog Park.

DLC – Allen, TX

2013 – 2018 Project Manager / Asst. Superintendent

• Project Manager & Asst. Superintendent of a small & spread-out collaborative team, involved with the following multifamily projects:

o Regalia at the Park – Houston, TX

7-Story Podium, Wrap Design with 229 Units, 3-Level Cast-in-Place Garage, Clubhouse, Pool, Grille House & Courtyard.

o Dolce Living - West Gray – Houston, TX

7-Story Podium, Wrap Design with 201 Units, 3-Level Cast-in-Place Garage, Clubhouse, Pool, Grille House & Courtyard.

o Twin Creeks – Phase I – Allen, TX

4-Story Mixed-Use, Wrap and Garden Style Design with 374 Units, Attached/Detached Garages, Clubhouse, Pool, Grille House & Courtyard. o Mansfield South – Phase I & II – Mansfield, TX

3-Story Garden Style Design with 545 Units, Attached/Detached Garages, Clubhouse, Pool, Grille House & Courtyard.

o Mansfield on the Green – Phase I – Mansfield, TX

3-Story Garden Style Design with 308 Units, Attached/Detached Garages, Clubhouse, Pool, Grille House & Courtyard.

o Home Town – Phase I – North Richland Hills, TX

3-Story Wrap & Garden Style Design with 159 Units, Attached/Detached Garages, Clubhouse, Pool, Grille House & Courtyard. ICI – Addison, TX

2012 – 2013 Assistant Project Manager

• Assistant Project Manager on a collaborative team (Total of 1 APM, 1 PM, 1 Senior PM, & 8 Supers) that oversee the following Multi-Family projects: o The District at Memorial – Houston, TX

5-Story Wrap Design with 326 Units &

Pool atop a Pre-Cast Garage o The District at Medical Center – San Antonio, TX

4-Story Wrap Design with 303 Units &

Pre-Cast Garage o The District at Washington –

Houston, TX

5-Story Wrap with 400 Units & Pre-Cast

Garage o The District at Westborough – Katy, TX

3-Story Garden Design with 336 Units &

Attached/Detached Garages

Jacobs & Associates – Plano, TX

2011 – 2012 Architectural Project Coordinator & Designer

• Collaborative Design and Coordination of Commercial, Corporate, Industrial, Vehicular, Educational, & Religious Facilities, consisting of the following projects: o Toyota of Dallas (Van Tuyl) – Dallas, TX o Champions School of Real Estate – Plano, TX o Whitmore – Rockwall, TX o Raytheon – Plano, TX o A. Maceo Smith New Tech High School – Dallas, TX o Skyline High School – Gymnasium – Dallas, TX o Forester Athletic Complex – Press Box & Fieldhouse Renovation – Dallas, TX o Sprague Athletic Complex – Press Box & Fieldhouse Renovation – Dallas, TX

o Franklin Field – Turf Replacement – Dallas, TX

o Pleasant Grove Stadium – Turf Replacement – Dallas, TX o White’s Chapel UMC – Southlake, TX

• Develop 3D representations/schematics and master plans to better explain design decisions to the client.

• Prepare and develop preliminary design documents, permit issues and 100% construction documents.

• Field verification of construction sites or existing buildings as required for information gathering/observation.

• Project coordination with owner, contractor, and engineer, consisting of permits, design/plan city submissions/reviews, submittals, o/a/c meetings, field reports, pay apps, closeout documents, etc.

Hunter Homes – Dalhart, TX

May 2006 – 2011 Construction Tradesman

• Successfully worked on commercial and residential construction sites, contributing to a team and ensuring each job was executed accurately and on time. EDUCATION

2007 – 2011 Texas Tech University - Lubbock, Texas

• Graduated May of 2011 with a Bachelor of Science in Architecture. Summer 2010 Texas Tech School of Architecture Study Abroad

• Studied architecture, local culture, and traditions in Seville, Spain at the Texas Tech Center. REFERENCES Available Upon Request



Contact this candidate